| Plan Review Stops For Permit 20091046 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
P |
Date |
2020-10-28 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-10-28 |
Time |
13:37 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-10-28 |
Time |
13:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2020-10-18 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-10-18 |
Time |
09:54 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-10-18 |
Time |
09:54 |
Sent To |
|
|
| Notes |
| 2020-10-18 09:55:17 | GUEST HOUSE NEEDS IT'S OWN ADDRESS (AND A SEPARATE ROOF | | | PERMIT) PLEASE EMAIL [email protected] TO ESTABLISH AN | | | ADDRESS FOR THE GUEST HOUSE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-11-25 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-25 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-25 |
Time |
15:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-11-04 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-04 |
Time |
07:41 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-04 |
Time |
07:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-10-06 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-10-06 |
Time |
09:25 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-10-06 |
Time |
06:45 |
Sent To |
|
|
| Notes |
| 2020-10-06 08:13:09 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | FBC B 107, PLEASE PROVIDE A LAYOUT SHEET INDICATING THE | | | SIZE OF THE ROOF AREAS, IF ROOF HAS PARAPETS PROVIDE | | | DRAIN AND/OR SCUPPER LOCATIONS/DETAILS, | | | FBC B 107.2.1, PLEASE RESUBMIT THE PRODUCT APPROVALS | | | WITH OPTIONS/SYSTEMS TO BE USED MARKED AND OR CIRCLED | | | WITHIN THE PRODUCT APPROVAL. | | | FBC B 107.2.1, PLEASE PROVIDE ENGINEER'S WIND LOAD | | | PRESSURES LETTER WITH ANCHORING SPACING DETAILS. |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-11-20 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2020-11-20 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2020-11-20 |
Time |
16:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-10-13 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2020-10-13 |
Time |
16:55 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2020-10-13 |
Time |
16:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-11-25 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-25 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-23 |
Time |
10:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-11-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-20 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-10-28 |
Time |
08:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-10-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-10-16 |
Time |
16:39 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-10-02 |
Time |
14:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-11-25 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-25 |
Time |
15:54 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-25 |
Time |
15:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-11-04 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-04 |
Time |
07:39 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-04 |
Time |
07:01 |
Sent To |
|
|
| Notes |
| 2020-11-04 07:40:22 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561?805?6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | 2ND SIGNATURE REVIEW DENIED: | | | FBC B 107, ENGINEER?S SIGNED/SEALED WINDLOAD PRESSURES | | | LETTER WITH ANCHOR SPACING IS REQUIRED. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-10-06 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-10-06 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-10-06 |
Time |
09:26 |
Sent To |
|
|
| Notes |
| 2020-10-06 09:28:54 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | SIGNATURE REVIEW DENIED: | | | | | | FBC B 107, ENGINEER'S SIGNED/SEALED WINDLOAD PRESSURES | | | LETTER WITH ANCHOR SPACING IS REQUIRED. | | | |
|
|