Plan Review Stops For Permit 20100743
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-03-15 Cont ID  
Sent By cpuell Date 2021-03-15 Time 14:07 Rev Time 0.00
Received By cpuell Date 2021-03-15 Time 14:07 Sent To  
Notes
2021-03-15 14:07:42BLDG 1 - 3626 VILLAGE BLVD

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status P Date 2021-03-22 Cont ID  
Sent By scwelter Date 2021-03-22 Time 13:32 Rev Time 0.00
Received By scwelter Date 2021-03-22 Time 13:32 Sent To  
Notes
2021-03-22 13:33:15COMPLETED PUBLIC ART REQ. 3.18.2021 SW

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-03-23 Cont ID  
Sent By rmcphers Date 2021-03-23 Time 08:04 Rev Time 0.00
Received By rmcphers Date 2021-03-23 Time 08:04 Sent To  
Notes
2021-03-23 08:06:41SEE MASTER PLAN 20100734
  
 PROVISO ?
  
 SUBMIT A BUILDING UNDER CONSTRUCTION ELEVATION
 CERTIFICATE TO PLAN REVIEW, REQUIRED JUST AFTER
 FINISHED FLOOR IS POURED
  
 SUBMIT A FINISHED CONSTRUCTION ELEVATION CERTIFICATE TO
 PLAN REVIEW, REQUIRED AFTER FINISHED GRADE AND ALL
 MECHANICAL EQUIPMENT IS SET, BEFORE FINAL INSPECTION

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-04-01 Cont ID  
Sent By jleahy Date 2021-04-01 Time 12:58 Rev Time 0.00
Received By jleahy Date 2021-03-30 Time 07:41 Sent To  
Notes
***NONE***

Review Stop E-LOWVOLT ELECTRICAL LOW VOLTAGE
Rev No 1 Status P Date 2022-07-29 Cont ID  
Sent By jleahy Date 2022-07-29 Time 16:02 Rev Time 0.00
Received By jleahy Date 2022-07-29 Time 16:02 Sent To  
Notes
2022-07-29 16:02:42TV , VOICE , AND DATA AS PER PLANS JLEAHY

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2021-03-30 Cont ID  
Sent By rrossano Date 2021-03-30 Time   Rev Time  
Received By rrossano Date 2021-03-30 Time   Sent To  
Notes
2021-03-30 08:12:28REVIEWED UNDER FORMAL ENG SUBMITTAL E20080019.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-04-22 Cont ID  
Sent By pleduc Date 2021-03-19 Time   Rev Time 0.00
Received By pleduc Date 2021-03-18 Time 16:43 Sent To  
Notes
2021-03-19 11:41:03THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THE APPLICATION STATES A 4 STORY BUILDING AND THERE
 WERE ONLY 3 SHEETS IN THE SUBMITTAL THAT WE JUST SITE
 SURVEYS.
  
 THERE WERE NO OTHER SHEETS ATTACHED.
  
 FULL SET OF BUILDING PLANS NEED TO SUBMITTED, UNLESS
 OTHERWISE DIRECTED BY THE BUILIDNG OFFICIAL.
  
  
  
 2) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-22 Cont ID  
Sent By lmarchan Date 2021-04-22 Time 11:36 Rev Time 0.00
Received By lmarchan Date 2021-03-16 Time 09:01 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status P Date 2021-03-19 Cont ID  
Sent By lmarchan Date 2021-03-19 Time 08:42 Rev Time 0.00
Received By lmarchan Date 2021-03-19 Time 08:42 Sent To  
Notes
2021-03-19 08:44:09RECEIPT - MU-2021-8958 - $1,904,992.80 - PAID

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-04-15 Cont ID  
Sent By medwards Date 2021-04-15 Time 10:52 Rev Time 0.00
Received By medwards Date 2021-04-15 Time 10:51 Sent To  
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status P Date 2023-04-28 Cont ID  
Sent By shill Date 2023-04-28 Time 15:06 Rev Time 0.00
Received By shill Date 2023-04-28 Time 15:06 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-04-07 Cont ID  
Sent By lcrespo Date 2021-04-07 Time 12:10 Rev Time 0.00
Received By lcrespo Date 2021-04-07 Time 12:10 Sent To  
Notes
2021-04-07 12:13:38BLDG 1 - CONSTRUCT 4 STORY BUILDING WITH 48 UNITS TYPE
 I, MASTER PLANS 20100734
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status N Date 2021-03-23 Cont ID  
Sent By rmcphers Date 2021-03-23 Time 08:06 Rev Time 0.00
Received By rmcphers Date 2021-03-23 Time 08:06 Sent To  
Notes
2021-03-23 08:07:28DEFERRED

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-03-23 Cont ID  
Sent By rmcphers Date 2021-03-23 Time 08:07 Rev Time 0.00
Received By rmcphers Date 2021-03-23 Time 08:07 Sent To  
Notes
2021-03-23 08:08:00SEE MASTER PLAN 20100734

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status P Date 2021-03-23 Cont ID  
Sent By rmcphers Date 2021-03-23 Time 08:08 Rev Time 0.00
Received By rmcphers Date 2021-03-23 Time 08:08 Sent To  
Notes
2021-03-23 08:08:24SEE MASTER PLAN 20100734

Review Stop Z ZONING
Rev No 1 Status P Date 2021-04-22 Cont ID  
Sent By jroach Date 2021-04-22 Time 10:39 Rev Time 0.00
Received By jroach Date 2021-04-22 Time 10:33 Sent To  
Notes
2021-04-22 10:39:54THIS PERMIT REVIEW IS LIMITED TO BUILDING #3626 ONLY
  
 THE BROADSTONE LAKESIDE RESIDENTIAL PLANNED DEVELOPMENT
 SHALL BE SUBJECT TO ALL DEVELOPMENT ORDER CONDITIONS,
 AS OUTLINED IN RESOLUTION NO. 106-20, APPROVED ON JULY
 27, 2020, AND AS MAY BE AMENDED.
 _______________________________________________________
 _____________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER