Plan Review Details - Permit 20100338
Plan Review Stops For Permit 20100338
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2020-10-16 Cont ID  
Sent By rrossano Date 2020-10-16 Time   Rev Time 0.00
Received By rrossano Date 2020-10-16 Time   Sent To I
Notes
2020-10-16 12:56:00PASSED WITH PROVISO:
  
 CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 THANKS,
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL
 33401
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2020-10-08 Cont ID  
Sent By rrossano Date 2020-10-08 Time   Rev Time  
Received By rrossano Date 2020-10-08 Time   Sent To  
Notes
2020-10-08 14:09:35PLEASE PROVIDE SURVEY SHOWING AREAS OF WORK, TO INCLUDE
 MEASURED DRIVEWAY WIDTH AND MEASURED SETBACK FROM
 PROPERTY LINE.
  
 SIDEWALK TO BE CONSTRUCTED PER CURRENT VERSIONS OF CITY
 OF WPB STANDARD DETAIL GC-5 OR GC-6. SUBMITTED STANDARD
 DETAIL GC-6 HAS BEEN UPDATED, EMAILED RESIDENT PDFS OF
 CURRENT DRIVEWAY AND SIDEWALK STANDARD DETAILS ON
 10/09/2020.
  
 THANKS,
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL
 33401
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-29 Cont ID  
Sent By jleahy Date 2020-10-29 Time 08:54 Rev Time  
Received By ajones Date 2020-10-16 Time 11:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-10-16 Cont ID  
Sent By lmarchan Date 2020-10-16 Time 11:14 Rev Time 0.00
Received By lmarchan Date 2020-10-08 Time 15:05 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-10-29 Cont ID  
Sent By ajones Date 2020-10-29 Time 08:53 Rev Time 0.00
Received By ajones Date 2020-10-29 Time 08:53 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-10-15 Cont ID  
Sent By rthermid Date 2020-10-15 Time 10:08 Rev Time 0.00
Received By ajones Date 2020-10-15 Time 10:08 Sent To  
Notes
2020-10-15 10:09:4010/15/20- FAILED. NEED A SURVEY SHOWING THE WIDTH AND
 LOCATION OF THE CURB CUT.
  
 ANGELLA VANN
 561-822-1441
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved