| 2020-09-28 14:17:13 | 09/14/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. PLEASE PROVIDE AN ISOMERIC RISER DIAGRAM DRAWING OF |
| | THE GAS SYSTEM, CLEARLY SHOWS THE LENGTH OF ALL CUT |
| | SECTIONS OF PIPE, SHOW THE TYPE OF PIPE MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, AND THE CORRESPONDING EHD |
| | NUMBER OF THE CORRUGATED STAINLESS-STEEL TUBING (IF |
| | APPLICABLE) FOR EACH PIPE SIZE, SHOW THE DISTANCE FROM |
| | THE POINT OF DELIVERY TO THE MOST REMOTE OUTLET IN THE |
| | BUILDING AND/OR SYSTEM, LIST THE BTU LOAD OF EACH |
| | APPLIANCE, THE TOTAL BTU LOAD OF THE EXISTING SYSTEM, |
| | DELIVERY PRESSURE (PSI) OF THE SYSTEM AND TYPE OF GAS |
| | (LP OR NATURAL) PER THE WPB AMENDMENTS TO THE FBC SEC. |
| | 107.3.5.3 (12) RESIDENTIAL GAS. |
| | |
| | 2. ON PLANS SUBMITTED IT STATE THAT A FUTURE APPLIANCE |
| | WILL BE AT THE RUN TO BE USED LATER. THIS IS NOT |
| | PERMITTED UNLESS THE APPLIANCE THAT WILL BE CONNECTED |
| | IS SUBMIT WITH THIS APPLICATION AND IS APPROVED A VALVE |
| | AND NIPPLE WILL BE REQUIRED AND WILL NEED TO BE SHOWN |
| | ON THE ISOMETRIC PER THE WPB AMENDMENTS TO THE FBC SEC. |
| | 107.2.1. INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 3. PLEASE LABEL THE SHUTOFF VALVE ON GAS ISOMERIC PER |
| | THE 2017 FBC RES. SEC. G2401.1.3. |
| | |
| | 4. A SUB GAS PERMIT IS REQUIRED FOR THE SCOPE OF WORK |
| | PER THE WPB AMENDMENTS TO THE FBC SEC. 105.1. |
| | |
| | 5. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | (CLOTHES DRYER AND RANGE), OR 2017 FBC RES. SEC. |
| | G2407.1 AND G2439.4. |
| | |
| | 6. PLEASE SUBMIT THE SIZING TABLE USED IN THE DESIGN |
| | FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS OF |
| | PLANS LISTING THE SIZING TABLES FROM GAS CODES OR |
| | ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS |
| | SYSTEM PER THE 2017 FBC RES. SEC. G2413.3. |
| | |
| | 7. A SUB PLUMBING PERMIT IS REQUIRED FOR THE SCOPE OF |
| | WORK AS A WASHING MACHINE IS SHOWN. THE CITY HAS DONE |
| | PRIOR INSPECTIONS ON THIS ADDRESS AND A DRAIN FOR A |
| | WASHING MACHINE WAS REMOVED BECAUSE IT WAS NOT TO CODE, |
| | PLEASE INCLUDE DOCUMENTATION FOR PERMITTING OF A |
| | WASHING MACHINE DRAIN PER THE WPB AMENDMENTS TO THE FBC |
| | SEC. 105.1. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |