Plan Review Details - Permit 20110393
Plan Review Stops For Permit 20110393
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-04-02 Cont ID  
Sent By rmcphers Date 2021-04-02 Time 08:58 Rev Time 0.00
Received By rmcphers Date 2021-04-02 Time 08:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-11-20 Cont ID  
Sent By rmcphers Date 2020-11-20 Time 15:52 Rev Time 0.00
Received By rmcphers Date 2020-11-20 Time 09:42 Sent To  
Notes
2020-11-20 15:51:18PATIO AWNINGS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) SHOW THE SIGNAGE REQUIREMENT PER FBC 3105.5.3
 STRUCTURES DESIGNED TO BE READILY REMOVED OR
 REPOSITIONED DURING PERIODS OF HIGH WIND VELOCITY SHALL
 BE POSTED WITH A LEGIBLE AND READILY VISIBLE DECAL OR
 PAINTED INSTRUCTIONS TO THE OWNER OR TENANT TO REMOVE
 OR REPOSITION THE STRUCTURE OR PART THEREOF DURING SUCH
 PERIODS OF TIME AS ARE DESIGNATED BY THE U.S. WEATHER
 BUREAU AS BEING A HURRICANE WARNING OR ALERT.
 2) SHOW THE FIRE SPRINKLER REQUIREMENTS - YOUR ADDING A
 ROOFED AREA TO THE EXISTING SPRINKLERED FIRE AREA
 WITHOUT A FIRE BARRIER BETWEEN - FBC 202 FIRE AREA. THE
 AGGREGATE FLOOR AREA ENCLOSED AND BOUNDED BY FIRE
 WALLS, FIRE BARRIERS, EXTERIOR WALLS OR HORIZONTAL
 ASSEMBLIES OF A BUILDING. AREAS OF THE BUILDING NOT
 PROVIDED WITH SURROUNDING WALLS SHALL BE INCLUDED IN
 THE FIRE AREA IF SUCH AREAS ARE INCLUDED WITHIN THE
 HORIZONTAL PROJECTION OF THE ROOF OR FLOOR NEXT ABOVE.
 FBC 901.7 FIRE AREAS. WHERE BUILDINGS, OR PORTIONS
 THEREOF, ARE DIVIDED INTO FIRE AREAS SO AS NOT TO
 EXCEED THE LIMITS ESTABLISHED FOR REQUIRING A FIRE
 PROTECTION SYSTEM IN ACCORDANCE WITH THIS CHAPTER, SUCH
 FIRE AREAS SHALL BE SEPARATED BY FIRE BARRIERS
 CONSTRUCTED IN ACCORDANCE WITH SECTION 707 OR
 HORIZONTAL ASSEMBLIES CONSTRUCTED IN ACCORDANCE WITH
 SECTION 711, OR BOTH, HAVING A FIRE-RESISTANCE RATING
 OF NOT LESS THAN THAT DETERMINED IN ACCORDANCE WITH
 SECTION 707.3.10.
 3) THE STRUCTURAL CALCULATIONS PROVIDED DO NOT SHOW IN
 "ADOBE READER" AS ELECTRONICALLY SIGNED.
 4) THE STRUCTURAL CALCULATIONS ARE SHOWING A WIND SPEED
 OF 45MPH SHOULDN'T THE WIND SPEED BE 170MPH. FBC 1609
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-03-25 Cont ID  
Sent By pleduc Date 2021-03-25 Time   Rev Time 0.00
Received By pleduc Date 2021-03-25 Time 11:30 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-11-23 Cont ID  
Sent By pleduc Date 2020-11-23 Time   Rev Time 0.00
Received By pleduc Date 2020-11-23 Time 10:40 Sent To  
Notes
2020-11-23 10:46:42THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 4.6.7 BUILDING REHABILITATION.
 4.6.7.1 REHABILITATION WORK ON EXISTING BUILDINGS SHALL
 BE
 CLASSIFIED AS ONE OF THE FOLLOWING WORK CATEGORIES IN
 ACCORDANCE
 WITH 43.2.2.1:
 (1) REPAIR
 (2) RENOVATION
 (3) MODIFICATION
 (4) RECONSTRUCTION
 (5) CHANGE OF USE OR OCCUPANCY CLASSIFICATION
 (6) ADDITION
 4.6.7.2 REHABILITATION WORK ON EXISTING BUILDINGS SHALL
 COMPLY
 WITH CHAPTER 43.
  
 CHAPTER 43 BUILDING REHABILITATION
  
 43.1.2 APPLICABLE REQUIREMENTS.
 43.1.2.1 ANY BUILDING UNDERGOING REPAIR, RENOVATION,
 MODIFICATION,
 OR RECONSTRUCTION (SEE 43.2.2.1.1 THROUGH 43.2.2.1.4)
 SHALL COMPLY
 WITH BOTH OF THE FOLLOWING:
 (1) REQUIREMENTS OF THE APPLICABLE EXISTING OCCUPANCY
 CHAPTERS
 (SEE CHAPTERS 13, 15, 17, 19, 21, 23, 24, 26, 29, 31,
 33, 37,
 39, 40, AND 42)
 (2) REQUIREMENTS OF THE APPLICABLE SECTION OF THIS
 CHAPTER (SEE
 SECTIONS 43.3, 43.4, 43.5, AND 43.6)
  
 1) THERE ARE NO INDICATIONS OF FIRE SPRINKLER
 PROTECTION.
  
 THE PROPOSED IS AN EXTENSION OF THE BUILDING WITH
 ASSEMBLY OCUPANCY AND FIRE SPRINKLER& FIRE ALARM
 PROTECTION IS REQUIRED TO BE EXTENDED INTO THE NEW
 SPACES.
  
 PLEASE REVIEW, CORRECT AND PROVIDE AN APPLICABLE NOTE
 OF ACKNOWLEDGEMENT
  
  
 2) ANY FIRE SPRINKLER & FIRE ALARM WORK, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS AND SHOP
 DRAWINGS.
  
 PLEASE REVIEW, CORRECT AND PROVIDE AN APPLICABLE NOTE
 OF ACKNOWLEDGEMENT
  
  
 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-04-13 Cont ID  
Sent By cthroop Date 2021-04-13 Time 08:23 Rev Time 0.00
Received By cthroop Date 2021-03-24 Time 14:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-02 Cont ID  
Sent By lmarchan Date 2020-12-02 Time 09:23 Rev Time 0.00
Received By lmarchan Date 2020-11-10 Time 14:36 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-04-02 Cont ID  
Sent By rmcphers Date 2021-04-02 Time 08:58 Rev Time 0.00
Received By rmcphers Date 2021-04-02 Time 08:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-11-20 Cont ID  
Sent By rmcphers Date 2020-11-20 Time 15:51 Rev Time 0.00
Received By rmcphers Date 2020-11-20 Time 15:51 Sent To  
Notes
2020-11-20 15:51:51SEE BUILDING PLAN REVIEW

Review Stop Z ZONING
Rev No 2 Status P Date 2021-04-12 Cont ID  
Sent By eschneid Date 2021-04-12 Time 15:45 Rev Time 0.50
Received By eschneid Date 2021-04-12 Time 14:40 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-12-01 Cont ID  
Sent By eschneid Date 2020-12-01 Time 10:47 Rev Time 1.00
Received By eschneid Date 2020-12-01 Time 10:47 Sent To  
Notes
2020-12-01 13:54:29FAILED
  
 1) THE INSTALLATION OF THE PERMANENT RETRACTABLE ROOF
 STRUCTURE IS A MODIFICATION TO THE APPROVED SITE PLAN
 AND REQUIRES THE SUBMITTAL OF A MINOR PLANNED
 DEVELOPMENT APPLICATION TO THE PLANNING DIVISION. THE
 PERMIT WILL NOT BE PASSED BY ZONING UNTIL THE MINOR
 AMENDMENT IS APPROVED.
  
 2) THE PERMIT APPLICATION STATES THAT THIS PERMIT ONLY
 COVERS ROOF STRUCTURE #1. YOU NEED TO ONLY SUBMIT THE
 INFORMATION FOR STRUCTURE #1. ON THE PLANS THAT SHOW
 BOTH STRUCTURES, YOU NEED TO MARK OUT STRUCTURE #2,
 WHICH WILL REQUIRE A SEPARATE PERMIT.
  
 3) STRUCTURE #1 MEETS ZONING REQUIREMENTS AND CAN BE
 APPROVED BY ZONING ONCE THE MINOR AMENDMENT IS
 SUBMITTED AND REVIEWED. WHILE NOT PART OF THIS PERMIT,
 ZONING LOOKED AT STRUCTURE #2 AND WILL NEED
 CLARIFICATION AS PART OF THE MINOR AMENDMENT ON HOW THE
 EXISTING OAK TREE CANOPY ON EITHER SIDE OF THE PROPOSED
 STRUCTURE ARE AFFECTED ITS INSTALLATION.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446