Plan Review Details - Permit 20110399
Plan Review Stops For Permit 20110399
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-04-02 Cont ID  
Sent By rmcphers Date 2021-04-02 Time 09:10 Rev Time 0.00
Received By rmcphers Date 2021-04-02 Time 09:10 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-03-30 Cont ID  
Sent By rmcphers Date 2021-03-30 Time 13:13 Rev Time 0.00
Received By rmcphers Date 2021-03-30 Time 12:40 Sent To  
Notes
2021-03-30 13:13:06DECK FOR A TEMPORARY MOBILE TRAILER
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE SHOW THE DOOR MANEUVERING CLEARANCE (IN AND
 OUT OF THE EXISTING BUILDING) TO COMPLY WITH FBC
 ACCESSIBILITY 404.2.4 - THE OUTSWING DOOR AT THE
 BUILDING ENTRY NEEDS TO HAVE 18" CLEARANCE ON THE LATCH
 SIDE FROM THE DOOR OPENING TO THE HANDRAIL.
 2) RAMP LANDINGS NEED TO BE A MINIMUM DIMENSION OF 5' X
 5' - PLEASE SHOW THE LANDING DIMENSIONS AT THE HIGHER
 SIDE OF THE RAMP FBC 405.7.4 CHANGE IN DIRECTION.
 RAMPS THAT CHANGE DIRECTION BETWEEN RUNS AT LANDINGS
 SHALL HAVE A CLEAR LANDING 60 INCHES (1525 MM) MINIMUM
 BY 60 INCHES (1525 MM) MINIMUM.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-12-02 Cont ID  
Sent By rmcphers Date 2020-12-02 Time 14:41 Rev Time 0.00
Received By rmcphers Date 2020-12-02 Time 12:39 Sent To  
Notes
2020-12-02 14:41:10TEMPORARY TRAILER
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE THE TRAILER "STATE APPROVAL" DRAWINGS
 REVIEWED AND APPROVED BY A 3RD PARTY FBC 107.3
 EXCEPTION (1).
 2) PLEASE PROVIDE TRAILER TIE DOWN DETAILS FROM AN
 ARCHITECT OR ENGINEER TO COMPLY WITH WIND LOADS PER FBC
 1609 (SHOW THE WIND DESIGN CRITERIA USED ON THE
 DRAWING)
 3) PLEASE PROVIDE STAIR, RAMP AND HANDRAIL DETAILS TO
 COMPLY WITH FBC CHAPTER 10 AND FBC ACCESSIBILITY
 REQUIREMENTS.
 4) PLEASE PROVIDE GUARD RAIL DETAILS IF REQUIRED PER
 FBC 1015.2
 5) PLEASE SHOW THE DISTANCE FROM THE EXISTING BUILDINGS
 TO COMPLY WITH FBC 602 (BASED ON THE TRAILER
 CONSTRUCTION TYPE AND WALL FIRE RATINGS)
 6) PLEASE SHOW THE DOOR MANEUVERING CLEARANCE (IN AND
 OUT OF THE EXISTING BUILDING) TO COMPLY WITH FBC
 ACCESSIBILITY 404.2.4 (WHICH SHALL BE A LEVEL LANDING
 PER FBC 404.2.4.4)
 7) PLEASE DESCRIBE THE USE FOR THE TRAILER TO HELP
 DETERMINE THE OCCUPANCY CLASSIFICATION - USE, QUANTITY
 OF HAZARDOUS CHEMICALS ETC.
 8) PLEASE PROVIDE SIGNED AND SEALED CONCRETE DECK,
 RETAINING WALLS AND PAD DETAILS FROM AN ARCHITECT OR
 ENGINEER.
 9) PLEASE PROVIDE SIGNED AND SEALED CANOPY DETAILS FROM
 AN ARCHITECT OR ENGINEER TO COMPLY WITH THE WIND LOADS
 PER FBC 3105.3 AND 1609 (SHOW THE WIND DESIGN CRITERIA
 USED ON THE DRAWINGS) - 3105.3.4.1 FABRIC USED FOR
 AWNINGS OR FABRIC-COVERED FRAMES SHALL MEET THE FLAME
 PROPAGATION PERFORMANCE CRITERIA OF NFPA 701 OR HAVE A
 FLAME SPREAD INDEX NOT GREATER THAN 25 WHEN TESTED IN
 ACCORDANCE WITH ASTM E84 OR UL 723.
 10) PLEASE PROVIDE THE FRONT PAGES OF THE FLORIDA STATE
 PRODUCT APPROVALS FOR THE PROVIDED INSTALLATION
 DRAWINGS FOR THE STOREFRONT WINDOWS AND DOOR.
 11) PLEASE SHOW THE REQUIRED DESIGN WIND PRESSURES TO
 BE USED FOR EXTERIOR COMPONENT (AREA OF NEW DOOR) FBC
 1603.1.4
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-03-24 Cont ID  
Sent By jleahy Date 2021-03-24 Time 14:30 Rev Time 0.00
Received By jleahy Date 2021-03-24 Time 14:25 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-12-07 Cont ID  
Sent By jleahy Date 2020-12-07 Time 17:35 Rev Time 0.00
Received By jleahy Date 2020-12-07 Time 17:27 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2021-04-06 Cont ID  
Sent By pleduc Date 2021-04-06 Time   Rev Time 0.00
Received By pleduc Date 2021-04-06 Time 10:46 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-03-22 Cont ID  
Sent By pleduc Date 2021-03-22 Time   Rev Time 0.00
Received By pleduc Date 2021-03-22 Time 13:43 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-11-20 Cont ID  
Sent By pleduc Date 2020-11-20 Time   Rev Time 0.00
Received By pleduc Date 2020-11-20 Time 13:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-04-06 Cont ID  
Sent By lmarchan Date 2021-04-06 Time 13:33 Rev Time 0.00
Received By lmarchan Date 2021-04-01 Time 11:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-03-30 Cont ID  
Sent By rmcphers Date 2021-03-30 Time 13:16 Rev Time 0.00
Received By rmcphers Date 2021-03-19 Time 07:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-08 Cont ID  
Sent By lmarchan Date 2020-12-08 Time 13:36 Rev Time 0.00
Received By lmarchan Date 2020-11-19 Time 11:35 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2020-11-25 Cont ID  
Sent By medwards Date 2020-11-25 Time 15:51 Rev Time 0.00
Received By medwards Date 2020-11-25 Time 15:34 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-03-24 Cont ID  
Sent By ccole Date 2021-03-24 Time 09:10 Rev Time 0.00
Received By ccole Date 2021-03-23 Time 17:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-12-03 Cont ID  
Sent By ccole Date 2020-12-03 Time 14:47 Rev Time 0.00
Received By ccole Date 2020-12-03 Time 10:32 Sent To  
Notes
2020-12-03 14:47:301ST REVIEW FBC-2017 PLUMBING
 PERMIT- 20110399
 12/3/2020
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017
 FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 201
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
 PLEASE NOTE THE PLUMBING REVIEW OF THE PROPOSED PROJECT
 DID NOT INCLUDE A REVIEW OF THE PLUMBING SYSTEMS,
 FIXTURES, EQUIPMENT, DEVICES ETC. INSTALLED INSIDE THE
 STERIS MOBILE SPD UNIT. AT THE TIME OF THIS REVIEW IT
 WAS NOT DETERMINED IF THE WPB BUILDING DEPT. WILL BE
 THE AGENCY RESPONSIBLE TO PERFORM PLAN REVIEWS AND
 INSPECTIONS OF THE UNIT.
  
