Plan Review Details - Permit 20101235
Plan Review Stops For Permit 20101235
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2020-11-16 Cont ID  
Sent By cpuell Date 2020-11-16 Time 11:05 Rev Time 0.00
Received By cpuell Date 2020-11-16 Time 11:05 Sent To  
Notes
***NONE***

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2020-10-27 Cont ID  
Sent By cpuell Date 2020-10-27 Time 18:34 Rev Time 0.00
Received By cpuell Date 2020-10-27 Time 18:34 Sent To  
Notes
2020-10-27 18:35:07PLEASE EMAIL A SITE PLAN SHOWING THE EXACT LOCATION
 WHERE THE WORK IS BEING DONE TO [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-12-15 Cont ID  
Sent By rmcphers Date 2021-12-15 Time 09:29 Rev Time 0.00
Received By rmcphers Date 2021-12-15 Time 09:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-05-04 Cont ID  
Sent By rmcphers Date 2021-05-04 Time 12:50 Rev Time 0.00
Received By rmcphers Date 2021-05-04 Time 12:50 Sent To  
Notes
2021-05-04 12:52:28ANTENNA
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE THE STRUCTURAL DETAILS AND
 CALCULATIONS FROM A DESIGN PROFESSIONAL FOR THE POLE
 AND MOUNTED ANTENNA SHOWING FOUNDATION AND ATTACHMENTS
 TO COMPLY WITH THE WIND LOADS PER FBC 1609
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2021-04-27 Cont ID  
Sent By equinone Date 2021-04-27 Time 11:10 Rev Time 0.00
Received By equinone Date 2021-04-27 Time 11:08 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-12-04 Cont ID  
Sent By equinone Date 2020-12-04 Time 10:24 Rev Time 0.00
Received By equinone Date 2020-12-04 Time 10:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-11-20 Cont ID  
Sent By equinone Date 2020-11-05 Time 14:43 Rev Time 0.00
Received By equinone Date 2020-11-05 Time 14:43 Sent To  
Notes
2020-11-05 14:44:36ENRIQUE QUINONEZ
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  
 REVIEW STATUS: FAILED
  
 SEE BELOW:
  
 FS471, FS481, DOCUMENTS PREPARED BY AN ARCHITECT OR
 ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 SIGNED, SEALED, DATED ORIGINALS. A SCAN OF A SIGNED
 PLAN IS NOT CONSIDERED AN ORIGINAL.
  
 EITHER SUBMIT A DIGITALLY OR ELECTRONICALLY SIGNED
 PLAN, OR YOU CAN MAIL (OR DROP OFF) ONE ORIGINAL SIGNED
 AND SEALED PAPER ORIGINAL WITH A WET SIGNATURE.
  
 ENRIQUE QUINONEZ
 ELECTRICAL PLANS EXAMINER
 DEVELOPMENT SERVICES
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
  
 FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS,
 561-805-6746.
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status N Date 2022-03-21 Cont ID  
Sent By shill Date 2022-03-21 Time 07:17 Rev Time 0.00
Received By shill Date 2022-03-21 Time 07:17 Sent To  
Notes
2022-03-21 07:17:41PROVISO: OBTAIN ROW PERMITS
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-07-01 Cont ID  
Sent By gpatrie Date 2021-07-01 Time 10:21 Rev Time 0.00
Received By gpatrie Date   Time   Sent To  
Notes
2021-07-01 10:21:05FDOT PERMIT REQUIRED FOR INSTALLATION OF POLE ON
 BROADWAY.
 PULLBOX LAT/LONG REQUIRED FOR 37TH ST.
  
 CONTACT: [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2022-03-21 Cont ID  
Sent By shill Date 2022-03-21 Time 07:21 Rev Time 0.00
Received By shill Date 2021-12-07 Time 08:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-07-02 Cont ID  
Sent By lmarchan Date 2021-07-02 Time 11:05 Rev Time 0.00
Received By lcrespo Date 2021-04-20 Time 10:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-12-15 Cont ID  
Sent By lmarchan Date 2020-12-15 Time 14:06 Rev Time 0.00
Received By lmarchan Date 2020-12-02 Time 15:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-05 Cont ID  
Sent By equinone Date 2020-11-05 Time 14:43 Rev Time 0.00
Received By equinone Date 2020-10-26 Time 08:04 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status F Date 2021-12-15 Cont ID  
Sent By rmcphers Date 2021-12-15 Time 09:22 Rev Time 0.00
Received By rmcphers Date 2021-12-15 Time 09:22 Sent To  
Notes
2021-12-15 09:27:48SIGNATURE REVIEW
  
 DRAWINGS BELOW LABELED IN PROJECTDOX DO NOT SHOW AS
 DIGITALLY SIGNED IN ADOBE READER -
  
 RAYCAP_POLE DESIGN_24-FOOT POLE-09-28-2021.PDF
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-04-27 Cont ID  
Sent By equinone Date 2021-04-27 Time 11:11 Rev Time 0.00
Received By equinone Date 2021-04-27 Time 11:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-12-04 Cont ID  
Sent By equinone Date 2020-12-04 Time 10:24 Rev Time 0.00
Received By equinone Date 2020-12-04 Time 10:24 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-11-05 Cont ID  
Sent By equinone Date 2020-11-05 Time 14:42 Rev Time 0.00
Received By equinone Date 2020-11-05 Time 14:42 Sent To  
Notes
2020-11-05 14:43:16ENRIQUE QUINONEZ
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  
 FS471, FS481, DOCUMENTS PREPARED BY AN ARCHITECT OR
 ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 SIGNED, SEALED, DATED ORIGINALS. A SCAN OF A SIGNED
 PLAN IS NOT CONSIDERED AN ORIGINAL.
  
 EITHER SUBMIT A DIGITALLY OR ELECTRONICALLY SIGNED
 PLAN, OR YOU CAN MAIL (OR DROP OFF) ONE ORIGINAL SIGNED
 AND SEALED PAPER ORIGINAL WITH A WET SIGNATURE.
  
 ENRIQUE QUINONEZ
 ELECTRICAL PLANS EXAMINER
 DEVELOPMENT SERVICES
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
  
 FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS,
 561-805-6746.
  

Review Stop Z ZONING
Rev No 3 Status F Date 2022-01-20 Cont ID  
Sent By ckimmerl Date 2022-01-20 Time 09:54 Rev Time 0.00
Received By ckimmerl Date 2022-01-20 Time 09:24 Sent To  
Notes
2022-01-20 09:35:021. PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED
 SURVEYOR, WHICH SHOWS THE POLE LOCATION, UNDERGROUND
 CONDUIT PATH, AND THE RIGHT-OF-WAY LINE SO THAT STAFF
 CAN VERIFY THAT THE WIRELESS COMMUNICATION FACILITY AND
 UNDERGROUND ELECTRIC CONNECTIONS ARE WITHIN THE
 RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY.
 - PLEASE PROVIDE A COMPLETE SURVEY SHOWING THE FULL
 SCOPE OF WORK.
  
 2. THE SUBMITTED COMMUNICATION FACILITY PLACEMENT
 PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO
 THIS PERMIT BEING APPROVED. THE PLANS INCLUDED WITH
 THIS ELECTRICAL PERMIT MUST MATCH THE PLANS APPROVED
 WITH THE AFOREMENTIONED PERMIT.
  
 3. SHEET T1 LISTS THE SCOPE OF WORK INCLUDES THE
 INSTALLATION OF AN ENCLOSURE CABINET. SHEET C4 IS
 LABELED AS ?ENCLOSURE DETAILS? BUT THE PLAN DOESN?T
 SEEM TO SHOW AN ENCLOSURE CABINET. PLEASE CLARIFY WHAT
 THIS MEANS, IS THE ?CABINET? JUST THE RADIO BAYS AND
 METER/EQUIPMENT ACCESS? THE CITY DOES NOT PERMIT
 FREESTANDING OR POLE MOUNTED CABINETS.
  
 4. POLE STEALTH DESIGN MEETS CITY STANDARDS.
  
 NOTE: PRIOR TO BEGINNING THE PLACEMENT OF THE POLE, THE
 UNDERGROUND FIBER, THE HANDHOLES, ETC. A RIGHT-OF-WAY
 USE PERMIT MUST BE APPROVED BY THE CITY'S ENGINEERING
 SERVICES DIVISION.
  
  
 CHRIS KIMMERLY @ (561) 822-1426
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status F Date 2021-05-20 Cont ID  
Sent By eschneid Date 2021-05-20 Time 16:08 Rev Time 0.25
Received By eschneid Date 2021-05-20 Time 10:42 Sent To  
Notes
2021-05-20 16:15:57FAILED
  
 1) THE SUBMITTED COMMUNICATION FACILITY PLACEMENT
 PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO
 THIS PERMIT BEING APPROVED. THE PLANS INCLUDED WITH
 THIS ELECTRICAL PERMIT MUST MATCH THE PLANS APPROVED
 WITH THE AFOREMENTIONED PERMIT.
  
 THE STEALTH POLE AND ITS LOCAITON MEET CITY STANDARDS.
  
 NOTE: PRIOR TO BEGINING THE PLACEMENT OF THE POLE, THE
 UNDERGROUND FIBER, THE HANDHOLES, ETC. A RIGHT-OF-WAY
 USE PERMIT MUST BE APPROVED BY THE CITY'S ENGINEERING
 SERVICES DIVISION.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date 2020-12-15 Cont ID  
Sent By eschneid Date 2020-12-15 Time 13:06 Rev Time 0.25
Received By eschneid Date 2020-12-15 Time 13:06 Sent To  
Notes
2020-12-15 13:39:10FAILED
  
 1) PRIOR TO PERMITTING ANY WIRELESS COMMUNICATION
 FACILITIES, TO INCLUDE POLES, FIBER OR ELECTRICAL
 SERVICE, WITHIN THE RIGHT-OF-WAY, A COMMUNICATIONS
 FACILITIES PLACEMENT PERMIT APPLICATION - CITY
 RIGHTS-OF-WAY MUST BE SUBMITTED TO THE CITY'S BUILDING
 DIVISION AND APPROVED BY THE CITY'S PLANNING AND
 ENGINEERING SERVICES DIVISIONS. THE CITY HAS RECEIVED
 NO APPLICATION OF ANY TYPE FOR THIS LOCATION.
  
 2) THE CROSS SECTION SHEET E3 INCLUDES A NOTE THAT
 INCORRECTLY REFERENCING FT. LAUDERDALE'S STANDARDS.
 VERIFY THAT ALL PLANS REFERENCE WEST PALM BEACH
 REQUIREMENTS.
  
 3) THE HANDHOLES AND CONDUIT INSTALLATION REQUIRES A
 RIGHT-OF-WAY PERMIT FROM THE CITY'S ENGINEERING
 SERVICES DIVISION.
  
 THE USE OF THE STEALTH POLE MEETS CITY STANDARDS.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved