Plan Review Details - Permit 20080686
Plan Review Stops For Permit 20080686
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-09-09 Cont ID  
Sent By rmcdouga Date 2020-09-09 Time 16:24 Rev Time 0.00
Received By rmcdouga Date 2020-09-09 Time 16:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-09-01 Cont ID  
Sent By fgiaquin Date 2020-09-01 Time 21:46 Rev Time 0.00
Received By fgiaquin Date 2020-09-01 Time 20:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-24 Cont ID  
Sent By lcrespo Date 2020-09-24 Time 07:50 Rev Time 0.00
Received By lcrespo Date 2020-09-23 Time 14:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-09 Cont ID  
Sent By rmcdouga Date 2020-09-09 Time 16:24 Rev Time 0.00
Received By rmcdouga Date 2020-08-14 Time 12:34 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-09-24 Cont ID  
Sent By lcrespo Date 2020-09-24 Time 07:49 Rev Time 0.00
Received By lcrespo Date 2020-09-24 Time 07:35 Sent To  
Notes
2020-09-24 07:50:0809/24/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-08-17 Cont ID  
Sent By lcrespo Date 2020-08-17 Time 07:15 Rev Time 0.00
Received By lcrespo Date 2020-08-17 Time 06:34 Sent To  
Notes
2020-08-17 07:16:2208/17/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE FILTER ON PLANS CALLS OUT A CC200 AND THE
 SUBMITTED SPECS DOES NOT HAVE THAT MODEL LISTED, PLEASE
 PROVIDE ONE THE DOES PER THE WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 2. THE HEATER SHOWN ON PLANS CALLS OUT FOR A T135 MODEL
 AND THE ONE SUBMITTED DOES NOT MATCH THAT, PLEASE
 PROVIDE ONE THE DOES PER THE WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3. THE SUBMITTED POOL PUMP CURVE DOES NOT IDENTIFY THE
 PUMP CURVE PLEASE SPECIFY WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL, SHOW IT ON
 THE CURVE. THIS IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM
 FLOW FROM THE TDH CALCULATIONS PER THE ANSI/APSP/ICC 7
 - 2013 SECS. 4.4.9, 4.4.9.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-09-09 Cont ID  
Sent By rmcdouga Date 2020-09-09 Time 16:24 Rev Time 0.00
Received By rmcdouga Date 2020-09-09 Time 16:24 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-21 Cont ID  
Sent By rthermid Date 2020-08-21 Time   Rev Time  
Received By rthermid Date 2020-08-21 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved