Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-10-21 Cont ID  
Sent By jleahy Date 2020-10-21 Time 16:31 Rev Time 0.00
Received By jleahy Date 2020-10-21 Time 16:31 Sent To  
Notes
2020-10-21 16:32:18BUILDING REVIEW DONE UNDER THE ELECTRICAL REVIEW JLEAHY

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-10-05 Cont ID  
Sent By rmcdouga Date 2020-10-05 Time 15:57 Rev Time 0.00
Received By rmcdouga Date 2020-10-05 Time 15:57 Sent To  
Notes
2020-10-05 16:09:07PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE GENERATOR IS REQUIRED TO BE 5 FEET FROM
 COMBUSTIBLE WALLS AND THE EXHAUST IS REQUIRED TO BE 10
 FEET FROM OPENINGS INTO A BUILDING. FBC-R303.5.1

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-10-21 Cont ID  
Sent By jleahy Date 2020-10-21 Time 16:09 Rev Time 0.00
Received By jleahy Date 2020-10-21 Time 16:01 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-09-24 Cont ID  
Sent By jleahy Date 2020-09-24 Time 14:51 Rev Time 0.00
Received By jleahy Date 2020-09-24 Time 14:51 Sent To  
Notes
2020-09-24 14:52:49SEE PERMIT 20091105 FOR SIGNED RISER DIAGRAM FOR
 GENERATOR AND TRANSFER SWITCH JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-21 Cont ID  
Sent By jleahy Date 2020-10-21 Time 16:32 Rev Time 0.00
Received By jleahy Date 2020-10-08 Time 15:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-10-05 Cont ID  
Sent By rmcdouga Date 2020-10-05 Time 16:09 Rev Time 0.00
Received By rmcdouga Date 2020-09-17 Time 13:16 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-10-21 Cont ID  
Sent By jleahy Date 2020-10-21 Time 16:30 Rev Time 0.00
Received By jleahy Date 2020-10-21 Time 16:30 Sent To  
Notes
2020-10-21 16:11:32ELECTRICAL PLAN IS SIGNED JLEAHY

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-10-05 Cont ID  
Sent By jleahy Date 2020-09-24 Time 14:52 Rev Time 0.00
Received By rmcdouga Date 2020-10-05 Time 15:57 Sent To  
Notes
2020-10-05 15:58:15THE ENGINEER THAT IS ON THE SLAB ANCHORING PLANS,
 RONALD H. WILSON P.E. LICENSE NO. 9710, HAS HAD HIS FL
 ENGINEERING LICENSE REVOKED SINCE 2/28/2017. SUBMIT
 PLANS FROM A CURRENTLY LICENSED FL ENGINEER. FS 471
 ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE
 THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE
 THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER
 VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE
 BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER
 DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE
 ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS
 REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER
 FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 &
 61G15
  
  
2020-09-24 14:54:02I GOT A SEPARATE PERMIT 20091105 FOR THE ELECTRICAL
 PART OF THE SERVICE WHICH SHOWS ALL THE ELECTRIC FOR
 THE GENERATOR, AND ITS SIGNED JLEAHY 9/24/2020

Review Stop Z ZONING
Rev No 2 Status P Date 2020-10-20 Cont ID  
Sent By rthermid Date 2020-10-20 Time   Rev Time 0.00
Received By rthermid Date 2020-10-20 Time   Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-09-29 Cont ID  
Sent By rthermid Date 2020-09-29 Time   Rev Time  
Received By rthermid Date 2020-09-29 Time   Sent To I
Notes
2020-09-29 09:00:40ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 9/29/2020
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PLEASE PROVIDE THE SETBACKS OF THE GENERATOR FROM
 ALL PROPERTY LINES. PURSUANT THE CITY OF WEST PALM
 BEACH ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR),
 SECTION 94-305(B)(4): MECHANICAL EQUIPMENT MAY NOT
 PROJECT MORE THAN 4 FEET INTO A REQUIRED SETBACK.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOGIN
 INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
  
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 TTY: 800.955.8771
 E: [email protected]
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved