Plan Review Details - Permit 20091057
Plan Review Stops For Permit 20091057
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-10-20 Cont ID  
Sent By rmcphers Date 2020-10-20 Time 12:22 Rev Time 0.00
Received By rmcphers Date 2020-10-20 Time 12:22 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-10-09 Cont ID  
Sent By rmcphers Date 2020-10-09 Time 10:54 Rev Time 0.00
Received By rmcphers Date 2020-10-09 Time 10:34 Sent To  
Notes
2020-10-09 10:58:14POOL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THE JOB VALUE SHOWN ON THE BUILDING PERMIT
 APPLICATION APPEARS TO BE LOW - PLEASE PROVIDE A COPY
 OF THE CONTRACT TO VERIFY THE JOB COST.
  
 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF
 THE BUILDING OFFICIAL, THE CLAIMED VALUATION
 OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS,
 MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE
 UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE
 DENIED, UNLESS THE APPLICANT CAN SHOW
 DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED
 CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE
 APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL
 BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING
 ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE
 LATEST PUBLISHED DATA OF NATIONAL
 CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT,
 MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL
 CODE CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE
 SET BY THE BUILDING OFFICIAL.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-10-01 Cont ID  
Sent By ppetty Date 2020-10-01 Time 11:13 Rev Time 0.00
Received By ppetty Date 2020-10-01 Time 11:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-20 Cont ID  
Sent By rmcphers Date 2020-10-20 Time 12:22 Rev Time 0.00
Received By rmcphers Date 2020-10-09 Time 13:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-10-09 Cont ID  
Sent By rmcphers Date 2020-10-09 Time 11:00 Rev Time 0.00
Received By rmcphers Date 2020-09-24 Time 11:51 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-10-15 Cont ID  
Sent By lcrespo Date 2020-10-15 Time 07:43 Rev Time 0.00
Received By lcrespo Date 2020-10-14 Time 18:51 Sent To  
Notes
2020-10-14 18:51:3410/14/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-09-28 Cont ID  
Sent By lcrespo Date 2020-09-28 Time 12:57 Rev Time 0.00
Received By lcrespo Date 2020-09-28 Time 12:57 Sent To  
Notes
2020-09-28 12:57:3309/28/20 1ST PLUMBING/POOL REVIEW**DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE SUBMIT THE POOL PUMP CURVE FROM THE
 MANUFACTURE SPECIFICATION ALONG WITH THE PUMP MODEL.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS.
 4.4.9, 4.4.9.1.
  
 2. THE SUBMITTED TDH CALCULATIONS DO NOT APPEAR TO SHOW
 THE FRICTION LOSS THROUGH ALL THE SYSTEM COMPONENTS.
 THE CALCULATOR SHOWS THE PIPE, FITTINGS, VALVES, HEATER
 (MISSING), FILTER, ETC. BUT THERE IS NO FRICTION LOSS
 ASSOCIATED WITH THESE ITEMS. PLEASE CLARIFY PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 3. THE CARTRIDGE FILTER SPECIFICATION DOES NOT MATCH
 THE ONES IN CALCULATION, THE ONE IN TDH IS A CL1200
 PLEASE PROVIDE CORRECT ONES PER THE WPB AMEND. TO FBC
 SEC. 107.2.1.
  
 4. PLEASE PROVIDE THE HEAT PUMP POOL HEATERS
 SPECIFICATION TO VERIFY COMPLIANCE AS IT SHALL HAVE A
 MINIMUM COP OF 4.0 WHEN TESTED IN ACCORDANCE WITH AHRI
 1160, TABLE 2, STANDARD RATING CONDITIONS ? LOW AIR
 TEMPERATURE. A TEST REPORT FROM AN INDEPENDENT
 LABORATORY IS REQUIRED TO VERIFY PROCEDURE COMPLIANCE
 PER THE 2017 FBC-ENERGY ? SEC. R 403.10.5.
  
 5. PLEASE SHOW THE POOL HEATER IN THE PIPING SCHEMATIC
 SUBMITTED PER THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-10-20 Cont ID  
Sent By rmcphers Date 2020-10-20 Time 12:22 Rev Time 0.00
Received By rmcphers Date 2020-10-20 Time 12:22 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-10-09 Cont ID  
Sent By rmcphers Date 2020-10-09 Time 11:00 Rev Time 0.00
Received By rmcphers Date 2020-10-09 Time 11:00 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-10-01 Cont ID  
Sent By jroach Date 2020-10-01 Time 16:18 Rev Time 0.00
Received By jroach Date 2020-10-01 Time 16:18 Sent To  
Notes
2020-10-01 16:18:44PROVISOS:
  
 1. ALL POOL EQUIPMENT SHALL BE A MINIMUM OF ONE (1)
 FOOT FROM THE SIDE PROPERTY LINE.
  
 2. POOL SHALL BE ENCLOSED BY A PERMANENT FENCE OR
 SIMILAR STRUCTURE WHICH IS INSTALLED TO OBSTRUCT ACCESS
 BY PERSONS OTHER THAN THE OWNERS OR OCCUPANTS OF THE
 RESIDENCE WITHIN WHICH A SWIMMING POOL IS LOCATED
 (?BABY FENCE? DOES NOT MEET THIS REQUIREMENT). BARRIERS
 OR FENCES SHALL BE AT LEAST 4 FEET IN HEIGHT ABOVE
 GRADE.
  
 3. ACCESS TO AN ACCESSORY SWIMMING POOL MUST BE THROUGH
 A BUILDING OR THROUGH A SELF-CLOSING AND SELF-LATCHING
 GATE OR THROUGH A SCREEN ENCLOSURE DOOR WITH LATCHES
 PLACED AT LEAST 54 INCHES ABOVE BOTTOM OF GATE.
  
 4. PATIO OR PAVED AREA ADJACENT TO OR SURROUNDING THE
 POOL SHALL BE DESIGNED TO DRAIN AWAY FROM THE POOL, BUT
 NOT ONTO ADJACENT PROPERTIES.
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved