|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20081060
| Plan Review Stops For Permit 20081060 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-10-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-02 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-02 |
Time |
10:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-09-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-25 |
Time |
16:30 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-09-25 |
Time |
15:57 |
Sent To |
|
|
| Notes |
| 2020-09-25 16:10:23 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) IN A COUPLE OF PLACES ON SHEET S-1, THE ENGINEER | | | SPECIFIES THAT THE DESIGN IS BASED ON ASCE 7 -16. | | | CHAPTER 35 OF THE 2017 FBC REFERENCES ASCE 7-10. THE | | | BUILDING CODE HAS NOT YET ADOPTED ASCE 7-16. PLEASE | | | REVISE. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-09-25 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-09-25 |
Time |
16:11 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-09-25 |
Time |
15:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-09-25 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-09-25 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-09-25 |
Time |
15:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-10-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-02 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-01 |
Time |
16:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-10-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-10-01 |
Time |
16:28 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-09-25 |
Time |
10:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-10-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-02 |
Time |
10:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-02 |
Time |
10:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-09-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-25 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-09-25 |
Time |
15:59 |
Sent To |
|
|
| Notes |
| 2020-09-25 16:01:00 | I WAS NOT ABLE TO VERIFY THAT THE DRAWINGS ARE | | | DIGITALLY SIGNED BY THE ENGINEER. ELECTRONICALLY | | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S | | | DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO | | | SUBMIT THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. | | | AFTER THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN | | | SUBMIT THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | | DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL | | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | | DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE | | | SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2020-10-01 |
|
|
Cont ID |
|
| Sent By |
eleveque |
Date |
2020-10-01 |
Time |
16:08 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2020-10-01 |
Time |
16:08 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |