|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20080958
| Plan Review Stops For Permit 20080958 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2020-09-09 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2020-09-09 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2020-09-09 |
Time |
|
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-09-02 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-09-02 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-09-02 |
Time |
15:46 |
Sent To |
|
|
| Notes |
| 2020-09-02 15:53:42 | UNDERGROUND SHALL COMPLY WITH CITY UTILITIES | | | AND PLUMBING CODE AS APPLICABLE | | | | | | PER NFPA 13D | | | | | | 1.1* SCOPE. | | | 1.1.1 THIS STANDARD SHALL COVER THE DESIGN, | | | INSTALLATION, AND | | | MAINTENANCE OF AUTOMATIC SPRINKLER SYSTEMS FOR | | | PROTECTION | | | AGAINST THE FIRE HAZARDS IN ONE- AND TWO-FAMILY | | | DWELLINGS AND | | | MANUFACTURED HOMES. | | | | | | 5.3* UNDERGROUND PIPE. ANY TYPE OF PIPE OR TUBE | | | ACCEPTABLE | | | UNDER THE APPLICABLE PLUMBING CODE FOR UNDERGROUND | | | SUPPLY | | | PIPE SHALL BE ACCEPTABLE AS AN UNDERGROUND SUPPLY FOR A | | | FIRE | | | SPRINKLER SYSTEM WHEN INSTALLED BETWEEN THE POINT OF | | | CONNECTION | | | AND THE SYSTEM RISER. | | | | | | 6.2.3.1 THE CONTROL VALVE SHALL BE PERMITTED TO SERVE | | | THE DOMESTIC | | | WATER SUPPLY. | | | | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-09-09 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-09-09 |
Time |
16:12 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-08-20 |
Time |
10:21 |
Sent To |
|
|
| Notes |
| 2020-09-01 10:21:20 | CONVERTED TO DIGITAL. JG. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2020-09-02 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-09-02 |
Time |
07:02 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-09-02 |
Time |
06:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2020-09-03 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-09-03 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-09-03 |
Time |
14:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-09-30 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-09-30 |
Time |
10:44 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-09-30 |
Time |
10:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-09-01 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-09-01 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-09-01 |
Time |
10:21 |
Sent To |
|
|
| Notes |
| 2020-09-01 10:30:54 | FIRE SPRINKLER PLAN AND HYDRAULIC CALCULATIONS NEED THE | | | SEAL AND SIGNATURE OF THE ENGINEER OF RECORD. | | | NOTE: NEED TO SUBMIT DRAWING AND CALCULATIONS WITH | | | ENGINEER'S ORIGINAL SEAL AND SIGNATURE WHEN SUBMITTING | | | DOCUMENTS FOR PUBLIC RECORDS AS REQUIRED BY SEC. | | | 61G15-23.003 FAC AND CHAPTER 471 F.S. | | | | | | THERE ARE THERE TWO OPTIONS TO ADDRESS THIS ISSUE: | | | (1)SUBMIT PLAN AND CALCULATIONS WITH ENGINEER'S | | | ORIGINAL SEAL/SIGNATURE OR | | | (2) UPLOAD TO PROJECTDOX PLAN AND CALCULATIONS WITH | | | ENGINEER'S DIGITAL SIGNATURE. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |