|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20090724
| Plan Review Stops For Permit 20090724 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-11-17 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-17 |
Time |
10:31 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-17 |
Time |
10:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-10-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-10-16 |
Time |
15:49 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-10-16 |
Time |
15:49 |
Sent To |
|
|
| Notes |
| 2020-10-16 15:56:15 | BASKET BALL COURT | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | 2ND REVIEW | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) THE BASKETBALL POSTS ARE SUBJECT TO WIND LOADS PER | | | FBC R301.1 PLEASE PROVIDE THE STRUCTURAL CALCULATIONS | | | REQUIRED FOR THESE LOADS OR HAVE THE DETAILS PREPARED | | | AND SIGNED AND SEALED BY AN ARCHITECT OR ENGINEER FBC | | | R301.1.3 | | | 2) PLEASE SHOW THE WIND DESIGN DATA USED FOR DESIGN PER | | | FBC R301.2.1 (CODE VERSION, WIND SPEED, EXPOSURE, RISK | | | CATEGORY) | | | | | | FYI = SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO | | | BE DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR - | | | IF YOUR ARCHITECT OR ENGINEER DOES NOT HAVE AN | | | ELECTRONIC OR DIGITAL SIGNATURE - PLEASE DROP OFF (CITY | | | HALL DROP BOX) THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS ALONG WITH A "PLAN REVIEW REQUEST | | | FORM" EXPLAINING THE REASON FOR SUBMITTING THE DOCUMENT | | | OR DRAWINGS. PLAN REVIEW REQUEST FORM CAN BE OBTAINED | | | BY E MAILING [email protected] AND ASKING FOR THE FORM. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-09-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-09-29 |
Time |
14:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-09-29 |
Time |
14:33 |
Sent To |
|
|
| Notes |
| 2020-09-29 14:40:09 | BASKETBALL COURT | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE SHOW THE COURT CONSTRUCTION MATERIALS | | | (CONCRETE, THICKNESS AND REINFORCEMENT?) - (WOOD?) | | | 2) PLEASE PROVIDE POLE FOUNDATION DETAILS (SHOW THE | | | WIND DESIGN DATA) TO COMPLY WITH THE REQUIRED WIND | | | LOADS FBC R301.1 (OR ARE THEY PORTABLE?) |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-11-17 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-17 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-10 |
Time |
14:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-10-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-10-16 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-10-08 |
Time |
14:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-10-08 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-10-08 |
Time |
06:59 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-09-18 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-11-17 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-17 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-17 |
Time |
10:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-09-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-09-29 |
Time |
14:41 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-09-29 |
Time |
14:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2020-10-02 |
|
|
Cont ID |
|
| Sent By |
kalexand |
Date |
2020-10-02 |
Time |
12:08 |
Rev Time |
0.00 |
| Received By |
kalexand |
Date |
2020-10-02 |
Time |
12:08 |
Sent To |
I |
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |