Plan Review Details - Permit 20100659
Plan Review Stops For Permit 20100659
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-04-19 Cont ID  
Sent By rmcphers Date 2021-04-19 Time 13:13 Rev Time 0.00
Received By rmcphers Date 2021-04-19 Time 13:13 Sent To  
Notes
2021-04-19 13:14:23ROOFING SYSTEMS, EXTERIOR DOOR AND WINDOW PRODUCT
 APPROVALS TO BE DEFERRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-03-02 Cont ID  
Sent By rmcphers Date 2021-03-02 Time 15:43 Rev Time 0.00
Received By rmcphers Date 2021-03-02 Time 15:39 Sent To  
Notes
2021-03-02 15:43:12SFR ADDITION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE NEW EXTERIOR WINDOWS, DOORS
 AND ROOFING SYSTEM.
 2) EXTERIOR LOUVERS ARE SUBJECT TO WIND LOADS - PLEASE
 SHOW ATTACHMENTS FOR THE LOUVERS OR PROVIDE A PRODUCT
 APPROVAL.
 3) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED
 APPROVED BY THE BUILDING DESIGNER OF RECORD.
 4) ROOFING SYSTEMS AND WINDOW AND DOOR PRODUCT
 APPROVALS MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS
 TO BE DEFERRED ON THE CONSTRUCTION DOCUMENTS -
 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR
 DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING
 OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE
 IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING.
 THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED
 UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN
 APPROVED BY THE BUILDING OFFICIAL.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-10-28 Cont ID  
Sent By rmcphers Date 2020-10-28 Time 10:08 Rev Time 0.00
Received By rmcphers Date 2020-10-28 Time 07:54 Sent To  
Notes
2020-10-28 10:08:20SFR ADDITION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE SHOW THE ADDITION OF NO. 15 ASPHALT FELT ON
 THE EXTERIOR PLYWOOD PER FBC R703.2 WATER-RESISTIVE
 BARRIER.
 ONE LAYER OF NO. 15 ASPHALT FELT, FREE FROM HOLES AND
 BREAKS, COMPLYING WITH ASTM D226 FOR TYPE 1 FELT OR
 OTHER APPROVED WATER-RESISTIVE BARRIER SHALL BE APPLIED
 OVER STUDS OR SHEATHING OF ALL EXTERIOR WALLS.
 2) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE NEW EXTERIOR WINDOWS, DOORS
 AND ROOFING SYSTEM.
 3) DRAWING (A-3) SHOWS WIND DESIGN USING EXPOSURE "C" -
 DRAWING (A-4) SHOWS WIND DESIGN USING EXPOSURE "B" -
 PLEASE CLARIFY
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-10-29 Cont ID  
Sent By equinone Date 2020-10-29 Time 11:58 Rev Time 0.00
Received By equinone Date 2020-10-29 Time 11:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-04-19 Cont ID  
Sent By rmcphers Date 2021-04-19 Time 13:16 Rev Time 0.00
Received By rmcphers Date 2021-04-19 Time 08:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-04-08 Cont ID  
Sent By lcrespo Date 2021-04-08 Time 09:49 Rev Time 0.00
Received By lcrespo Date 2021-02-10 Time 12:06 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-14 Cont ID  
Sent By cpuell Date 2020-12-14 Time 13:57 Rev Time 0.00
Received By cpuell Date 2020-10-14 Time 16:56 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2021-04-22 Cont ID  
Sent By lmarchan Date 2021-04-22 Time 09:12 Rev Time 0.00
Received By lmarchan Date 2021-04-20 Time 07:38 Sent To  
Notes
2021-04-22 09:12:14RECEIPT MU-2021-18977 - $0.00 - NO FEES DUE
  
2021-04-20 07:38:564/20/21 EMAILED IMPACT OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2020-10-28 Cont ID  
Sent By rmcphers Date 2020-10-28 Time 10:09 Rev Time 0.00
Received By rmcphers Date 2020-10-28 Time 10:09 Sent To  
Notes
2020-10-28 10:10:53PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-02-23 Cont ID  
Sent By medwards Date 2021-02-17 Time 13:34 Rev Time 0.00
Received By medwards Date 2021-02-17 Time 13:34 Sent To  
Notes
2021-02-17 13:36:23 
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-10-27 Cont ID  
Sent By medwards Date 2020-10-27 Time 09:58 Rev Time 0.00
Received By medwards Date 2020-10-27 Time 09:31 Sent To  
Notes
2020-10-27 09:58:551ST REVIEW FBC-2017 MECHANICAL
 PERMIT-20100659
  
 CODES IN EFFECT:
  
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET A-2 INDICATES THE AHU WILL BE RELOCATED AS
 SHOWN ON REMODELED PLAN. THE REMODELED PLAN DOES NOT
 SHOW THE AHU. PLEASE PROVIDE A MECHANICAL DRAWING
 SHOWING THE LOCATION AND DUCT WORK. FBC 107.2
  
 2) PLEASE PROVIDE AN ENERGY CALCULATION. FBC EC
 R101.5.1.1.2
  
 3) PLEASE PROVIDE THE MANUAL J CALCULATION FOR
 MECHANICAL SYSTEM USED FOR THE NEW ADDITION. FBC RES
 M1401.3
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-10-26 Cont ID  
Sent By lcrespo Date 2020-10-26 Time 16:48 Rev Time 0.00
Received By lcrespo Date 2020-10-26 Time 16:48 Sent To  
Notes
2020-10-26 16:48:2810/26/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status N Date 2021-04-19 Cont ID  
Sent By rmcphers Date 2021-04-19 Time 13:14 Rev Time 0.00
Received By rmcphers Date 2021-04-19 Time 13:14 Sent To  
Notes
2021-04-19 13:15:12ROOFING TO BE DEFERRED

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2021-03-02 Cont ID  
Sent By rmcphers Date 2021-03-02 Time 15:43 Rev Time 0.00
Received By rmcphers Date 2021-03-02 Time 15:43 Sent To  
Notes
2021-03-02 15:43:55SEE BUILDING PLAN REVIEW

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2020-10-28 Cont ID  
Sent By rmcphers Date 2020-10-28 Time 10:08 Rev Time 0.00
Received By rmcphers Date 2020-10-28 Time 10:08 Sent To  
Notes
2020-10-28 10:09:34SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-07-07 Cont ID  
Sent By medwards Date 2021-07-07 Time 17:13 Rev Time 0.00
Received By medwards Date 2021-07-07 Time 17:13 Sent To  
Notes
2021-07-07 17:14:16ORIGINAL SIGNED AND SEALED PAPER DRAWING ROUTED TO
 STORAGE.ME

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-02-17 Cont ID  
Sent By medwards Date 2021-02-17 Time 08:49 Rev Time 0.00
Received By medwards Date 2021-02-17 Time 08:47 Sent To  
Notes
2021-02-17 08:50:27ORIGINAL SIGNED AND SEALED PAPER DRAWINGS ARE ROUTED TO
 STORAGE. ME

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-10-16 Cont ID  
Sent By equinone Date 2020-10-16 Time 13:40 Rev Time 0.00
Received By equinone Date 2020-10-16 Time 13:40 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2021-04-07 Cont ID  
Sent By rthermid Date 2021-04-07 Time   Rev Time 0.00
Received By rthermid Date 2021-04-07 Time   Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-12-14 Cont ID  
Sent By rthermid Date 2020-12-14 Time   Rev Time  
Received By rthermid Date 2020-12-14 Time   Sent To I
Notes
2020-12-14 11:50:21ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 12/14/2020
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PLEASE PRIVDE THE SETBACKS OF THE PROPOSED ADDITION
 TO ALL PROPERTY LINES.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOGIN
 INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
  
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 TTY: 800.955.8771
 E: [email protected]
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved