Plan Review Details - Permit 20090094
Plan Review Stops For Permit 20090094
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2020-10-04 Cont ID  
Sent By jwitmer Date 2020-10-04 Time 15:13 Rev Time 0.00
Received By jwitmer Date 2020-10-04 Time 14:57 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2020-09-13 Cont ID  
Sent By jwitmer Date 2020-09-13 Time 17:02 Rev Time 0.00
Received By jwitmer Date 2020-09-13 Time 16:42 Sent To  
Notes
2020-09-13 17:02:211) TO THE BUILDING CONTRACTOR:
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND ?ASBESTOS? IN THE SUBJECT LINE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-10-04 Cont ID  
Sent By jwitmer Date 2020-10-04 Time 15:14 Rev Time 0.00
Received By jwitmer Date 2020-10-04 Time 14:57 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-09-13 Cont ID  
Sent By jwitmer Date 2020-09-13 Time 17:02 Rev Time 0.00
Received By jwitmer Date 2020-09-13 Time 16:42 Sent To  
Notes
2020-09-13 17:01:52WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION
 SERVICES/ BUILDING DIVISION
 2017 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 20090094
 ADD: 801 S. OLIVE AVE. # 218
 CONT: VALENTIN BUILDERS
 TEL: 561-254-1340
 E-MAIL:[email protected]
  
 2017 FLORIDA BUILDING CODE W 2017 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2017 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: SUNDAY/ SEPTEMBER 13TH/ 2020
 ACTION: DENIED
  
 1) TO THE BUILDING CONTRACTOR:
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND ?ASBESTOS? IN THE SUBJECT LINE.
  
 2) CERTIFICATION BY CONTRACTOR.
 107.3.4.3 CERTIFICATION BY CONTRACTOR. PLEASE NOTE THE
 EXCEPTION TO ENGINEERED PLANS UNDER 471.003(H)
 ELECTRICAL/ PLUMBING/ MECHANICAL, 481.229(1)(C)
 (BUILDING) REQUIRES THE CONTRACTOR FOR THAT TRADE THAT
 WILL BE LICENSED IN THAT TRADE, WILL ALSO BE THE
 CONTRACTOR THAT DESIGNS THE SYSTEM UNDER THAT TRADE.
 THE CONTRACTOR (QUALIFIER) THAT CREATED / DRAWN THE SET
 OF PLANS WILL NEED TO IDENTIFY THEMSELVES AS THE AUTHOR
 OF THE PLANS. PLEASE PRINT YOUR NAME, SIGN YOUR NAME
 AND LICENSE NUMBER FOR THE TRADE YOU ARE LICENSED IN
 AND PLANS DRAWN.
 FOR EACH TRADE THE CONTRACTOR RESPONSIBLE FOR THE
 DESIGN UNDER THE TRADE LICENSED IN MUST PRINT THEIR
 NAME, SIGN THEIR NAME AND LICENSE NUMBER, NOTE THESE
 PLANS APPEAR TO BE DRAWN BY ONE INDUVIAL, THEY WOULD
 HAVE TO BE LICENSED AS A BUILDING, ELECTRICAL AND
 PLUMBING CONTRACTOR TO SUBMIT ALL THESE TRADES UNDER
 ONE SHEET.
  
 3) THE SUBMITTED FLOOR PLAN AND DETAIL OF SHOWER PAN
 INDICATES A NEW TILE FLOOR WITHIN THE MASTER BATHROOM.
 THERE IS NO MENTION AS TO THE TYPE OF SOUND
 UNDERLAYMENT THAT IS PROPOSED.
 FLOOR INSULATION (FBC-B 2017)
 FOR TILE, STONE, MARBLE, VINYL AND WOOD FLOORING ALL
 NEED TO HAVE HAD THE SOUND UNDERLAYMENT TESTED FLOOR
 ASSEMBLIES TO THE FOLLOWING STANDARDS AND MEET THE
 QUALIFICATIONS LISTED UNDER EACH OF THE STANDARDS FOR A
 6 INCH CONCRETE FLOOR ASSEMBLY/ NO DROPPED CEILING:
 PLEASE PROVIDE ALL THREE TEST REPORTS SHOWING
 COMPLIANCE WITH:
  
 TYPE I AND II BUILDINGS
 3A) FBC-B 2017 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E-492.
  
 3B) FBC-B 2017 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 3C) FLAME SPREAD- FBC-B 2017 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 4) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 A THOROUGH REVIEW OF THE PLANS COULD NOT HAPPEN SINCE
 THERE WAS A GREAT DEFICIENCY IN PLANS AND REQUIRED
 DOCUMENTATION. WITH THE NEXT PLAN REVIEW CYCLE THERE
 MAYBE ADDITIONAL REVIEW COMMENTS BECAUSE OF NEW PLANS
 AND INFORMATION LACKING UNDER THE PRIOR REVIEW.
  
 PLEASE NOTE WE ARE WORKING FROM HOME BECAUSE OF COVID
 19
 IF YOU WOULD LIKE TO CONTACT ME, MY CELL NUMBER IS
 561-718-9724.
  
 JAMES A. WITMER BN, PX, SFP, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 BUILDING DIVISION / DEVELOPMENT SERVICES DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2020-09-15 Cont ID  
Sent By fgiaquin Date 2020-09-15 Time 22:26 Rev Time 0.00
Received By fgiaquin Date 2020-09-15 Time 21:59 Sent To  
Notes
2020-09-15 22:26:43NO ELECTRICAL WORK REVIEWED OR APPROVED

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-10-02 Cont ID  
Sent By pleduc Date 2020-10-02 Time   Rev Time 0.00
Received By pleduc Date 2020-10-02 Time 15:14 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-09-03 Cont ID  
Sent By pleduc Date 2020-09-03 Time   Rev Time 0.00
Received By pleduc Date 2020-09-03 Time 11:44 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-05 Cont ID  
Sent By lcrespo Date 2020-10-05 Time 13:49 Rev Time 0.00
Received By lcrespo Date 2020-09-30 Time 07:44 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-15 Cont ID  
Sent By fgiaquin Date 2020-09-15 Time 22:26 Rev Time 0.00
Received By fgiaquin Date 2020-09-02 Time 09:41 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-10-05 Cont ID  
Sent By lcrespo Date 2020-10-05 Time 13:49 Rev Time 0.00
Received By lcrespo Date 2020-10-05 Time 13:49 Sent To  
Notes
2020-10-05 13:49:2910/05/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-09-10 Cont ID  
Sent By lcrespo Date 2020-09-10 Time 14:37 Rev Time 0.00
Received By lcrespo Date 2020-09-10 Time 14:09 Sent To  
Notes
2020-09-10 14:38:2309/10/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ON GENERAL NOTES PLEASE DELETE ANYTHING THAT DOES
 NOT PERTAIN TO THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 2. ON GENERAL NOTES IT REFERS TO THE 2014 PLUMBING CODE
 A 5TH EDITION, PLEASE CHANGE TO CURRENT CODE OF THE
 2017 FBC PLUMBING 6TH EDITION PER THE WPB AMENDMENTS TO
 THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 3. ON GENERAL NOTES PLEASE NOTE THAT SHOWER VALVE SHALL
 COMPLY WITH THE 2017 FBC SEC. P 424.3. INDIVIDUAL
 SHOWER VALVES SHALL BE BALANCED-PRESSURE, THERMOSTATIC
 OR COMBINATION BALANCED-PRESSURE/THERMOSTATIC VALVES
 THAT CONFORM TO THE REQUIREMENTS OF ASSE 1016/ASME
 A112.1016/CSA B125.16 OR ASME A112.18.1/CSA B125.1.
  
 4. ALL INFORMATION, DRAWINGS, SPECIFICATIONS, AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-10-05 Cont ID  
Sent By lcrespo Date 2020-10-05 Time 13:48 Rev Time 0.00
Received By lcrespo Date 2020-10-05 Time 13:48 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-09-10 Cont ID  
Sent By lcrespo Date 2020-09-10 Time 14:39 Rev Time 0.00
Received By lcrespo Date 2020-09-10 Time 14:39 Sent To  
Notes
2020-09-10 14:39:35ALL INFORMATION, DRAWINGS, SPECIFICATIONS, AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved