| 2020-09-22 11:10:27 | PLAN REVIEW / BUILDING / TEMP. TENT |
| | |
| | CHRISTOPHER S. THROOP, C.B.O. |
| | PLANS EXAMINER BUILDING - PX3169 |
| | PLANS EXAMINER 1&2 FAMILY - SFP306 |
| | CONSTRUCTION SERVICES DIVISION |
| | TEL: 561-805-6726 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | NEC 2014 |
| | |
| | 1ST REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | 2017 FBC 6TH CHPT. 31 |
| | SPECIAL CONSTRUCTION |
| | |
| | SECTION 3103 |
| | TEMPORARY STRUCTURES |
| | |
| | 1. SITE PLAN |
| | A. SHOW TO SCALE THE SIZE AND LOCATION OF NEW |
| | CONSTRUCTION AND EXISTING |
| | STRUCTURES ON THE SITE?PROVIDED |
| | B. SHOW DISTANCE TO LOT LINES AND OTHER STRUCTURES PER |
| | FBC CHPT. 6, SEC. 602 |
| | C. PROVIDE SQUARE FOOTAGE PROVIDED |
| | D. PROVIDE ESTIMATED OCCUPANCY OF EACH TENT |
| | E. PROVIDE ACCESSIBLE ROUTE FROM PARKING TO TENT |
| | ENTRANCE |
| | F. IDENTIFY MEANS OF EGRESS PER CHPT. 10 |
| | G. PROVIDE ACCESSIBLE ROUTE FROM TENT TO ACCESSIBLE |
| | RESTROOMS |
| | H. ACCESSIBLE RESTROOMS SHALL BE LOCATED WITHIN 500 |
| | FEET OF TENT |
| | 2. FOUNDATION/TIE DOWN |
| | A. PROVIDE DETAIL OF TIE DOWN FOR UPLIFT |
| | B. PROVIDE DETAIL OF ANCHORS FOR TENT LEG LATERAL |
| | MOVEMENT |
| | 3. CONFORMANCE PER SECTION 3103.1.1 |
| | TEMPORARY STRUCTURES AND USES SHALL CONFORM TO THE |
| | STRUCTURAL STRENGTH, FIRE SAFETY, MEANS OF EGRESS, |
| | ACCESSIBILITY, LIGHT, VENTILATION AND SANITARY |
| | REQUIREMENTS OF THIS CODE AS NECESSARY TO ENSURE PUBLIC |
| | HEALTH, SAFETY AND GENERAL WELFARE. |
| | |
| | |
| | FOR TEMPORARY MEMBRANE STRUCTURES (TENTS) WITH A SPAN |
| | OF 40 FEET OR GREATER IN ANY DIRECTION: |
| | |
| | A. PROVIDE DETAILS OF STRUCTURAL CONNECTIONS. INCLUDE |
| | BASEPLATE/TIEDOWN DETAILS. |
| | B. PROVIDE STRUCTURAL EVALUATION OF STRUCTURE. |
| | |
| | THESE DOCUMENTS SHALL BE REVIEWED, SIGNED AND SEALED BY |
| | A DESIGN PROFESSIONAL. |
| | |
| | NO EXCEPTIONS BY ORDER OF THE BUILDING OFFICIAL |
| | |
| | |