 1) PROVIDE DOCUMENTATION TO VERIFY THE STERIS MOBILE
 SPD UNIT IS A FL. STATE APPROVED MANUFACTURED BUILDING
 PER SECTION 107.3 (1) WPB AMENDMENTS TO THE FBC-17.
  
 2) REFER TO SECTIONS 449.1.1 & 499.3.3 FBC B: PROVIDE
 DOCUMENTATION TO VERIFY THE MOBILE UNIT HAS BEEN
 APPROVED FOR USE AT THE HOSPITAL BY AHCA- AGENCY FOR
 HEALTH CARE ADMINISTRATION; AND HAS BE DESIGNED AND
 CONSTRUCTED IN ACCORDANCE WITH THE APPLICABLE
 REQUIREMENTS OF THE FBC-17, THE GUIDELINES FOR DESIGN
 AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT
 FACILITIES, PART 3 OUTPATIENT FACILITIES, CHAPTER 3.13
 SPECIFIC REQUIREMENTS FOR MOBILE, TRANSPORTABLE, AND
 RELOCATABLE UNITS.
  
 3) SHEET P3.0: PROVIDE WATER SERVICE PIPE AND WATER
 DISTRIBUTION PIPE SPECIFICATIONS- SECTIONS 605.3 &
 605.4 FBC P.
  
 4) P3.0: PROVIDE SANITARY SEWER PIPE AND SANITARY
 DRAINAGE PIPE SPECIFICATIONS- SECTION 702 FBC P. REFER
 TO SECTION 603.2 FOR WATER SERVICE AND SERVICE PIPE
 MATERIALS IN THE SAME TRENCH AND VERIFY COMPLIANCE.
  
 5) P3.0: PROVIDE THE EFFICIENCY RATINGS OF THE WATER
 HEATERS IN THE SCHEDULE- TABLE 404.2 FBC EC.
  
 6) PROVIDE HOT WATER PIPE INSULATIONS SPECIFICATIONS-
 SECTION 607.5 FBC P.
  
 7) P3.2: REFER TO SECTION 712.3.1 FBC P AND VERIFY THE
 EXISTING SEWAGE EJECTOR HAS LARGE ENOUGH CAPACITY AND
 HEAD TO EJECT THE INCREASED SEWER LOAD.
  
 8) P3.1 & P3.2: REFER TO PAGE 50 OF THE STERIS MOBILE
 SPD GUIDE. THE GUIDE RECOMMENDS INSTALLATION OF A P
 TRAP ON THE SEWER LINE TO MINIMIZE POTENTIAL ODORS.
  
 9) P3.1 & P3.2: INDICATE WHICH EQUIPMENT SHOWN ON PAGE
 8 OF THE MOBILE MANUAL IS DISCHARGING WASTE AND
 CONDENSATION. PLEASE NOTE THAT AN APPROVED DILUTION OR
 NEUTRALIZING DEVICE SHALL BE REQUIRED FOR THE SANITARY
 AND CONDENSATION DRAIN SYSTEMS IF CORROSIVE LIQUIDS,
 SPENT ACIDS OR OTHER HARMFUL CHEMICALS THAT DESTROY OR
 INJURE A DRAIN, SEWER, SOIL OR WASTE PIPE, OR CREATE
 NOXIOUS OR TOXIC FUMES OR INTERFERE WITH SEWAGE
 TREATMENT PROCESSES ARE DRAINING FROM FIXTURES,
 APPLIANCE, OR EQUIPMENT INSIDE THE MOBILE UNIT. AT THIS
 TIME THERE HAS NOT BEEN A REVIEW OF THE PLUMBING
 SYSTEMS AND PROCESSES THAT WILL OCCUR IN THE UNIT. SUCH
 DEVICES SHALL BE AUTOMATICALLY PROVIDED WITH A
 SUFFICIENT SUPPLY OF DILUTING WATER OR NEUTRALIZING
 MEDIUM SO AS TO MAKE THE CONTENTS NON-INJURIOUS BEFORE
 DISCHARGE INTO THE DRAINAGE SYSTEM. THE NATURE OF THE
 CORROSIVE OR HARMFUL WASTE AND THE METHOD OF ITS
 TREATMENT OR DILUTION SHALL BE APPROVED PRIOR TO
 INSTALLATION.
  
 10) P3.2: IT APPEARS THAT PUMPS WILL BE REQUIRED FOR
 THE DRAINAGE FROM THE WATER HEATER AND WATER SOFTENER
 TO DISCHARGE INTO THE EXISTING FLOOR DRAIN- SECTION
 314.1 FBC P. PLEASE REVISE THE DETAILS.
  
 11) P3.1 & P3.2: SHOW THE LOCATIONS OF THE REQUIRED
 CLEANOUTS FOR THE SEWER PIPE- SECTIONS 708.1.3 &
 708.1.4 FBC P.
  
 12) P3.0: PROVIDE EQUIPMENT SCHEDULES FOR THE
 RECIRCULATION PUMP AND MIXING VALVE- SECTION 607.1.2
 FBC P.
  
 13) P3.0 & P3.2: INDICATE HOW THE WATER FILTERING
 SYSTEM WILL BE PROTECTED AGAINST CONTAMINATION- SECTION
 608.3 FBC P.
  
 14) P3.2, BACKFLOW PREVENTER: A FLORIDA LICENSED
 PLUMBING CONTRACTOR SHALL OBTAIN A SEPARATE PERMIT FOR
 INSTALLATION OF THE POTABLE WATER SERVICE BACKFLOW
 PREVENTER IN ACCORDANCE WITH SECTION 105.1 WPB AND
 SECTION 90-33 WPB CODE OF ORDINANCES. THE DEVICE SHALL
 BE TESTED AND CERTIFIED BY THE WPB UTILITIES DEPARTMENT
 PRIOR TO FINAL INSPECTION BY THE WPB BUILDING
 DEPARTMENT. PLEASE CONTACT THE WPB UTILITIES CENTRAL
 OPERATIONS DEPT. AT 561-822-2210 FOR FURTHER
 INFORMATION.
  
 15) PROVIDE A PLUMBING SUB-PERMIT APPLICATION- SECTION
 105.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 CCOLE@WPB.
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-04-02 Cont ID  
Sent By rmcphers Date 2021-04-02 Time 09:10 Rev Time 0.00
Received By rmcphers Date 2021-04-02 Time 09:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-03-30 Cont ID  
Sent By rmcphers Date 2021-03-30 Time 13:16 Rev Time 0.00
Received By rmcphers Date 2021-03-30 Time 13:16 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-12-02 Cont ID  
Sent By rmcphers Date 2020-12-02 Time 14:53 Rev Time 0.00
Received By rmcphers Date 2020-12-02 Time 14:53 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2021-04-01 Cont ID  
Sent By eschneid Date 2021-04-01 Time 16:12 Rev Time 0.25
Received By eschneid Date 2021-04-01 Time 16:12 Sent To  
Notes
2021-04-01 16:04:51PASSED W/PROVISOS
  
 1) ZONING WILL NOT SIGN OFF ON THE TRAILER CERTIFICATE
 OF OCCUPANCY UNTIL THE LANDSCAPE INSTALLATION APPROVED
 AS PART OF THE LANDSCAPE PERMIT (20060592) IS COMPLETED
 AND PASSES INSPECTION. IF THE LANDSCAPE INSTALLATION IS
 NEARING COMPLETION BUT IS NOT FULLY COMPLETED WHEN THE
 TRAILER IS READY FOR OCCUPANCY, ZONING WILL APPROVE THE
 ISSUANCE OF A TEMPORARY CERTIFICATE OF OCCUPANCY FOR
 USE OF THE TRAILER UNTIL THE LANDSCAPE INSTALLATION IS
 COMPLETED.
  
 2) THE TRAILER IS ONLY AUTHORIZED TO REMAIN ON THE SITE
 UNTIL THE RENOVATION OF THE STERILE PROCESSING
 FACILITIES (PERMIT 20110398) IS COMPLETED AND PASSES
 FINAL INSPECTION (104) TO PERMIT OCCUPANCY. IN NO EVENT
 WILL ZONING APPROVE THE ISSUANCE OF THE 104 FINAL
 INSPECTION FOR PERMIT 20110398 WITHOUT THE LANDSCAPE
 PERMIT (20060592) HAVING PASSED FINAL INSPECTION.

Review Stop Z ZONING
Rev No 2 Status P Date 2021-03-24 Cont ID  
Sent By eschneid Date 2021-03-24 Time 13:27 Rev Time 0.25
Received By eschneid Date 2021-03-24 Time 09:26 Sent To  
Notes
2021-03-24 13:54:03PASSED W/PROVISOS
  
 1) ZONING WILL NOT SIGN OFF ON THE TRAILER CERTIFICATE
 OF OCCUPANCY UNTIL THE LANDSCAPE INSTALLATION APPROVED
 AS PART OF THE LANDSCAPE PERMIT (20060592) IS COMPLETED
 AND PASSES INSPECTION. IF THE LANDSCAPE INSTALLATION IS
 NEARING COMPLETION BUT IS NOT FULLY COMPLETED WHEN THE
 TRAILER IS READY FOR OCCUPANCY, ZONING WILL APPROVE THE
 ISSUANCE OF A TEMPORARY CERTIFICATE OF OCCUPANCY FOR
 USE OF THE TRAILER UNTIL THE LANDSCAPE INSTALLATION IS
 COMPLETED.
  
 2) THE TRAILER IS ONLY AUTHORIZED TO REMAIN ON THE SITE
 UNTIL THE RENOVATION OF THE STERILE PROCESSING
 FACILITIES (PERMIT 20110398) IS COMPLETED AND PASSES
 FINAL INSPECTION (104) TO PERMIT OCCUPANCY. IN NO EVENT
 WILL ZONING APPROVE THE ISSUANCE OF THE 104 FINAL
 INSPECTION FOR PERMIT 20110398 WITHOUT THE LANDSCAPE
 PERMIT (20060592) HAVING PASSED FINAL INSPECTION.

Review Stop Z ZONING
Rev No 1 Status F Date 2020-12-08 Cont ID  
Sent By eschneid Date 2020-12-08 Time 12:01 Rev Time 0.75
Received By eschneid Date 2020-12-08 Time 12:01 Sent To  
Notes
2020-12-08 12:15:44FAILED
  
 1) ZONING WILL NOT APPROVE THE PERMIT FOR THE
 INSTALLATION OF THE TRAILER (20110399) UNTIL EVIDENCE
 THAT THE LANDSCAPE WORK APPROVED BY THE LANDSCAPE
 PERMIT (20060592) HAS BEGUN. EVIDENCE OF THE START OF
 LANDSCAPE MEANS PLANTS ON-SITE AND GOING INTO THE
 GROUND OR CURB WORK STARTED, IF REQUIRED.
  
 2) ZONING WILL NOT SIGN OFF ON THE TRAILER CERTIFICATE
 OF OCCUPANCY UNTIL THE LANDSCAPE INSTALLATION APPROVED
 AS PART OF THE LANDSCAPE PERMIT (20060592) IS COMPLETED
 AND PASSES INSPECTION. IF THE LANDSCAPE INSTALLATION IS
 NEARING COMPLETION BUT IS NOT FULLY COMPLETED WHEN THE
 TRAILER IS READY FOR OCCUPANCY, ZONING WILL APPROVE THE
 ISSUANCE OF A TEMPORARY CERTIFICATE OF OCCUPANCY FOR
 USE OF THE TRAILER UNTIL THE LANDSCAPE INSTALLATION IS
 COMPLETED.
  
 3) THE TRAILER IS ONLY AUTHORIZED TO REMAIN ON THE SITE
 UNTIL THE RENOVATION OF THE STERILE PROCESSING
 FACILITIES (PERMIT 20110398) IS COMPLETED AND PASSES
 FINAL INSPECTION (104) TO PERMIT OCCUPANCY. IN NO EVENT
 WILL ZONING APPROVE THE ISSUANCE OF THE 104 FINAL
 INSPECTION WITHOUT THE LANDSCAPE PERMIT (20060592)
 HAVING PASSED FINAL INSPECTION.
  
 4) ZONING WILL NOT APPROVE THE PERMIT UNTIL A TREE
 ALTERATION PERMIT HAS BEEN SUBMITTED TO AND APPROVED BY
 THE PLANNING DIVISION. THE TREE(S) IN CONFLICT WITH THE
 TRAILER PLACEMENT MAY NOT BE REMOVED UNTIL THE TREE
 ALTERATION PERMIT IS APPROVED.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446