Plan Review Details - Permit 20080531
Plan Review Stops For Permit 20080531
Review Stop E ELECTRICAL
Rev No 2 Status F Date 2020-10-01 Cont ID  
Sent By ppetty Date 2020-10-01 Time 09:51 Rev Time 0.00
Received By ppetty Date 2020-10-01 Time 09:51 Sent To  
Notes
2020-10-01 09:52:18NO ELECTRICAL TO REVIEW

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-08-21 Cont ID  
Sent By ppetty Date 2020-08-21 Time 09:08 Rev Time 0.00
Received By ppetty Date 2020-08-21 Time 09:03 Sent To M
Notes
2020-08-21 09:08:46CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1.ELECTRICAL PLAN IS REQUIRED TO BE SIGNED/SEALED BY A
 DESIGN PROFESSIONAL OR SIGNED BY THE ELECTRICAL
 CONTRACTOR QUALIFIER. PROVIDE CORRECTION. FS
 471.003(2)(H); 471.025; WPB FBC 107.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 PHIL PETTY
 ELECTRICAL PLANS EXAMINER
 561-805-6742
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-01 Cont ID  
Sent By ppetty Date 2020-10-01 Time 09:52 Rev Time 0.00
Received By ppetty Date 2020-09-29 Time 06:11 Sent To  
Notes
2020-09-29 06:11:48ROUTED TO MECHANICAL INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-21 Cont ID  
Sent By pvalenti Date 2020-08-21 Time 14:44 Rev Time 0.00
Received By pvalenti Date 2020-08-20 Time 15:34 Sent To  
Notes
2020-08-20 15:34:47ROUTED TO MECHANICAL BIN

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2020-09-29 Cont ID  
Sent By pvalenti Date 2020-09-29 Time 14:18 Rev Time 0.00
Received By pvalenti Date 2020-09-29 Time 14:18 Sent To  
Notes
2020-09-29 14:19:07PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 MECHANICAL REVIEW DENIED:
  
 FBC R M 1401.4, PLEASE PROVIDE THE SIGNED/SEALED
 ENGINEER APPROVED TIE-DOWN DETAILS FOR BOTH EXTERIOR
 CONDENSING UNITS.
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-08-21 Cont ID  
Sent By pvalenti Date 2020-08-21 Time 14:10 Rev Time 0.00
Received By pvalenti Date 2020-08-21 Time 13:53 Sent To  
Notes
2020-08-21 14:44:11PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 MECHANICAL REVIEW DENIED:
  
 1) FBC B & WPB AMENDMENTS 107.2.1, PROVIDE, ON NEW
 PLANS FOR PROPOSED WORK, THE SIGNATURES OF THE PERSON
 RESPONSIBLE FOR THE DESIGN. WHEN THE PERSON RESPONSIBLE
 FOR THE SUBMITTED DRAWINGS IS A DESIGN PROFESSIONAL
 THAT PERSON NEEDS TO PROVIDE SIGNATURES AND SEALS AS
 PER F.S. 471 AMD 481.
 2) FBC R M 1401.4, PROVIDE SIGNED AND SEALED ENGINEER
 APPROVED TIE DOWN DETAILS FOR BOTH EXTERIOR CONDENSING
 UNITS.
 3) FBC B 107, PROVIDE THE MANUFACTURER'S SPECIFICATIONS
 FOR ALL NEW UNITS INCLUDING THE MINI-SPLITS WITH (3)
 AIR HANDLERS AND (1) CONDENSING UNIT.

Review Stop Z ZONING
Rev No 1 Status F Date 2020-09-30 Cont ID  
Sent By rthermid Date 2020-09-30 Time   Rev Time 0.00
Received By rthermid Date 2020-09-30 Time   Sent To I
Notes
2020-09-30 13:48:44ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 9/30/2020
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PLEASE PROVIDE A COMPLETE SURVEY OF THE PROPERTY
 INDICATING THE SETBACKS OF ALL EXTERIOR EQUIPMENT TO
 THE PROPERTY LINES. PURSUANT THE CITY OF WEST PALM
 BEACH ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR),
 SECTION 94-305(B)(4): MECHANICAL EQUIPMENT MAY NOT
 PROJECT MORE THAN 4 FEET INTO A REQUIRED SETBACK.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOGIN
 INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
  
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  