Plan Review Details - Permit 20110350
Plan Review Stops For Permit 20110350
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-11-30 Cont ID  
Sent By ppetty Date 2020-11-30 Time 12:46 Rev Time 0.00
Received By ppetty Date 2020-11-30 Time 12:46 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-11-20 Cont ID  
Sent By pleduc Date 2020-11-20 Time   Rev Time 0.00
Received By pleduc Date 2020-11-17 Time 15:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-01-14 Cont ID  
Sent By medwards Date 2021-01-14 Time 09:21 Rev Time 0.00
Received By medwards Date 2021-01-13 Time 14:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-30 Cont ID  
Sent By ppetty Date 2020-11-30 Time 12:47 Rev Time 0.00
Received By ppetty Date 2020-11-10 Time 16:36 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-01-14 Cont ID  
Sent By medwards Date 2021-01-14 Time 09:21 Rev Time 0.00
Received By medwards Date 2021-01-14 Time 09:21 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-11-12 Cont ID  
Sent By medwards Date 2020-11-12 Time 13:37 Rev Time 0.00
Received By medwards Date 2020-11-12 Time 13:37 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-01-14 Cont ID  
Sent By medwards Date 2021-01-14 Time 09:20 Rev Time 0.00
Received By medwards Date 2021-01-14 Time 09:20 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-11-12 Cont ID  
Sent By medwards Date 2020-11-12 Time 13:48 Rev Time 0.00
Received By medwards Date 2020-11-12 Time 13:46 Sent To  
Notes
2020-11-12 13:50:17AN ENGINEER CAN NOT SELF CERTIFY HIS DIGITAL SIGNATURE
 AND SEAL.
  
 PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN
 (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE
 SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE
 DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE
 WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE
 CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET
 MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL
 TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved