Plan Review Details - Permit 20080512
Plan Review Stops For Permit 20080512
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status N Date 2020-08-20 Cont ID  
Sent By dbattles Date 2020-08-20 Time 14:55 Rev Time 0.00
Received By dbattles Date 2020-08-20 Time 14:55 Sent To  
Notes
2020-08-20 14:57:14NO UNDERGROUND AND NO RIGHT OF WAY.
 THIS PERMIT IS FOR REMOVING ROTTEN WOOD AND SECURING
 THE GAZEBO UNTIL THE BUILDING PERMIT IS SUBMITTED.
 THIS IS AN OPEN WOOD GAZEBO.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2020-08-19 Cont ID  
Sent By shill Date 2020-08-19 Time 15:38 Rev Time 0.00
Received By shill Date 2020-08-19 Time 15:38 Sent To  
Notes
2020-08-19 15:39:19PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-08-20 Cont ID  
Sent By dbattles Date 2020-08-20 Time 14:54 Rev Time 0.00
Received By dbattles Date 2020-08-20 Time 14:54 Sent To  
Notes
2020-08-20 14:57:32NO UNDERGROUND AND NO RIGHT OF WAY.
 THIS PERMIT IS FOR REMOVING ROTTEN WOOD AND SECURING
 THE GAZEBO UNTIL THE BUILDING PERMIT IS SUBMITTED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-08-19 Cont ID  
Sent By shill Date 2020-08-19 Time 15:38 Rev Time 0.00
Received By shill Date 2020-08-19 Time 15:29 Sent To  
Notes
2020-08-19 15:38:22****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
  
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183. AFTER THEY FAX THE RELEASE TO YOU, SEND A
 COPY VIA EMAIL TO [email protected] WITH THE PERMIT
 NUMBER IN THE SUBJECT LINE.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING #703.
  
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT DEMOLITION ADDRESS HAS
 BEEN INSPECTED AND/OR TREATED FOR RODENTS.
  
 6. COMPLETE THE DEMO DEBRIS FORM:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF
 THE STRUCTURE(S) TO BE DEMOLISHED. AN AERIAL WAS
 PROVIDED BUT IT IS NOT CLEAR WHAT STRUCTURE(S) ARE TO
 BE DEMOLISHED.
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status N Date 2020-08-20 Cont ID  
Sent By dbattles Date 2020-08-20 Time 14:53 Rev Time 0.00
Received By dbattles Date 2020-08-20 Time 14:53 Sent To  
Notes
2020-08-20 14:54:46NO UNDERGROUND AND NO RIGHT OF WAY.
 THIS PERMIT IS FOR REMOVING ROTTEN WOOD AND SECURING
 THE GAZEBO UNTIL THE BUILDING PERMIT IS SUBMITTED.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2020-08-19 Cont ID  
Sent By rrossano Date 2020-08-19 Time   Rev Time  
Received By rrossano Date 2020-08-19 Time   Sent To  
Notes
2020-08-19 16:40:21PLEASE ADDRESS BUILDING DEPT. COMMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-20 Cont ID  
Sent By dbattles Date 2020-08-20 Time 14:55 Rev Time 0.00
Received By dbattles Date 2020-08-12 Time 16:15 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2020-08-19 Cont ID  
Sent By shill Date 2020-08-19 Time 15:39 Rev Time 0.00
Received By shill Date 2020-08-19 Time 15:39 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved