Plan Review Details - Permit 20100462
Plan Review Stops For Permit 20100462
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-12-16 Cont ID  
Sent By rmcdouga Date 2020-12-16 Time 13:19 Rev Time 0.00
Received By rmcdouga Date 2020-12-16 Time 12:55 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-11-04 Cont ID  
Sent By rmcdouga Date 2020-11-04 Time 13:06 Rev Time 0.00
Received By rmcdouga Date 2020-11-04 Time 12:37 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2020-12-28 Cont ID  
Sent By ppetty Date 2020-12-28 Time 09:35 Rev Time 0.00
Received By ppetty Date 2020-12-28 Time 09:25 Sent To  
Notes
2020-12-28 09:25:45PROVISO CHECK 680.8 OVERHEAD CONDUCTORS

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-12-08 Cont ID  
Sent By ppetty Date 2020-12-08 Time 08:40 Rev Time 0.00
Received By ppetty Date 2020-12-08 Time 08:40 Sent To  
Notes
2020-12-08 08:43:02PROVISO CHECK 680.8 OVERHEAD CONDUCTORS

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-11-04 Cont ID  
Sent By ppetty Date 2020-11-04 Time 09:24 Rev Time 0.00
Received By ppetty Date 2020-11-04 Time 09:10 Sent To  
Notes
2020-11-04 09:28:04CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1.2014 NEC 680.8 PROVIDE CLEARANCE
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 SINCERELY,
  
 PHIL PETTY
 CHIEF ELECTRICAL INSPECTOR , ELECTRICAL PLANS EXAMINER
  
 561-805-6742
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-10-26 Cont ID  
Sent By lcrespo Date 2020-10-26 Time 11:03 Rev Time 0.00
Received By lcrespo Date 2020-10-26 Time 11:03 Sent To  
Notes
2020-10-26 11:04:33GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-12-28 Cont ID  
Sent By ppetty Date 2020-12-28 Time 09:37 Rev Time 0.00
Received By ppetty Date 2020-12-18 Time 15:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-12-16 Cont ID  
Sent By rmcdouga Date 2020-12-16 Time 13:21 Rev Time 0.00
Received By rmcdouga Date 2020-12-07 Time 11:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-04 Cont ID  
Sent By rmcdouga Date 2020-11-04 Time 13:18 Rev Time 0.00
Received By rmcdouga Date 2020-10-23 Time 11:19 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-12-08 Cont ID  
Sent By lcrespo Date 2020-12-08 Time 17:08 Rev Time 0.00
Received By lcrespo Date 2020-12-08 Time 16:53 Sent To  
Notes
2020-12-08 17:10:1912/08/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-10-26 Cont ID  
Sent By lcrespo Date 2020-10-26 Time 10:24 Rev Time 0.00
Received By lcrespo Date 2020-10-26 Time 10:24 Sent To  
Notes
2020-10-26 10:58:0910/26/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. HEATED SWIMMING POOLS SHALL BE EQUIPPED WITH A
 VAPOR-RETARDANT COVER ON OR AT THE WATER SURFACE OR A
 LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT LOSS
 PER THE 2017 FBC- ENERGY- SEC. R 403.10.3. THIS MAY BE
 PUT IN ON PLANS BY THE ENGINEER OR IT WILL BE NOTED ON
 PLANS BY THE EXAMINER.
  
 2. PLEASE SIZE RETURN ON THE PIPING FOR 1 1/2 PAGE ONE
 PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3. PLEASE PROVIDE A SPECIFICATION FOR HEATERS AND SHOW
 THAT THE MINIMUM THERMAL EFFICIENCY OF 82 % FOR
 HEATERS, WHEN TESTED IN ACCORDANCE WITH ANSI Z 21.56.
  
 4. THE DYNAMIC HEAD CALCULATIONS FOR THE MAXIMUM SYSTEM
 FLOW DOES NOT SHOW ALL FRICTION LOSS THROUGH THE
 COMPONENTS ON THE HEATER PER THE WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 5. PLEASE IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS
 SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL WITH
 A LINE GRAPH. THIS IS NEEDED TO CONFIRM THE MAXIMUM
 SYSTEM FLOW FROM THE TDH CALCULATIONS PER THE
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1.
  
 6. PLEASE PROVIDE ALL MANUFACTURES SPECIFICATION FOR
 ALL SYSTEM COMPONENTS (HEATER, PUMP, CARTRIDGE FILTER,
 AND SALT SYS.) THAT ARE USED IN THE POOL PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-12-28 Cont ID  
Sent By ppetty Date 2020-12-28 Time 09:37 Rev Time 0.00
Received By ppetty Date 2020-12-28 Time 09:37 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-12-16 Cont ID  
Sent By rmcdouga Date 2020-12-16 Time 13:20 Rev Time 0.00
Received By rmcdouga Date 2020-12-16 Time 12:55 Sent To  
Notes
2020-12-16 13:21:52THE NEW SHEETS THAT WERE SUBMITTED HAVE NOT BEEN
 DIGITALLY SIGNED BY THE ENGINEER. ELECTRONICALLY
 SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S
 DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO
 SUBMIT THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS.
 AFTER THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN
 SUBMIT THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING
 DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL
 HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE
 DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE
 SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-11-04 Cont ID  
Sent By rmcdouga Date 2020-11-04 Time 13:07 Rev Time 0.00
Received By rmcdouga Date 2020-11-04 Time 12:38 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-12-14 Cont ID  
Sent By rthermid Date 2020-12-14 Time   Rev Time 0.00
Received By rthermid Date 2020-12-14 Time   Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-11-04 Cont ID  
Sent By rthermid Date 2020-11-04 Time   Rev Time  
Received By rthermid Date 2020-11-04 Time   Sent To I
Notes
***NONE***