Plan Review Details - Permit 20081178
Plan Review Stops For Permit 20081178
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-02-18 Cont ID  
Sent By rgathrig Date 2021-02-18 Time 10:22 Rev Time 0.00
Received By rgathrig Date 2021-02-18 Time 10:18 Sent To  
Notes
2021-02-18 10:22:26UPLOADED DOCUMENT REVIEWED BY R BROWN 8/27/20
  
 KEN AND RICHARD,
  
 THE 8/27/20 EARTH TECH LETTER LOOKS GOOD TO ME. THE
 LAST PARAGRAPH STATES THAT FINAL VERIFICATION OF THE
 8,000 PSF ALLOWABLE BEARING PRESSURE WILL BE PERFORMED
 BY GFA INTERNATIONAL. I AM HOPING THAT GFA ARE AWARE OF
 THAT AND ARE PREPARED TO PROVIDE VERIFICATION. I THINK
 THAT WE CAN ACCEPT THIS LETTER AND LET GFA
 INTERNATIONAL KNOW THAT WE WILL EXPECT THEM TO PROVIDE
 THE VERIFICATION STATED IN THE LAST PARAGRAPH. WHAT ARE
 YOUR THOUGHTS?
  
 THANKS
  
 ROBERT BROWN, CBO
 BUILDING OFFICIAL / BUILDING DIVISION MANAGER
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-09-10 Cont ID  
Sent By rgathrig Date 2020-09-10 Time 13:15 Rev Time 0.00
Received By rmcdouga Date 2020-09-10 Time 13:15 Sent To  
Notes
2020-09-10 13:15:14PLAN
 REVIEW COMMENTS
 (SOIL PREPARATION REPORT SUBMITTAL)
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THERE IS NOTHING TO INDICATE THAT THE SOIL
 STABILIZATION REPORT DOCUMENTS WERE REVIEWED AND
 ACCEPTED BY DESIGNER OF RECORD FOR THIS PROJECT. CITY
 AMENDMENTS FBC 107.3.4.1 THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE
 FOR REVIEWING AND COORDINATING SUBMITTAL DOCUMENTS
 PREPARED BY OTHERS, INCLUDING PHASED AND DEFERRED
 SUBMITTAL ITEMS, FOR COMPATIBILITY WITH THE DESIGN OF
 THE BUILDING.
  
 2) AN ORIGINAL SIGNED AND SEALED SET OF THE SOIL
 STABILIZATION MONITORING AND AND CONFIRMATION DOCUMENTS
 FROM GFA IS REQUIRED TO BE SUBMITTED FOR THE PUBLIC
 RECORDS FOR THIS PROJECT. CITY AMENDMENTS FBC 107.1

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-10 Cont ID  
Sent By rmcdouga Date 2020-09-10 Time 13:15 Rev Time 0.00
Received By rmcdouga Date 2020-08-26 Time 09:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-09-10 Cont ID  
Sent By rmcdouga Date 2020-09-10 Time 13:15 Rev Time 0.00
Received By rmcdouga Date 2020-09-10 Time 13:15 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved