| Plan Review Stops For Permit 20081034 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-10-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-30 |
Time |
09:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-30 |
Time |
09:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-09-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-22 |
Time |
10:49 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-09-22 |
Time |
10:49 |
Sent To |
|
|
| Notes |
| 2020-09-22 11:07:57 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT A COMPLETE SET OF PLANS FOR THE POOL WHICH | | | SHOWS THAT IT COMPLIES WITH THE REQUIREMENTS OF FBC | | | CHAPTER 45. | | | | | | 2) SUBMIT A SITE PLAN THAT SHOWS THE LOCATION OF THE | | | POOL AND THE POOL EQUIPMENT. FBC 107.2.1 | | | | | | 3) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. | | | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND | | | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF | | | THE PERSON RESPONSIBLE FOR THE DESIGN. | | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | | 61G15 | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2020-12-11 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-12-11 |
Time |
15:28 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-12-11 |
Time |
15:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2020-11-30 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2020-11-30 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2020-11-30 |
Time |
10:20 |
Sent To |
|
|
| Notes |
| 2020-11-30 10:27:26 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | FAC = FLORIDA ADMINISTRATIVE CODE | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1.PROVIDE LOAD CALCULATION FOR SERVICE, INCLUDE | | | EXISTING AND NEW LOADS TO CONFIRM CAPACITY OF SERVICE | | | IS ADEQUATE. NEC 215.2, 220, 408.30; FBC RE E3602.2 | | | 2.NEC 2014 680.8 PROVIDE CLEARANCE | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. | | | | | | SINCERELY, | | | | | | PHIL PETTY | | | CHIEF ELECTRICAL INSPECTOR , ELECTRICAL PLANS EXAMINER | | | | | | 561-805-6742 | | | [email protected] | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2020-10-29 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2020-10-29 |
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2020-10-29 |
Time |
08:02 |
Sent To |
|
|
| Notes |
| 2020-10-29 08:23:24 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | FAC = FLORIDA ADMINISTRATIVE CODE | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1.PROVIDE LOAD CALCULATION FOR SERVICE, INCLUDE | | | EXISTING AND NEW LOADS TO CONFIRM CAPACITY OF SERVICE | | | IS ADEQUATE. NEC 215.2, 220, 408.30; FBC RE E3602.2 | | | 2.NEC 2014 680.8 PROVIDE CLEARANCE | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. | | | | | | SINCERELY, | | | | | | PHIL PETTY | | | CHIEF ELECTRICAL INSPECTOR , ELECTRICAL PLANS EXAMINER | | | | | | 561-805-6742 | | | [email protected] | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-09-22 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-09-22 |
Time |
11:26 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-09-10 |
Time |
11:26 |
Sent To |
|
|
| Notes |
| 2020-09-22 11:31:10 | NO PLANS SUBMITTED FOR ELECTRICAL WORK. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2020-12-11 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-12-11 |
Time |
15:29 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-12-03 |
Time |
08:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-11-30 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2020-11-30 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2020-11-13 |
Time |
10:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-11-05 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-11-05 |
Time |
09:53 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-10-22 |
Time |
14:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-09-22 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-09-22 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-08-26 |
Time |
07:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2020-11-16 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-11-16 |
Time |
11:22 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-11-16 |
Time |
11:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2020-10-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-10-23 |
Time |
07:49 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-10-23 |
Time |
07:49 |
Sent To |
|
|
| Notes |
| 2020-10-23 07:50:55 | 10/23/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1. SIGNED AND SEALED DRAWINGS NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR - | | | IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE | | | ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN | | | REVIEW REQUEST FORM" EXPLAINING THE REASON FOR | | | SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND | | | ASKING FOR THE FORM. | | | | | | | | | 2. PLEASE SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR | | | THE MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP | | | FROM ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER | | | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 | | | EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE | | | (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE | | | DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE | | | SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH | | | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS | | | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, | | | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS | | | EXCEPT THE PUMP. | | | | | | 3. PLEASE SUBMIT ON THE PUMP CURVE WHICH CURVE KEY IS | | | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS | | | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE | | | TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS. | | | 4.4.9, 4.4.9.1. | | | | | | 4. A CONTAINMENT REDUCED PRINCIPAL ZONE BACKFLOW BY A | | | LICENSED CONTRACTOR IS REQUIRED. THIS IS A MULTI-FAMILY | | | DWELLINGS AND WATER USERS WILL BE REQUIRED TO INSTALL A | | | BACKFLOW PREVENTION ASSEMBLY AT THE POINT OF DELIVERY | | | PER THE CITY OF WEST PALM CROSS CONNECTION CONTROL | | | MANUAL PAGE 11 (C). | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-08-27 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-08-27 |
Time |
17:35 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-08-27 |
Time |
17:35 |
Sent To |
|
|
| Notes |
| 2020-08-27 17:36:41 | NO PLANS WHERE SUBMITTED FOR PLUMBING REVIEW, PLEASE | | | UPLOAD A FULL SET FOR EVALUATION. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2020-11-30 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2020-11-30 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2020-11-30 |
Time |
10:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-11-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-11-12 |
Time |
11:16 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-11-12 |
Time |
11:05 |
Sent To |
|
|
| Notes |
| 2020-11-12 11:17:50 | DRAWINGS 1 OF 4 TO 4 OF 4 WITH ENGINEER'S ORIGINAL | | | SEAL/SIGNATURE MATCH DRAWING APPROVED BY BUILDING. JG. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-10-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-30 |
Time |
09:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-30 |
Time |
09:05 |
Sent To |
|
|
| Notes |
| 2020-10-30 09:06:54 | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | | 61G15 | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-09-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-22 |
Time |
11:08 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-09-22 |
Time |
11:08 |
Sent To |
|
|
| Notes |
| 2020-09-22 11:09:07 | FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. | | | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND | | | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF | | | THE PERSON RESPONSIBLE FOR THE DESIGN. | | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | | 61G15 | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2020-11-04 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
2020-11-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
rthermid |
Date |
2020-11-04 |
Time |
|
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2020-09-01 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
2020-09-01 |
Time |
|
Rev Time |
|
| Received By |
rthermid |
Date |
2020-09-01 |
Time |
|
Sent To |
I |
|
| Notes |
| 2020-09-01 13:48:53 | - PROVIDE A MARKED SURVEY OF THE PROPERTY INDICATING | | | THE LOCATION AND SETBACKS OF THE PROPOSED WORK | | | - PROVIDE POOL PLANS |
|
|