Plan Review Details - Permit 20090777
Plan Review Stops For Permit 20090777
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2020-09-24 Cont ID  
Sent By rmcphers Date 2020-09-24 Time 14:49 Rev Time 0.00
Received By rmcphers Date 2020-09-24 Time 14:49 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-09-24 Cont ID  
Sent By rmcphers Date 2020-09-24 Time 14:49 Rev Time 0.00
Received By rmcphers Date 2020-09-24 Time 14:46 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-09-21 Cont ID  
Sent By jleahy Date 2020-09-21 Time 09:15 Rev Time 0.00
Received By jleahy Date 2020-09-21 Time 09:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-09-18 Cont ID  
Sent By jleahy Date 2020-09-18 Time 16:55 Rev Time 0.00
Received By jleahy Date 2020-09-18 Time 16:53 Sent To  
Notes
2020-09-18 16:57:47ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 ELECTRICAL PERMIT REQUIRED FOR DEMO.
  
 ELECTRICAL PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL
 PERMIT APPLICATION TO [email protected] AND CC
 [email protected] SO I RECEIVE IT ALSO. WHEN THIS EMAIL
 IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE PLAN
 REVIEW. THE ORIGINAL PERMIT APPLICATION MUST BE
 SUBMITTED WHEN THE PERMIT IS PICKED UP.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-09-21 Cont ID  
Sent By pleduc Date 2020-09-21 Time   Rev Time 0.00
Received By pleduc Date 2020-09-21 Time 14:14 Sent To  
Notes
2020-09-21 14:16:09THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) PROTECT FIRE ALARM DEVICES AND EQUIPMENT.
  
 2) DO NOT PAINT OVER FIRE ALARM DEVICES/EQUIPMENT.
  
 3) THE FA SYSTEM SHALL BE MAINTAINED THROUGHOUT DEMO
 AND CONSTRUCTION.
  
 4) ANY WORK FIRE ALARM SYSTEM, INCLUDING
 DEMO/RELOCATION SHALL BE DONE UNDER SEPARATE PERMIT AND
 SHOP DRAWINGS.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2020-09-25 Time   Rev Time 0.00
Received By lmarchan Date 2020-09-17 Time 15:55 Sent To  
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date 2020-09-24 Cont ID  
Sent By rmcphers Date 2020-09-24 Time 14:52 Rev Time 0.00
Received By rmcphers Date 2020-09-24 Time 14:52 Sent To  
Notes
2020-09-24 14:53:25NOT A SUBSTANTIAL IMPROVEMENT - 1 UNIT REMODEL IN A HI
 RISE

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-09-25 Cont ID  
Sent By ccole Date 2020-09-25 Time 13:40 Rev Time 0.00
Received By ccole Date 2020-09-25 Time 13:13 Sent To  
Notes
2020-09-25 13:43:25A PLUMBING SUB-PERMIT IS REQUIRED AND SHALL BE ONSITE
 PRIOR TO PERFORMING PLUMBING DEMOLITION WORK.
 CCOLE- 9/25/2020
2020-09-25 13:41:07 
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-09-24 Cont ID  
Sent By rmcphers Date 2020-09-24 Time 14:55 Rev Time 0.00
Received By rmcphers Date 2020-09-24 Time 14:55 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved