Plan Review Details - Permit 20080364
| Plan Review Stops For Permit 20080364 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
P |
Date |
2020-09-02 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-09-02 |
Time |
11:35 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-09-02 |
Time |
11:35 |
Sent To |
|
|
| Notes |
| 2020-09-02 11:37:05 | MAIN ADDRESS CHANGED FROM *51 BANYAN BLVD TO 991 BANYAN | | | BLVD, TWO GROUND FLOOR RETAIL SPACES ARE NOW 901 BNAYAN | | | BLVD (SOUTH EAST TENANT SPACE) AND 106 N TAMARIND AVE | | | (NORTH WEST TENANT SPACE). |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2020-08-25 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-08-25 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-08-25 |
Time |
15:40 |
Sent To |
|
|
| Notes |
| 2020-08-25 15:52:48 | CURRENT ADDRESS DOES NOT FALL IN LINE WITH THE NEW | | | BUILDINGS ENTRANCE AND THE CITY'S ROAD LINES, ADDRESS | | | WILL NEED TO BE CHANGED, ADDRESS WILL ALSO BE REQUIRED | | | FOR: GROUND FLOOR (MAIN ENTRANCE, RETAIL 1 & 2), ALL | | | UNITS IN THE BUILDING (3RD FLOOR AND UP). PLEASE | | | CONTACT [email protected] TO DISCUSS ADDRESSING. |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
2 |
Status |
N |
Date |
2020-11-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-11-05 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-11-05 |
Time |
16:32 |
Sent To |
|
|
| Notes |
| 2020-11-05 16:36:03 | THIS PROJECT IS EXEMPT FROM AIPP REQUIREMENT PER EMAIL | | | ON 11-5-2020 FROM SYBILLE WELTER. |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
P |
Date |
2023-02-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-03 |
Time |
11:44 |
Rev Time |
0.00 |
| Received By |
swelter |
Date |
2023-02-03 |
Time |
14:32 |
Sent To |
|
|
| Notes |
| 2020-09-03 11:47:17 | THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES | | | ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR | | | NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT | | | APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL | | | PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | | $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE. | | | PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND | | | CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, | | | ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION | | | 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL | | | PROJECT CONSTRUCTION COST. | | | PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE | | | V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND | | | NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO | | | THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE | | | PROJECTS. | | | FOR INFORMATION PLEASE CONTACT: | | | MS. SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR AT | | | 822-1515 OR E-MAIL: [email protected] | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2020-12-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-12-01 |
Time |
11:23 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-12-01 |
Time |
11:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-11-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-11-16 |
Time |
15:26 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-16 |
Time |
15:12 |
Sent To |
|
|
| Notes |
| 2020-11-16 15:13:57 | DEFERRED ITEMS - TO BE REVIEWED AND MARKED APPROVED BY | | | THE BUILDING DESIGNER OF RECORD AND REVIEWED BY THE | | | BUILDING DIVISION PLAN REVIEW BEFORE INSTALLATION - | | | 1) EXTERIOR WINDOW, DOOR AND LOUVER PRODUCT APPROVALS. | | | FBC 1609 | | | 2) SHORING AND RESHORING PLANS. FBC 110.8.4.3 | | | 3) GUARD RAILING. FBC 1607.8 | | | 4) ROOFING SYSTEM PRODUCT APPROVALS. FBC 1609.5.2 | | | 5) ROOF TOP EQUIPMENT SCREENING. FBC 1510.6 | | | 6) POOL. FBC 454 | | | 7) ACOUSTICAL TEST REPORTS FOR THE FLOOR/CEILING | | | ASSEMBLIES IIC AND STC PER FBC 1207 AND FLAME SPREAD | | | INDEX PER FBC 603.1 | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-10-15 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-10-15 |
Time |
07:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-10-15 |
Time |
07:32 |
Sent To |
|
|
| Notes |
| 2020-10-15 07:47:58 | NEW 8 STORY BUILDING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE SHOW THE ACCESSIBLE ROUTE TO THE 2ND FLOOR | | | RETAIL NUMBER 1 SPACE (STAIRS ARE NOT A COMPONENT OF AN | | | ACCESSIBLE ROUTE FBC A 402.2) FBC A 201.1.1 VERTICAL | | | ACCESSIBILITY. | | | 2) PLEASE SHOW THE REQUIRED STAIR HANDRAILS FOR THE 2ND | | | FLOOR RETAIL SPACE NUMBER 1 TO COMPLY WITH FBC 1011.11 | | | 3) PLEASE SHOW THE DETAILS FOR THE ADDED EGRESS | | | STAIRWAY ON THE REVISED POOL DECK DRAWING TO COMPLY | | | WITH FBC CHAPTER 10 | | | 4) CANNOT HAVE OPENINGS ON THE NORTH WALL 1ST AND 2ND | | | FLOOR AND ONLY 15% FOR THE REMAINING FLOORS PER FBC | | | 705.8.2 (UNLESS YOU CAN SHOW THAT THE AREA NORTH OF THE | | | PROPERTY LINE MEETS THE EXCEPTIONS OF FBC 705.8.1). | | | 5) DRAWING REVISIONS IN PROJECTDOX NEED TO BE ADDED TO | | | ?DRAWINGS? FOLDER NOT ?SUPPORTING DOCS? FOLDER. CONTACT | | | [email protected] FOR ASSISTANCE. | | | 6) REVISED DRAWING (A-3.08) UNPROTECTED OPENINGS EAST | | | SIDE ? HASH MARKS ON THE EAST SIDE ARE FOR UNPROTECTED | | | OPENINGS? ? THE RETAIL AREA 2 GLAZING IS NOT SHOWN AS | | | FIRE RATED ? EXIT DOOR (C17) IS NOT SHOWN AS FIRE RATED | | | - PLEASE REVISE THE OPENING PROTECTION CALCULATIONS. | | | 7) EXIT SPACING SHOWN ON THE 3RD FLOOR POOL DECK IS NOT | | | ? OR MORE THAN THE DIAGONAL DISTANCE SHOWN ? FBC | | | 1007.1.1 | | | 8) PLEASE FILL OUT THE REQUIRED THRESHOLD FORMS ? | | | ?THRESHOLD/SPECIAL INSPECTOR AGREEMENT OF | | | UNDERSTANDING? ? SEE THE ?GUIDELINES AND POLICIES FOR | | | PROJECTS CONCERNING THRESHOLD/SPECIAL INSPECTORS AND | | | RESIDENT INSPECTORS? ? WHICH CAN BE PROVIDED BY E | | | MAILING [email protected] AND ASKING FOR THE THRESHOLD | | | GUIDELINES BROCHURE. | | | | | | DEFERRED ITEMS ? TO BE REVIEWED AND MARKED APPROVED BY | | | THE BUILDING DESIGNER OF RECORD AND REVIEWED BY THE | | | BUILDING DIVISION PLAN REVIEW BEFORE INSTALLATION - | | | 1) EXTERIOR WINDOW, DOOR AND LOUVER PRODUCT APPROVALS. | | | FBC 1609 | | | 2) SHORING AND RESHORING PLANS. FBC 110.8.4.3 | | | 3) GUARD RAILING. FBC 1607.8 | | | 4) ROOFING SYSTEM PRODUCT APPROVALS. FBC 1609.5.2 | | | 5) ROOF TOP EQUIPMENT SCREENING. FBC 1510.6 | | | 6) POOL. FBC 454 | | | 7) ACOUSTICAL TEST REPORTS FOR THE FLOOR/CEILING | | | ASSEMBLIES IIC AND STC PER FBC 1207 AND FLAME SPREAD | | | INDEX PER FBC 603.1 | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-09-08 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-08 |
Time |
10:48 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-25 |
Time |
13:43 |
Sent To |
|
|
| Notes |
| 2020-09-03 10:38:00 | PLAN | | | REVIEW COMMENTS | | | THRESHOLD BUILDING | | | 8 STORY APARTMENT BUILDING (MIXED USE R-2, M, S-2 ) | | | CONST. TYPE 1-B, SPRINKLERED | | | 170 MPH, EXPOSURE "C" | | | FLOOD ZONE "X" | | | 951 BANYAN | | | PERMIT #20080364 | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THIS IS A THRESHOLD BUILDING / FL S. S. 553.71(7). | | | "THRESHOLD BUILDING" MEANING ANY BUILDING WHICH IS | | | GREATER THAN (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH | | | HAS AN ASSEMBLY OCCUPANCY CLASSIFICATION AS DEFINED IN | | | THE FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. | | | IN AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500 | | | PERSONS. | | | | | | A) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION | | | PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL | | | INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A | | | THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION | | | PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL | | | INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING | | | AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR | | | THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE | | | OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE | | | SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT | | | THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE | | | WITH THE PERMITTED DOCUMENTS. | | | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | | | | | C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT | | | 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED | | | TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF | | | INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME | | | MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED | | | HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL | | | REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN | | | INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | | MEETING THE ABOVE CRITERIA. | | | | | | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY | | | FOR THIS TYPE OF CONSTRUCTION. | | | | | | F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR | | | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE | | | IN BLACK & WHITE. | | | | | | G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES, | | | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT | | | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING | | | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND | | | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING | | | DOCUMENTS BY THE CONTRACTOR. | | | | | | H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED | | | TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL | | | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE | | | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 | | | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. | | | | | | I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR | | | THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS | | | REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, | | | APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND | | | CEILINGS. | | | | | | J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL | | | BE HAPPY TO SEND YOU A COPY OF THE CURRENT (OCTOBER | | | 2018) GUIDELINES AND POLICIES FOR PROJECTS CONCERNING | | | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS. | | | | | | 2) SUBMIT MANAGEMENT OF TRAFFIC (MOT) PLANS AND SPECIFY | | | HOW COMPLIANCE WITH FBC CHAPTER 33 SAFEGUARDS DURING | | | CONSTRUCTION FOR THE FOUNDATION PERMIT WILL BE MET. | | | | | | 3) THE PROJECT APPEARS TO ENCOMPASS SEVERAL PARCELS OR | | | LOTS. A UNITY OF TITLE WILL BE REQUIRED BEFORE THE | | | PERMIT IS ISSUED. FBC 107.2.1 | | | | | | 4) SUBMIT A GEOTECHNICAL REPORT THAT SPECIFIES THE | | | REQUIRED SOIL BEARING CAPACITY AND THE RECOMMENDED SOIL | | | PREPARATION METHOD. FBC 1803. | | | | | | 5) THE ELEVATIONS FOR THE BUILDING AND SITE USE NGVD 29 | | | VERTICAL DATUM. THE CURRENT FLOOD INSURANCE RATE MAPS | | | USE NAVD 88 VERTICAL DATUM. THESE MAPS WERE ADOPTED BY | | | THE CITY ON OCT 5, 2017. IN ORDER TO AVOID CONFUSION | | | AND POSSIBLE ERRORS PLEASE SPECIFY THE ELEVATIONS USING | | | THE CURRENT NAVD 88 DATUM. FBC 107.2.1 | | | | | | 6) ON SHEET A-1.00, THE FIRE SEPARATION DISTANCE ON THE | | | NORTH SIDE OF THE BUILDING TO THE PROPERTY LINE IS ONLY | | | 3'-10" AT THE MERCANTILE OCCUPANCY AT THE NORTHWEST | | | CORNER AND 1'-1" AT THE NORTHEAST CORNER. NO OPENINGS | | | ARE ALLOWED FOR LESS THAN 3' OF FIRE SEPARATION | | | DISTANCE AND FROM 3' TO LESS THAN 5' ONLY 15 PERCENT OF | | | WALL AREA PER STORY IS ALLOWED. SEE FBC TABLE 705.8 I | | | UNDERSTAND THAT THERE IS A RESTRICTIVE COVENANT IN | | | PROGRESS THAT IF APPROVED WILL CHANGE THE FIRE | | | SEPARATION DISTANCE. WHEN THIS HAS BEEN APPROVED I WILL | | | RE-VISIT THIS ISSUE. THE PROPOSED FIRE SEPARATION | | | APPEARS TO BE LESS THAN 20' FOR MOST OF THE BUILDING ON | | | THE NORTH SIDE. FBC TABLE 705.8 ALLOWS 75 PERCENT | | | OPENINGS FOR A FSD OF 15' TO LESS THAN 20' AND | | | UNLIMITED OPENINGS FOR A FSD OF 20' OR MORE PER STORY | | | FOR A FULLY SPRINKLERED BUILDING. A CLEAR PLAN SHOWING | | | THE FIRE SEPARATION DISTANCE AND CALCULATIONS WILL BE | | | REQUIRED IF LESS THAN 20' OF FIRE SEPARATION DISTANCE. | | | YOU MAY NEED TO REVISE THE INFORMATION IN THE FIRE | | | SEPARATION SCHEDULES ON SHEET A-0.02. | | | | | | 7) ALSO ON SHEET A-1.00 THE FIRE SEPARATION DISTANCE ON | | | THE EAST END OF THE BUILDING IS 15'-7" FOR THE GROUND | | | AND SECOND LEVEL (BASE) WHICH ALLOWS 75 PERCENT FOR A | | | FSD OF 15' TO LESS THAN 20'. PROVIDE THE CALCULATIONS | | | FOR EACH STORY TO SHOW COMPLIANCE WITH FBC TABLE 705.8. | | | NOTE: IN THE FIRE SEPARATION SCHEDULE ON SHEET A-0.02 | | | THE INFORMATION IS REVERSED FOR THE BASE AND THE TOWER. | | | | | | 8) ONE OF THE REQUIRED EXITS FROM THE MERCANTILE | | | OCCUPANCY (RETAIL SPACE #1) EXISTS INTO THE S-2 | | | OCCUPANCY (PARKING GARAGE). THE LIFE SAFETY PLAN DOES | | | NOT SHOW A RATED CORRIDOR SEPARATED FROM THE PARKING | | | GARAGE THAT LEADS TO THE EXIT DISCHARGE. FBC 1016.2 | | | | | | 9) THE PLANS SHOW AN EXIT PASSAGEWAY CONNECTION | | | INTERIOR EXIT STAIR 2 TO THE EXIT DISCHARGE. LABEL THIS | | | EXIT PASSAGEWAY AND PROVIDE A NOTE STATING THAT NO | | | OPENINGS OR PENETRATIONS ARE ALLOWED EXCEPT THOSE | | | REQUIRED FOR EXITING OR NECESSARY TO SERVICE OR PROTECT | | | THE EXIT COMPONENT. FBC 1024 & 1023.3.1 | | | | | | 10) THE SECTION OF STAIR 2 ON SHEET A-7.01 SHOWS 8" | | | RISERS AT THE SECOND FLOOR. PLEASE CORRECT. FBC | | | 1011.5.2 | | | | | | 11) ONE OF THE THE REQUIRED EXITS FROM THE POOL DECK | | | AREA PASSES THROUGH THE ROOF TOP GARDEN AND THE | | | COMMUNITY ROOM. EXPLAIN HOW THIS WILL MEET THE | | | REQUIREMENTS OF FBC 1016.2. | | | | | | 12) THE DOUBLE DOORS AT THE COMMUNITY ROOM SWING OUT | | | INTO THE CORRIDOR AND APPEAR TO ENCROACH INTO THE | | | REQUIRED MEANS OF EGRESS WIDTH MORE THAN ALLOWED BY FBC | | | 1005.7.1. | | | | | | 13) CLARIFY THE FIRE RATING OF THE TRASH CHUTE | | | VESTIBULE AND ITS DOOR TO THE CORRIDOR. CLARIFY THE | | | FIRE RATING OF THE OPENING INTO THE REQUIRED 2 HOUR | | | FIRE RATED SHAFT FOR THE TRASH CHUTE. FBC 713.13 | | | | | | 14) THE LIFE SAFETY PLANS HAVE A NOTE AT THE ELEVATORS | | | THAT REFERS TO AN AREA OF REFUGE. AREA OF REFUGE IS NO | | | LONGER IN THE FBC. THAT SECTION IS NOTED AS RESERVED IN | | | THE 2017 FBC. SINCE THIS IS NO LONGER A CODE | | | REQUIREMENT AND THE PLANS DO NOT EVEN SHOW THE REQUIRED | | | FIRE AND SMOKE PROTECTED AREA, THIS NOTE SHOULD BE | | | REMOVED FROM THE DRAWINGS. FBC 107.2.1 AND 1009.6 | | | | | | 15) SHOW THAT THERE IS AN ELEVATOR THAT COMPLIES WITH | | | FBC 3002.4 FOR THE ABILITY TO ACCOMMODATE AN AMBULANCE | | | STRETCHER. | | | | | | 16) IDENTIFY THE VAN PARKING SPACES ON THE PLANS AND | | | SHOW THAT THE MINIMUM REQUIRED 8'-2" CLEARANCE WILL BE | | | MAINTAINED AS REQUIRED BY FBC ACCESSIBILITY 502.5 | | | VERTICAL CLEARANCE. | | | PARKING SPACES FOR VANS AND ACCESS AISLES AND VEHICULAR | | | ROUTES SERVING THEM SHALL PROVIDE A VERTICAL CLEARANCE | | | OF 98 INCHES (2490 MM) MINIMUM. NOTE: FLORIDA LAW, | | | S.553.511, F.S., REQUIRES SIGNS BE POSTED THAT WILL | | | WARN HANDICAPPED-EQUIPPED VAN OPERATORS OF HEIGHT | | | LIMITATIONS SO THEY WILL NOT PASS BEYOND A POINT WHERE | | | THE VAN CANNOT BE MANEUVERED. | | | | | | 17) THE DOOR FROM THE GYM TO THE YOGA ROOM DOES NOT | | | APPEAR TO HAVE THE REQUIRED 18" CLEAR ON THE PULL SIDE | | | FOR MANEUVERING CLEARANCE. FBC ACCESSIBILITY 404.2.4.1 | | | | | | 18) THE SPACE ABOVE RETAIL SPACE 1 APPEARS TO BE A | | | STORY RATHER THAN A MEZZANINE AS SPECIFIED ON THE | | | PLANS. CLARIFY HOW THIS AREA IS A MEZZANINE AND SHOW | | | COMPLIANCE WITH FBC 201.1.1 VERTICAL ACCESSIBILITY. | | | SECTIONS 553.501-553.513, F.S., AND THE ADA STANDARDS | | | FOR ACCESSIBLE DESIGN DO NOT RELIEVE THE OWNER OF ANY | | | BUILDING, STRUCTURE OR FACILITY GOVERNED BY THOSE | | | SECTIONS FROM THE DUTY TO PROVIDE VERTICAL | | | ACCESSIBILITY TO ALL LEVELS ABOVE AND BELOW THE | | | OCCUPIABLE GRADE LEVEL REGARDLESS OF WHETHER THE | | | STANDARDS REQUIRE AN ELEVATOR TO BE INSTALLED IN SUCH | | | BUILDING, STRUCTURE OR FACILITY, EXCEPT FOR: | | | 1.ELEVATOR PITS, ELEVATOR PENTHOUSES, MECHANICAL ROOMS, | | | PIPING OR EQUIPMENT CATWALKS AND AUTOMOBILE LUBRICATION | | | AND MAINTENANCE PITS AND PLATFORMS. | | | 2.UNOCCUPIABLE SPACES, SUCH AS ROOMS, ENCLOSED SPACES | | | AND STORAGE SPACES THAT ARE NOT DESIGNED FOR HUMAN | | | OCCUPANCY, FOR PUBLIC ACCOMMODATIONS OR FOR WORK AREAS. | | | 3.OCCUPIABLE SPACES AND ROOMS THAT ARE NOT OPEN TO THE | | | PUBLIC AND THAT HOUSE NO MORE THAN FIVE PERSONS, | | | INCLUDING, BUT NOT LIMITED TO EQUIPMENT CONTROL ROOMS | | | AND PROJECTION BOOTHS. | | | 4.THEATERS, CONCERT HALLS, AND STADIUMS, OR OTHER LARGE | | | ASSEMBLY AREAS THAT HAVE STADIUM-STYLE SEATING OR | | | TIERED SEATING IF SECTIONS 221 AND 802 ARE MET. | | | 5.ALL PLAY AND RECREATION AREAS IF THE REQUIREMENTS OF | | | CHAPTER 10 ARE MET. | | | 6.ALL EMPLOYEE AREAS AS EXEMPTED BY 203.9. | | | 7.FACILITIES, SITES AND SPACES EXEMPTED BY SECTION 203. | | | | | | 19) IT APPEARS THAT THIS PROJECT WILL BE USING | | | GOVERNMENT FUNDING WHICH WILL REQUIRE THAT ACCESSIBLE | | | ENTRANCE INTO THE POOL WILL BE REQUIRED. SHOW HOW THE | | | NEW POOL WILL COMPLY WITH FBC ACCESSIBILITY SECTION | | | 242.2 SWIMMING POOLS. AT LEAST TWO ACCESSIBLE MEANS OF | | | ENTRY SHALL BE PROVIDED FOR SWIMMING POOLS. ACCESSIBLE | | | MEANS OF ENTRY SHALL BE SWIMMING POOL LIFTS COMPLYING | | | WITH 1009.2; SLOPED ENTRIES COMPLYING WITH 1009.3; | | | TRANSFER WALLS COMPLYING WITH 1009.4; TRANSFER SYSTEMS | | | COMPLYING WITH 1009.5; AND POOL STAIRS COMPLYING WITH | | | 1009.6. AT LEAST ONE ACCESSIBLE MEANS OF ENTRY PROVIDED | | | SHALL COMPLY WITH 1009.2 OR 1009.3. | | | | | | 20) THE TEST REPORTS FOR THE SOUND INSULATION SPECIFIED | | | ON SHEET A-9.03 FOR FBC 603.1 FLAME SPREAD - ASTM E | | | 84-09, FBC 1207.2 AIR-BORNE SOUND ASTM E 90-04, AND FBC | | | 1207.3 STRUCTURE-BORNE SOUND ASTM E 492-09 WILL HAVE TO | | | BE SUBMITTED. | | | | | | 21) THE SPECIFICATIONS, TEST REPORTS AND INSTALLATION | | | REQUIREMENTS WILL BE REQUIRED FOR THE FIRE RATED GLASS | | | ASSEMBLIES IN THE CORRIDOR WALLS OF THE COMMUNITY ROOM. | | | FBC 716.6 | | | | | | 22) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS | | | FOR THOSE PRODUCTS WHICH ARE REGULATED BY FAC | | | 61G20-3.001 PER FLORIDA STATUTE 553.842 (5) THAT HAVE | | | BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER | | | OF RECORD. PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH | | | FL OR NOA NUMBERS INCLUDING INSTALLATION INSTRUCTIONS | | | AND MAXIMUM DESIGN PRESSURES FOR EACH OF THE DIFFERENT | | | ROOFING MATERIALS, WINDOW (GLASS TYPES), STRUCTURAL | | | MULLIONS AND EXTERIOR DOOR TYPES. THESE ITEMS CAN BE | | | DEFERRED IF REQUESTED, HOWEVER, THE DOCUMENTS MUST BE | | | SUBMITTED AND APPROVED BY THE BUILDING DEPARTMENT | | | BEFORE THEY CAN BE INSTALLED. ONLY ONE SET IS REQUIRED | | | TO BE UPLOADED FOR ELECTRONICALLY SUBMITTED DOCUMENTS. | | | | | | 23) THE DESIGN PROFESSIONAL SHOULD PROVIDE A LIST OF | | | ITEMS ON THE PLANS THAT THEY WISH TO BE SUBMITTED AND | | | APPROVED AFTER THE PERMIT IS ISSUED BUT PRIOR TO THE | | | INSTALLATION OF THE PRODUCT. FBC 107.3.4.1 DEFERRED | | | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED | | | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN | | | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL | | | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING | | | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS | | | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE | | | BUILDING OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL | | | IN RESPONSIBLE CHARGE SHALL LIST THE DEFERRED | | | SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY | | | THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | | | | 24) SHOP DRAWINGS AND SUBMITTALS FROM DELEGATE | | | ENGINEERS SHALL BE REVIEWED AND APPROVED FOR DESIGN | | | COMPLIANCE BY THE DESIGNER OF RECORD FOR THE PROJECT | | | AND THE CONTRACTOR BEFORE SUBMITTING FOR REVIEW BY THE | | | BUILDING DEPARTMENT. FBC107.3.4.1 | | | | | | 25) PLEASE CLARIFY IF THE INTENT OF THE DESIGN IS FOR | | | ONE OR BOTH TIERS OF THE PARKING GARAGE TO BE OPEN OR | | | ENCLOSED. THE AMOUNT OF ALLOWABLE OPENINGS IN COMMENT | | | NUMBERS 6 AND 7 WILL HAVE AN AFFECT ON THIS | | | REQUIREMENT. THE CALCULATIONS DO NOT APPEAR TO BE | | | CORRECT. THE ENTIRE PERIMETER WALL AREA OF EACH TIER | | | AND THE TOTAL ENTIRE PERIMETER WALL LENGTH OF EACH TIER | | | ARE REQUIRED TO BE USED IN THE CALCULATIONS. THE AREA | | | OF OPENINGS IN THE INTERIOR WALLS MUST BE AT LEAST 20 | | | PERCENT OF THE AREA OF THE INTERIOR WALLS WITH THE | | | OPENINGS OPENLY DISTRIBUTED, THE STRUCTURAL BEAMS AND | | | COLUMNS ARE CONSIDERED WALL AREA. FBC 406.5 | | | | | | 26) SEPARATE PERMITS, APPLICATIONS AND FEES ARE | | | REQUIRED FOR: | | | LIGHT POLES/SITE LIGHTING | | | FIRE ALARM | | | FIRE SPRINKLER | | | LOW VOLTAGE | | | ACCESS | | | LANDSCAPING | | | IRRIGATION | | | PARKING LOT | | | ALL OTHER ITEMS OTHER THAN BMEP | | | IN ORDER TO AVOID BEING OVERCHARGED FOR PERMIT FEES | | | PROVIDE A LIST WITH THE COSTS OF THE ITEMS THAT WILL | | | REQUIRE SEPARATE PERMITS SO THEY CAN BE DEDUCTED FROM | | | THE FEES FOR THIS PERMIT. FBC 109.3 | | | | | | 27) SUBMIT A SQUARE FOOT TABULATION OF THE AREA FOR | | | EACH OF THE DIFFERENT OCCUPANCY TYPES IN THIS MIXED USE | | | BUILDING. FBC 107.2.1 & 109.3 | | | | | | 28) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A | | | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE | | | CITY RE-SUBMITTAL FORM. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2020-11-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-11-16 |
Time |
16:59 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-11-16 |
Time |
16:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2020-10-15 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-10-15 |
Time |
17:09 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-10-15 |
Time |
16:52 |
Sent To |
|
|
| Notes |
| 2020-10-15 17:11:45 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | PAGE E-4.02 | | | | | | 5) THERE IS AN 800A MAIN OFF OF THE GENERATOR THAT | | | FEEDS AN 800A TRANSFER SWITCH, WHAT DOES THE TRANSFER | | | SWITCH FEED? NOT CLEAR ON RISER. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2020-08-24 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-08-24 |
Time |
15:44 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-08-19 |
Time |
17:27 |
Sent To |
|
|
| Notes |
| 2020-08-24 10:36:12 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | | | | THE FOLLOWING SYSTEMS SHALL PER PERMITTED SEPARATELY | | | BDA, FIRE ALARM, GENERATOR, SITE LIGHTING, POOL, AND | | | LOW VOLTAGE DATA, TELEPHONE. CCTV, AND TV, IF THESE | | | SYSTEMS ARE INCLUDED WITH THE GENERAL PERMIT YOU WILL | | | BE REQUIRED TO GIVE THE CITY A BREAKDOWN OF THE COSTS | | | OF THESE SYSTEMS FOR PERMITTING PURPOSES. | | | | | | | | | | | | PAGE E-4.02 | | | | | | 1) ARC ENERGY REDUCTION SHALL BE PROVIDED PER 240.87. | | | 240.87 ARC ENERGY REDUCTION WHERE THE HIGHEST | | | CONTINUOUS CURRENT TRIP SETTING FOR WHICH THE ACTUAL | | | OVERCURRENT DEVICE INSTALLED IN A CIRCUIT BREAKER IS | | | RATED OR CAN BE ADJUSTED IS 1200 A OR HIGHER | | | | | | 2) FAULT CURRENT CALCULATION AND LABELS ARE REQUIRED BY | | | SECTIONS 110.9, 110,10, 110.24 | | | | | | 3) WIRE SIZES ARE NOT SHOWN FOR THE MAINS FROM THE | | | VAULT. | | | | | | 4) WIRE SIZES FROM THE GENERATOR TO THE ATS ARE NOT | | | SHOWN. NO CONDUCTORS ARE SHOWN ON THE LOAD SIDE OF THE | | | ATS. | | | | | | 5) RISER DOES NOT SHOW WHAT IS BEING FED BY THE ATS. | | | | | | 6) GENERATOR ROOM SHOWS YOGA AND STAIR TOWER #2 | | | | | | 7) MAIN #4 IS IT 400A OR 800A RISER SHOWS TWO DIFFERENT | | | SIZES. | | | | | | PAGE E-500 | | | | | | LEGEND GENERAL NOTES #3 WHICH SHOULD BE #4 DOES NOT | | | INCLUDE KITCHEN AND LAUNDRY AREAS FOR ARC FAULTS. | | | GENERAL ELECTRICAL NOTES #1 NEED FAULT CURRENT RATING | | | OF THE MAINS AND SUBPANELS 110.9, 110.10, AND PROVIDE | | | SIGN PER 110.24 | | | GENERAL ELECTRICAL NOTES #5 STATES CITY OF FT | | | LAUDERDALE AND 68 DB NEED TO CHECK WITH THE CITY OF WPB | | | ZONING CODE. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-08-18 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-08-18 |
Time |
09:58 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-08-14 |
Time |
10:07 |
Sent To |
|
|
| Notes |
| 2020-08-18 09:58:47 | NO ELECTRICAL PLANS FOR REVIEW JLEAHY |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2020-11-05 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2020-11-05 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2020-11-05 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-05 08:43:03 | REVIEWED AS FORMAL ENGINEERING SUBMITTAL E20080020. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2020-10-14 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2020-10-14 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2020-10-14 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-14 15:32:52 | UNDER REVIEW AS FORMAL ENGINEERING SUBMITTAL E20080020. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2020-08-19 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2020-08-19 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2020-08-19 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-08-19 17:28:30 | SUBMIT FOR FORMAL ENGINEERING REVIEW. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2020-11-06 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-11-06 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-11-06 |
Time |
15:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-10-20 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-10-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-10-20 |
Time |
09:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2020-08-26 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-08-26 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-08-26 |
Time |
09:21 |
Sent To |
|
|
| Notes |
| 2020-08-26 14:25:52 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | 1)SHEET A 2.02 & LS 1.02 - THE DOUBLE COMMUNITY ROOM | | | DOORS OPEN INTO AN EXIT CORRIDOR: | | | | | | THERE IS NO DIMENSION INDICATING COMPLIANCE WITH THE | | | RESTRICTED EGRESS WIDTH CODE: | | | | | | PER NFPA 101 CHAPTER 7, MEANS OF EGRESS | | | | | | 7.2.1.4.3 DOOR LEAF ENCROACHMENT | | | 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS | | | OF EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE | | | REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY, | | | OR A LANDING UNOBSTRUCTED AND SHALL NOT PROJECT NOT | | | MORE THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A | | | CORRIDOR, A PASSAGE WAY, OR A LANDING, WHEN FULLY OPEN, | | | UNLESS BOTH OF THE FOLLOWING CONDITIONS ARE MET: | | | (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN | | | EXISTING BUILDING. | | | (2) THE DOOR OPENING MEETS THE REQUIREMENTS THAT LIMITS | | | PROJECTION TO NOT MORE THAN 7 IN. INTO THE REQUIRED | | | WIDTH OF THE STAIR LANDING WHEN THE DOOR | | | LEAF IS FULLY OPEN. | | | | | | PLEASE REVIEW AND PROVIDE A COMPLIANT WIDTH DIMENSION. | | | | | | | | | | | | 2) SHEET A 8.00 - UNDER THE NOTE SECTION # 22 THERE IS | | | REFERENCE TO ACCESS CONTROL. | | | | | | ANY PROPOSED ACCESS CONTROL SHALL COMPLY WITH THE | | | APPLICABLE SECTION OF NFPA 101 AND BE SUBMITTED UNDER | | | SEPARATE PERMIT AND SHOP DRAWINGS. | | | | | | PLEASE REVIEW AND PROVIDE A CLOUDED NOTE OF | | | ACKNOWLEDGEMENT. | | | | | | | | | | | | 3) SHEET A 8.00 - UNDER THE NOTE SECTION # 12 THERE IS | | | REFERENCE TO NFPA 101 7.2.1.5.7. | | | | | | THIS REFERENCE DOES NOT APPEAR TO BE CORRECT: | | | | | | 7.2.1.5.7 WHERE PERMITTED IN CHAPTERS 11 THROUGH 43, | | | KEY | | | OPERATION SHALL BE PERMITTED, PROVIDED THAT THE KEY | | | CANNOT BE | | | REMOVED WHEN THE DOOR LEAF IS LOCKED FROM THE SIDE FROM | | | WHICH | | | EGRESS IS TO BE MADE. | | | | | | PLEASE REVIEW AND PROVIDE A CLOUDED CORRECTED CODE | | | REFERENCE OR REMOVE. | | | | | | | | | | | | 4) SHEET FA 1.00 & 2.00 - THERE ARE NUMEROUS | | | INDICATIONS OF PULL STATIONS AT EACH EXIT. | | | | | | IN AN EFFORT TO REDUCE FALSE ALARMS NFPA 101 ALLOWS THE | | | REDUCTION OF PULL STATIONS IN OCCUPANCIES WITH FIRE | | | SPRINKLER PROTECTION. | | | | | | NFPA 101, CH 30, NEW APARTMENT OCCUPANCIES | | | | | | 30.3.4 DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS. | | | 30.3.4.1 GENERAL. | | | 30.3.4.1.1 APARTMENT BUILDINGS FOUR OR MORE STORIES IN | | | HEIGHT OR | | | WITH MORE THAN 11 DWELLING UNITS, OTHER THAN THOSE | | | MEETING THE | | | REQUIREMENTS OF 30.3.4.1.2, SHALL BE PROVIDED WITH A | | | FIRE ALARM | | | SYSTEM IN ACCORDANCE WITH SECTION 9.6, EXCEPT AS | | | MODIFIED BY | | | 30.3.4.2 THROUGH 30.3.4.5. | | | | | | 30.3.4.2 INITIATION. | | | 30.3.4.2.1 INITIATION OF THE REQUIRED FIRE ALARM SYSTEM | | | SHALL BE BY | | | MANUAL MEANS IN ACCORDANCE WITH 9.6.2, UNLESS THE | | | BUILDING | | | COMPLIES WITH 30.3.4.2.2. | | | | | | 30.3.4.2.3 IN BUILDINGS PROTECTED THROUGHOUT BY AN | | | APPROVED, | | | SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE | | | WITH 30.3.5, | | | REQUIRED FIRE ALARM SYSTEMS SHALL BE INITIATED UPON | | | OPERATION OF | | | THE AUTOMATIC SPRINKLER SYSTEM. | | | | | | NFPA 101 CH 9, BUILDING SERVICE AND FIRE PROTECTION | | | EQUIPMENT | | | | | | 9.6.2.6* FOR FIRE ALARM SYSTEMS USING AUTOMATIC FIRE | | | DETECTION OR | | | WATERFLOW DETECTION DEVICES TO INITIATE THE FIRE ALARM | | | SYSTEM IN | | | ACCORDANCE WITH CHAPTERS 11 THROUGH 43, NOT LESS THAN | | | ONE MANUAL | | | FIRE ALARM BOX, LOCATED AS REQUIRED BY THE AUTHORITY | | | HAVING | | | JURISDICTION, SHALL BE PROVIDED TO INITIATE A FIRE | | | ALARM SIGNAL. | | | | | | 9.6.2.8 WHERE A SPRINKLER SYSTEM PROVIDES AUTOMATIC | | | DETECTION | | | AND ALARM SYSTEM INITIATION, IT SHALL BE PROVIDED WITH | | | AN APPROVED | | | ALARM INITIATION DEVICE THAT OPERATES WHEN THE FLOW OF | | | WATER IS | | | EQUAL TO OR GREATER THAN THAT FROM A SINGLE AUTOMATIC | | | SPRINKLER. | | | | | | PLEASE REVIEW AND, IF DESIRED AND AGREED BY THE EOR, | | | PROVIDE A CLOUDED NOTE OF ACKNOWLDGEMENT TO COORDINATE | | | PULL STATION LOCATIONS WITH THE OFFICE OF THE FIRE | | | MARSHAL | | | | | | | | | 5) SHEET FA 1.00 & 2.00 - THERE ARE NUMEROUS | | | INDICATIONS OF SMOKE DECTECTORS THROUGHT COMMON AREAS | | | AND CERTAIN ROOMS. | | | | | | IN AN EFFORT TO REDUCE FALSE ALARMS NFPA 101 ALLOWS FOR | | | THE REDUCTION OF SOKE DETECTION IN OCCUPANCIES WHERE | | | TOTAL DETECTION SI NOT REQUIRED. | | | | | | NFPA 101, CH 30, NEW APARTMENT OCCUPANCIES | | | | | | 30.3.4 DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS. | | | 30.3.4.1 GENERAL. | | | 30.3.4.1.1 APARTMENT BUILDINGS FOUR OR MORE STORIES IN | | | HEIGHT OR | | | WITH MORE THAN 11 DWELLING UNITS, OTHER THAN THOSE | | | MEETING THE | | | REQUIREMENTS OF 30.3.4.1.2, SHALL BE PROVIDED WITH A | | | FIRE ALARM | | | SYSTEM IN ACCORDANCE WITH SECTION 9.6, EXCEPT AS | | | MODIFIED BY | | | 30.3.4.2 THROUGH 30.3.4.5. | | | | | | 30.3.4.2 INITIATION. | | | 30.3.4.2.1 INITIATION OF THE REQUIRED FIRE ALARM SYSTEM | | | SHALL BE BY | | | MANUAL MEANS IN ACCORDANCE WITH 9.6.2, UNLESS THE | | | BUILDING | | | COMPLIES WITH 30.3.4.2.2. | | | | | | 30.3.4.2.3 IN BUILDINGS PROTECTED THROUGHOUT BY AN | | | APPROVED, | | | SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE | | | WITH 30.3.5, | | | REQUIRED FIRE ALARM SYSTEMS SHALL BE INITIATED UPON | | | OPERATION OF | | | THE AUTOMATIC SPRINKLER SYSTEM. | | | | | | NFPA 101 CH 9, BUILDING SERVICE AND FIRE PROTECTION | | | EQUIPMENT | | | | | | 9.6.2.9 WHERE A TOTAL (COMPLETE) COVERAGE SMOKE | | | DETECTION | | | SYSTEM IS REQUIRED BY ANOTHER SECTION OF THIS CODE, | | | AUTOMATIC | | | DETECTION OF SMOKE IN ACCORDANCE WITH NFPA 72, NATIONAL | | | FIRE | | | ALARM AND SIGNALING CODE, SHALL BE PROVIDED IN ALL | | | OCCUPIABLE | | | AREAS IN ENVIRONMENTS THAT ARE SUITABLE FOR PROPER | | | SMOKE DETECTOR | | | OPERATION. | | | | | | SMOKE DETECTION IS NOT SPECIFICALLY REQUIRED THROUGHT | | | THE BUILDING. | | | | | | PLEASE REVIEW AND, IF DESIRED AND AGREED BY THE EOR, | | | PROVIDE A CLOUDED NOTE OF ACKNOWLDGEMENT TO COORDINATE | | | ONLY REQUIRED SMOKE DETECTIONS LOCATIONS WITH THE | | | OFFICE OF THE FIRE MARSHAL. | | | | | | | | | 6) SHEET 2.00 - UNDER SEQUENCE OF OPERATION # 3 THERE | | | IS AN INDICATION OF DUCT DETECTION SENDING A TROUBLE | | | SIGNAL. | | | | | | PER NFPA 90A, 2015 ED. | | | | | | 6.4.3* FUNCTION. | | | 6.4.3.1 SMOKE DETECTORS PROVIDED AS REQUIRED BY 6.4.2 | | | SHALL AUTOMATICALLY STOP THEIR RESPECTIVE FAN(S) ON | | | DETECTING THE PRESENCE OF SMOKE. | | | | | | 6.4.4.2 IN ADDITION TO THE REQUIREMENTS OF 6.4.3, WHERE | | | AN APPROVED FIRE ALARM SYSTEM IS INSTALLED IN A | | | BUILDING, THE SMOKE DETECTORS REQUIRED BY THE | | | PROVISIONS OF SECTION 6.4 SHALL BE CONNECTED TO THE | | | FIRE ALARM SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS | | | OF NFPA 72, NATIONAL FIRE ALARM AND SIGNALING | | | CODE. | | | | | | 6.4.4.2.1 SMOKE DETECTORS USED SOLELY FOR CLOSING | | | DAMPERS OR FOR HEATING, VENTILATING, AND | | | AIR-CONDITIONING SYSTEM SHUTDOWN SHALL NOT BE REQUIRED | | | TO ACTIVATE THE BUILDING EVACUATION ALARM. | | | | | | PER NFPA 72, 2013 ED | | | | | | 23.8.5.4.6 SIGNAL INITIATION ? DUCT SMOKE DETECTORS. | | | 23.8.5.4.6.1 WHERE DUCT SMOKE DETECTORS ARE REQUIRED TO | | | BE MONITORED AND A BUILDING FIRE ALARM SYSTEM IS | | | INSTALLED, A DUCT DETECTOR ACTIVATION SIGNAL SHALL MEET | | | THE REQUIREMENTS OF 21.7.4. | | | 21.7.4 SMOKE DETECTORS MOUNTED IN THE AIR DUCTS OF HVAC | | | SYSTEMS SHALL INITIATE A SUPERVISORY SIGNAL. | | | 21.7.4.1 SMOKE DETECTORS MOUNTED IN THE AIR DUCTS OF | | | HVAC SYSTEMS IN A FIRE ALARM SYSTEM WITHOUT A | | | CONSTANTLY ATTENDED LOCATION OR SUPERVISING STATION | | | SHALL BE PERMITTED TO INITIATE AN ALARM SIGNAL. | | | 21.7.4.2 SMOKE DETECTORS MOUNTED IN THE AIR DUCTS OF | | | HVAC SYSTEMS SHALL BE PERMITTED TO INITIATE AN ALARM | | | SIGNAL WHERE REQUIRED BY OTHER GOVERNING LAWS, CODES, | | | OR STANDARDS. | | | | | | PLEASE REVIEW AND CORRECT WITH AN APPLICABLE CLOUDED | | | NOTE. | | | | | | | | | 7) SHEET FA 2.00 - THE FIRE ALARM SHALL BE INSTALLED | | | UNDER SEPARATE PERMIT AND SHOP DRAWINGS BY A CERTIFIED | | | FIRE ALARM CONTRCTOR. | | | | | | PLEASE REVIEW AND CORRECT WITH AN APPLICABLE CLOUDED | | | NOTE. | | | | | | | | | | | | 8) SHEET FA 2.00 - THE FIRE ALARM SYSTEM SHALL BE | | | INSTALLED UNDER SEPARATE PERMIT AND SHOP DRAWINGS BY A | | | CERTIFIED FIRE ALARM CONTRACTOR. | | | | | | PLEASE REVIEW AND CORRECT WITH AN APPLICABLE CLOUDED | | | NOTE. | | | | | | | | | 9) SHEET FP 1.00 - THE FIRE SPRINKLER SYSTEM SHALL BE | | | INSTALLED UNDER SEPARATE PERMIT AND SHOP DRAWINGS BY A | | | CERTIFIED FIRE SPRINKLER CONTRACTOR. | | | | | | PLEASE REVIEW AND CORRECT WITH AN APPLICABLE CLOUDED | | | NOTE. | | | | | | | | | 10) SHEET FP 1.00 & C 9 - THE FIRE LINE UNDERGROUND | | | SYSTEM INCLUDING THE DDCV SHALL BE INSTALLED UNDER | | | SEPARATE PERMIT AND SHOP DRAWINGS BY A CERTIFIED FIRE | | | LINE UNDERGROUND CONTRACTOR IN COMPLIANCE WITH NFPA 24. | | | | | | PLEASE REVIEW AND CORRECT WITH AN APPLICABLE CLOUDED | | | NOTE. | | | | | | | | | 11)SHEET A 0.03 - GENERAL INFO - REQUIRED RADIO | | | COMMUNICATION SYSTEM. | | | | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | 11.10.2 WHERE REQUIRED BY THE AHJ, TWO-WAY RADIO | | | COMMUNICATION | | | ENHANCEMENT SYSTEMS SHALL COMPLY WITH NFPA 72. | | | | | | NFPA 72, 24.5.2* TWO-WAY RADIO COMMUNICATIONS | | | ENHANCEMENT SYSTEMS. | | | | | | 24.5.2.2 RADIO COVERAGE. RADIO COVERAGE SHALL BE | | | PROVIDED THROUGHOUT THE BUILDING AS A PERCENTAGE OF | | | FLOOR AREA AS SPECIFIED IN 24.5.2.2.1 THROUGH | | | 24.5.2.2.3. | | | 24.5.2.2.1 CRITICAL AREAS. CRITICAL AREAS, SUCH AS THE | | | EMERGENCY COMMAND CENTER(S), THE FIRE PUMP ROOM(S), | | | EXIT STAIRS, EXIT PASSAGEWAYS, ELEVATOR LOBBIES, | | | STANDPIPE CABINETS, SPRINKLER SECTIONAL VALVE | | | LOCATIONS, AND OTHER AREAS DEEMED CRITICAL BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED WITH | | | 99 PERCENT FLOOR AREA RADIO COVERAGE. | | | 24.5.2.2.2 GENERAL BUILDING AREAS. GENERAL BUILDING | | | AREAS SHALL BE PROVIDED WITH 90 PERCENT FLOOR AREA | | | RADIO COVERAGE. | | | 24.5.2.3 SIGNAL STRENGTH. | | | 24.5.2.3.1 INBOUND. A MINIMUM INBOUND SIGNAL STRENGTH | | | OF -95 DBM, OR OTHER SIGNAL STRENGTH AS REQUIRED BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED | | | THROUGHOUT THE COVERAGE AREA. | | | 24.5.2.3.2 OUTBOUND. A MINIMUM OUTBOUND SIGNAL STRENGTH | | | OF -95 DBM AT THE DONOR SITE, OR OTHER SIGNAL STRENGTH | | | AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SHALL | | | BE PROVIDED FROM THE COVERAGE AREA. | | | | | | THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL | | | STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST | | | PALM BEACH FIRE RESCUE. TESTING SHALL BE BY AN | | | ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES | | | NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE | | | PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A | | | BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH | | | A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP. | | | | | | PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC | | | SAFETY RADIO SYSTEMS MANAGER, AS OUR RADIOS OPERATE ON | | | THEIR SYSTEM FOR DETAILED RADIO FREQUENCY AND | | | INSTALLATION INSTRUCTIONS. | | | | | | PLEASE REVIEW AND CORRECT WITH AN APPLICABLE CLOUDED | | | NOTE. | | | | | | | | | | | | 12) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | 13) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2020-12-01 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-12-01 |
Time |
11:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-11-24 |
Time |
14:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-11-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-11-17 |
Time |
18:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-11-04 |
Time |
10:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-10-24 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2020-10-24 |
Time |
18:15 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2020-10-07 |
Time |
16:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-09-08 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-08 |
Time |
10:48 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-14 |
Time |
11:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2020-11-25 |
|
|
Cont ID |
|
| Sent By |
ccarvaja |
Date |
2020-11-25 |
Time |
15:16 |
Rev Time |
0.00 |
| Received By |
ccarvaja |
Date |
2020-11-10 |
Time |
15:23 |
Sent To |
|
|
| Notes |
| 2020-11-25 15:18:23 | 11/25/2020 IMPACT FEES RECEIPT UPLOADED IN PROJECTDOX - | | | MU 2020-45657 - $286,969.85 - PAID. CC | | 2020-11-10 15:24:00 | 11/10/20 EMAILED IMPACT OFFICE FOR REVIEW. LEM |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2020-08-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-08-25 |
Time |
13:20 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-25 |
Time |
13:17 |
Sent To |
|
|
| Notes |
| 2020-08-25 13:22:45 | IMPACT FEES - DIGITAL SUBMITTALS | | | | | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | | APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO | | | YOUR PROJECT OR EMAIL IT TO [email protected] . | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-11-24 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-11-24 |
Time |
15:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2020-11-05 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-11-05 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-11-05 |
Time |
10:24 |
Sent To |
|
|
| Notes |
| 2020-11-05 10:30:17 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT-20080364 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | | EDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) DOMESTIC DRYER EXHAUST DUCT POWER VENTILATORS SHALL | | | BE LISTED AND LABELED TO UL 705 FOR USE IN DRYER | | | EXHAUST DUCT SYSTEMS. THE DRYER EXHAUST DUCT POWER | | | VENTILATOR SHALL BE INSTALLED IN ACCORDANCE WITH THE | | | MANUFACTURER?S INSTRUCTIONS. FBC M 504.5 | | | | | | 2) PLEASE PROVIDE A LETTER FROM THE DRYER MANUFACTURER | | | STATING THAT THE X VENT DRYER EXHAUST TERMINATION IS | | | ALLOWED WITH THEIR DRYER. FBC M 504.1 THE X VENT IS | | | UNIQUE IN THE FACT THAT IT USES BOTH THE BACK-DRAFT | | | DAMPER AND THE LOUVER. THE INSTALLATION MANUAL DOES NOT | | | ADDRESS THIS KIND OF INSTALLATION. WITH THE X VENT | | | SYSTEM THE BOX OF THE X VENT IS MOUNTED INTO THE | | | EXTERIOR OF THE WALL AND THE LOUVER IS FLUSH TO THE | | | EXTERIOR WALL. THE EXHAUST OF THE DRYER MUST TRAVEL | | | THROUGH THE EXHAUST DUCT, OPEN THE BACK-DRAFT DAMPER | | | AND TRAVEL THROUGH THE X VENT COVER (LOUVER) BEFORE IT | | | IS EXHAUSTED TO THE OUTDOORS. BECAUSE THIS PRODUCT USES | | | BOTH THE BACK-DRAFT DAMPER AND THE OUTER COVER OF THE | | | BOX (LOUVER) INSTEAD OF EITHER THE BACK-DRAFT DAMPER OR | | | THE LOUVER THE DRYER MANUFACTURER MUST ADDRESS THE | | | ASSEMBLY. WE MUST HAVE AN APPROVAL LETTER FROM THE | | | SPECIFIC DRYER MANUFACTURER FOR THE SPECIFIC DRYER USED | | | IN THIS PROJECT. FBC M 504.8.4.2 | | | | | | 3) PLEASE PROVIDE SPECIFICATIONS THAT SHOW THE LOUVER | | | SIZE MEETS FBC M 501.3.2. ?OPENINGS IN LOUVERS SHALL BE | | | SIZED NOT LESS THAN ?? AND NOT LARGER THAN ??. | | | | | | 4) IS THE BIRD SCREEN ADDITION AT THE BACK DRAFT DAMPER | | | FOR THE BATH EXHAUST A FACTORY ADDITION TO THE XVENT? | | | IF NOT PLEASE PROVIDE A DETAIL DRAWING SHOWING HOW THIS | | | IS INSTALLED AND DOES NOT RESTRICT THE BACK DRAFT | | | DAMPER OPERATION. FBC M 501.3.2 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | | UPDATED. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2020-10-09 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-10-09 |
Time |
15:58 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-10-08 |
Time |
14:47 |
Sent To |
|
|
| Notes |
| 2020-10-09 15:59:35 | 2ND REVIEW FBC-2017 MECHANICAL | | | PERMIT-20080364 | | | | | | CODES IN EFFECT: | | | | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) ACCORDING TO SHEET LS-1.01 THE WALLS SURROUNDING | | | FCU-F AND FCU-A1 ARE 1-HOUR RATED WALLS. PLEASE SHOW | | | THE REQUIRED FD AT EACH PENETRATION OF DUCTWORK. FBC M | | | 607.5 | | | | | | 2) PLEASE PROVIDE THE UL705 LISTING AND LABELING FOR | | | THE CLOTHES DRYER EXHAUST DUCT POWER VENTILATORS. FBC M | | | 504.5 | | | | | | 3) THE LOUVER OF THE XVENT WILL RESTRICT THE EXHAUST | | | FLOW OF THE DRYER. PLEASE PROVIDE A LETTER FROM THE | | | MANUFACTURE OF THE DRYER STATING THAT THE DRYER WILL IN | | | FACT WORK WITH THE XVENT. FBC M 504.8.4.2 | | | | | | 4) PLEASE PROVIDE SPECIFICATIONS FOR THE XVENT EXHAUST | | | TERMINATION SHOWING THEY COMPLY WITH AMCA STANDARD 550 | | | . FBC M 501.3.2 | | | | | | 5) PLEASE PROVIDE SPECIFICATIONS FOR THE XVENT EXHAUST | | | TERMINATION INDICATING THE OPENINGS AT THE TERMINATION | | | FACE MEETS THE SIZES REQUIRED IN FBC M 501.3.2 (MINIMUM | | | ?? AND NOT LARGER THAN ??) | | | | | | 6) KEYNOTE (8) REQUIRES A NON-CORROSIVE BIRD SCREEN AT | | | THE TERMINATION LOCATION FOR ALL THE BATH EXHAUST | | | DUCTS. THE INFORMATION PROVIDED ON THE XVENT WEBSITE | | | DOES NOT SHOW A BIRD SCREEN. PLEASE PROVIDE INFORMATION | | | AND INSTALLATION INSTRUCTIONS FOR THIS SCREEN. FBC | | | 107.2.1 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | | UPDATED. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2020-08-25 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-08-25 |
Time |
07:38 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-08-15 |
Time |
07:28 |
Sent To |
|
|
| Notes |
| 2020-08-25 07:39:20 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT-20080364 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET M-1.00: UNIT FCU-N WILL BE REVIEWED AT TIME OF | | | RETAIL SPACE UPFIT. FBC FS 107.2.1 | | | | | | 2) SHEET M-1.00: UNIT FCU-O WILL BE REVIEWED AT TIME OF | | | RETAIL SPACE UPFIT. FBC FS 107.2.1 | | | | | | 3) SHEET M-1.00: PLEASE PROVIDE O.A. CALCULATIONS FOR | | | THE LOADING VESTIBULE AND THE BIKE STORAGE ROOM. FBC M | | | 401.2,401.3 | | | | | | 4) SHEET M-1.00: WHAT AREA DOES FCU-A2 SERVE? I DO NOT | | | SEE ANY DUCT WORK FOR THIS UNIT. FBC FS 107.2.1 | | | | | | 5) SHEET M-1.00: PLEASE SHOW HOW YOU ARE BRINGING IN | | | O.A. TO UNIT FCU-A2. FBC FS 107.2.1 | | | | | | 6) SHEET M-1.01: PLEASE PROVIDE FIRE DAMPERS WHERE THE | | | RATED WALL IS PENETRATED BY THE MECHANICAL SYSTEM | | | DUCTS. FBC FS 107.2.1 | | | | | | 7) SHEET M-1.01: PLEASE PROVIDE VENTILATION | | | CALCULATIONS FOR THE BIKE STORAGE AND SHOW HOW YOU ARE | | | BRINGING IN O.A. TO THIS AREA AND TENANT STORAGE. FBC M | | | 401.2,401.3 | | | | | | 8) SHEET M-1.01: PLEASE SHOW HOW YOU ARE BRINGING O.A. | | | INTO FCU-A1 AND FCU-F. FBC M 401.2, 401.3 | | | | | | 9) SHEET M-1.01: PLEASE PROVIDE O.A. TO THE MAINTENANCE | | | ROOMS. FBC M 401.2, 401.3 | | | | | | 10) INDIVIDUAL UNIT PLANS: PLEASE SHOW ALL DRYER DUCTS | | | CONTINUOUS TO THE EXTERIOR TERMINATIONS. FBC FS 107.2.1 | | | | | | 11) SHEET M-2.00: PLEASE SHOW A DETAIL DRAWING OF THE | | | RETURN FROM BEDROOM IN UNIT A-1. FBC FS 107.2.1 | | | | | | 12) SHEET M-2.00: PLEASE INDICATE THE RATED DOOR FOR | | | THE MECHANICAL CLOSET FOR UNIT A-1A. FBC FS 107.2.1 | | | | | | 13) SHEET M-2.00: PLEASE SHOW A DETAIL OF THE RETURN IN | | | THE BEDROOM FOR UNIT A-1A. FBC FS 107.2.1 | | | | | | 14) SHEET M-2.00: (NOTE 10) PLEASE PROVIDE INFORMATION | | | ON THIS DRYER BOX. IT APPEARS THAT SOME ARE INSTALLED | | | INSIDE OF A RATED WALL, THE DRYER BOX WOULD NEED TO BE | | | RATED IN THIS LOCATION. FBC FS 107.2.1 | | | | | | 15) SHEET M-2.00: PLEASE CHECK THE NUMBER OF BENDS IN | | | THE DRYER DUCT FOR UNIT B-1. FBC FS 107.2.1 | | | | | | 16) SHEET M-2.02: PLEASE SHOW THE RETURN AIR PATH BACK | | | TO FCU-B THROUGH THE RATED WALL OF THE MECHANICAL ROOM. | | | FBC FS 107.2.1 | | | | | | 17) SHEET M-2.02: PLEASE PROVIDE A DETAIL OF THE AREA | | | AT THE 24X10 R>A> BOXES ARE LOCATED. FBC FS 107.2.1 | | | | | | 18) SHEET M-2.02: PLEASE PROVIDE SPECS ON SHEET M-3.01 | | | FOR TF-1 AND TF-2. FBC FS 107.2.1 | | | | | | 19) SHEET M-2.03: PLEASE CONTINUE R.A. DUCT WORK FROM | | | FCU-A1 SHOWING THE FIRE DAMPERS AT DUCTWORK PENETRATING | | | RATED WALLS. FBC FS 107.2.1 | | | | | | 20) SHEET M-2.03: PLEASE SHOW FIRE DAMPERS IN DUCTS | | | THAT PENETRATE ALL RATED WALLS. FBC FS 107.2.1 | | | | | | 21) SHEET M-2.03 PLEASE SHOW HOW YOU ARE BRINGING O.A. | | | INTO FCU-H. FBC M 401.2, 401.3 | | | | | | 22) SHEET M-2.03: PLEASE SHOW HOW YOU ARE BRINGING O.A. | | | INTO FCU-I. FBC M 401.2, 401.3 | | | | | | 23) SHEET M-3.01: ( OUTDOOR AIR CALCULATIONS) PLEASE | | | REFERENCE THE CURRENT EDITION OF THE MECHANICAL CODE. | | | 2017 FLORIDA BUILDING CODE MECHANICAL CODE | | | | | | 24) SHEET M-5.01: PLEASE SHOW HOW THE X-VENT MEETS | | | SECTION 504.4 OF FBC M FOR NO SCREENS AT THE | | | TERMINATION OF A DRYER DUCT. | | | | | | 25) SHEET M-5.01: PLEASE INDICATE ON THE UNIT DRAWINGS | | | WHEN THE TOILET EXHAUST MULTIPLE CONNECTION IS USED. | | | FBC FS 107.2.1 | | | | | | 26) SHEETS M-1.02- M-1.07: PLEASE CHECK THE CORRIDOR | | | CFMS. MY NUMBERS ARE: 3RD FLOOR= 90 CFM; 4TH ? 8TH EACH | | | HAS 1010 CFM?S. DRAWINGS INDICATE: NO INDICATION FOR | | | 3RD FLOOR; 4TH -8TH DRAWINGS INDICATE 1370 CFM?S. FBC | | | FS 107.2.1 | | | | | | 27) SHEET M-2.02: PLEASE SHOW DETAIL OF 8? O/A DUCT FOR | | | FCU-A2 MECHANICAL CLOSET. NOTE INDICATES ITS ON SHEET | | | M- 2.03. IT DOES NOT APPEAR TO BE ON THAT SHEET. FBC FS | | | 107.2.1 | | | | | | 28) SHEET M-2.02: PLEASE SHOW WHERE BATH EXHAUST | | | TERMINATES FOR MALE AND FEMALE BATHROOMS BY THE MAIL | | | ROOM. IDENTIFY WHICH EXHAUST FAN IS BEING USED. TEF-1 | | | HAS A TOTAL OF 300CFM. THE BATHROOMS IN THE GYM | | | INDICATE THIS IS THE EXHAUST FAN BEING USED. PLEASE | | | VERIFY THIS. FBC FS 107.2.1 | | | | | | 29) SHEET M-4.01: THE CORRIDOR SUPPLY RISER NUMBERS DO | | | NOT MATCH CFM?S ON SHEETS M-1.02- M-1.07, PLEASE BE | | | CONSISTENT. FBC FS 107.2.1 | | | | | | 30) SHEET M-5.03: THE RUSKIN LOUVER DETAIL DOES NOT | | | INDICATE THE SIZE OF THIS LOUVER, PLEASE COMPLETE THE | | | SIZE OF THIS LOUVER. FBC FS 107.2.1 | | | | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | | UPDATED. | | | | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
jesmith |
Date |
2020-11-24 |
Time |
18:39 |
Rev Time |
0.00 |
| Received By |
jesmith |
Date |
2020-11-24 |
Time |
18:38 |
Sent To |
|
|
| Notes |
| 2020-11-24 18:38:32 | PLUMBING COMMENTS: APPROVED | | | | | | ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD | | | INSPECTOR'S APPROVAL | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | | | | 20080364 991 BANYAN BLVD | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2020-11-09 |
|
|
Cont ID |
|
| Sent By |
jesmith |
Date |
2020-11-09 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
jesmith |
Date |
2020-11-05 |
Time |
15:05 |
Sent To |
|
|
| Notes |
| 2020-11-09 11:46:35 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL | | | MANUAL REVISED 2017 | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION | | | FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION | | | FAC= FLORIDA ADMINISTRATIVE CODE | | | FS = FLORIDA STATUTES | | | | | | 20080364 991 BANYAN BLVD | | | | | | NOTE: A SEPARATE PERMIT AND REVIEW IS REQUIRED FOR THE | | | IRRIGATION. | | | | | | 3RD REVIEW | | | PLUMBING COMMENTS: DENIED | | | | | | 1) OK | | | 2) OK | | | 3) PARTIALLY COMPLIED THE CORRECT DRAWING IS P-4.01. | | | THE MEP RESPONSE NARRATIVE REFERS TO SHT. P-4.00. THERE | | | IS NO SUCH DRAWING IN THE PLANS. IT APPEARS TO HAVE | | | BEEN CHANGED TO P4.01. CLARIIFY. | | | | | | NEW COMMENT P-3.07 WATER DISTRIBUTION SHOWS DOMESTIC | | | BOOSTER PUMP AND REFERS TO P-4.01 FOR PUMP SPECS. | | | P-4.01 SHOWS DETAIL WITH A FRONT AND SIDE VIEW OF | | | BOOSTER PUMP BUT NO SCHEDULE/MANUFACTURER'S | | | SPECIFICATIONS. PER WPB FBC 107.2.1, PROVIDE A | | | SCHEDULE/SPECIFICATION. SPECIFY MANUFACTURER, MODEL, | | | GPM, OPERATING PRESSURE, TDH, PUMP MOTOR ELECTRICAL | | | CHARACTERISTICS, MOTOR CONTROLLER AND ANY OTHER ITEMS | | | REQUIRED TO PROVIDE A FULLY OPERATIONAL PUMP SYSTEM. | | | ALSO SEE COMMENT 39 BELOW. | | | | | | 4) OK | | | 5) OK. THE RESPONSE NARRATIVE FOR PLAN REVIEW COMMENT | | | #13 REFERS TO ELEVATIONS #13 & #14 ON SHT. A-5.05. | | | THERE ARE NO SUCH ELEVATIONS ON THIS SHEET. CLARIFY. | | | | | | NEW COMMENT: A-5.05/ACCESSIBLE BATHROOM FIXTURE | | | LEGEND-P3; CENTER LINE OF WATER CLOSET SHALL BE MIN 16 | | | INCHES/MAX 18 INCHES FROM SIDE WALL, SPACE FROM | | | SIDEWALL TO BEGINNING OF HAND RAIL SHALL BE 6 INCHES | | | MAXIMUM. | | | | | | 6) OK | | | 7) OK | | | 8) OK | | | 9) OK | | | 10) OK | | | 11) OK | | | 12) OK | | | 13) OK. SHT. A-8.00A - COMMON AREAS FINISH SCHEDULE - | | | SHOWS THE WALLS IN THE 3RD FLOOR RESTROOMS TO BE GYPSUM | | | BOARD WITH WALLPAPER FINISH. WALLS AND PARTITIONS | | | WITHIN TWO FEET OF WATER CLOSETS SHALL HAVE A SMOOTH, | | | HARD, NONABSORBENT SURFACE, TO A HEIGHT OF NOT LESS | | | THAN 4 FEET ABOVE THE FLOOR AND THE MATERIALS USED IN | | | SUCH WALLS SHALL BE OF A TYPE THAT IS NOT ADVERSELY | | | AFFECTED BY MOISTURE. EPOXY PAINT DOES NOT MEET THIS | | | REQUIREMENT.FBC-BUILDING SEC. 1210.2.2. | | | FOR CLARIFICATION DETAIL P12/A-5.05 SHOWS HEIGHT OF | | | TILE WALL, NOT DETAIL P4. | | | | | | NEW COMMENT: WALL FINISH IN JANITOR'S CLOSET IS EXPOSED | | | CONCRETE/ CMU BLOCK. PER FBC 1210.2.2, PROVIDE A | | | NONABSORBANT FINISH AS CONCRETE IS POUROUS. | | | | | | 14) OK | | | 15) OK | | | 16) SECOND REQUEST: SHT. P-1.00 - SHOW THE CONTINUATION | | | POINT/ ORIGINATION POINT OF THE FUTURE 1 1/4 INCH | | | CONDENSATE DRAIN STUB OUT AT THE FUTURE RETAIL SPACE. | | | THERE IS ANOTHER LINE NEXT TO THIS CONDENSATE LINE THAT | | | IS NOT IDENTIFIED OR SHOWS A PIPE SIZE. REFER TO COLUMN | | | LINES A-B/3-4. | | | TO BE CLEAR, WHAT IS THE CAPPED LINE ADJACENT TO THE | | | CONDENSATE DRAIN AT GRID LINE 3 BETWEEN A / B AND WHERE | | | DOES IT CONTINUE TO? | | | 17) OK | | | 18) SECOND REQUEST: SHT. P-1.00 - SHOW THE CONTINUATION | | | POINT OF THE 10 INCH STORM DRAIN AND THE 1 1/4 INCH | | | CONDENSATE LINE AT GRID LINE D-E/15. | | | TO BE CLEAR, DO THE CIVIL DRAWINGS ADDRESS THIS AND | | | DOES THE CONDENSATE TERMINATE TO DRYWELL OR CONNECT TO | | | THE STORM. PROVIDE GUIDANCE AND DETAIL; INCLUDE | | | REFERENCE TO CIVIL DRAWINGS. | | | 19) SECOND REQUEST: SHT.P-1.00- SIZE THE STORM, | | | SANITARY, WATER LINES ON THE PLANS. PIPE SIZES ARE | | | MISSING IN QUITE A FEW AREAS. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | PLEASE NOTE, SIZES OF WATER DISTRIBUTION BRANCHES TO | | | RETAIL, RESTROOMS, BREAK ROOM AND JANITOR'S CLOSET ARE | | | AMONG SIZES MISSING. IT IS NOTED THAT THESE BRANCHES | | | ARE SIZED ON NEW P-3.07, DOMESTIC WATER PIPING | | | DISTRIBUTION DIAGRAM. PER WPB FBC 107.2.1, PROVIDE THE | | | SIZING OF THE WATER BRANCHES AND ANY OTHER PIPING THAT | | | IS NOT SIZED. | | | 20) OK | | | 21) OK | | | 22) OK | | | 23) OK | | | 24) OK | | | 25) OK | | | 26) OK | | | 27) OK | | | 28) OK | | | 29) OK | | | 30) OK | | | 31) OK | | | 32) SECOND REQUEST: SHT.P-3.04 ? PLACE THE SLOPE OF THE | | | HORIZONTAL STORM DRAIN PIPING ON THE PLAN. COMPLY WITH | | | FBC-PLUMBING ABLE 1106.2. TO BE CLEAR, SLOPE SHALL BE | | | IN ACCORDANCE WITH FBC PL TABLE 1106.2 FOR HORIZONTAL | | | STORM DRAINS, NOT AS REQUIRED IN FBC PL CHAPTER 7 FOR | | | HORIZONTAL SANITARY DRAINS. | | | 33) SHT. P-3.06 - SIZE ALL SECTIONS OF THE SANITARY | | | COLLECTION SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1. OK | | | | | | NEW COMMENT: PER WPB FBC 107.2.1, PROVIDE NOTE ON PLAN | | | SHEET P-1.00 AND P-3.06 AT CLEAN OUT AT GRID LINES | | | A/4-5 TO REFER TO CIVIL DRAWINGS SIMILAR TO NOTE | | | PROVIDED AT GRIDLINES A/10. | | | | | | 34) SECOND REQUEST: SHT. P-4.01-FIXTURE CONNECTION | | | SCHEDULE NOTE #1 REFERS TO MIAMI-DADE CODE SECTION | | | 8-31. DELETE THIS REFERENCE FROM THE NOTE. | | | 35) OK | | | 36) OK | | | 37) OK | | | 38) THE SUBMETERS SHALL BE NON COMBUSTIBLE IF LOCATED | | | IN A RETURN AIR CLOSET AS IT APPEARS THEY ARE. THE | | | SUBMITTED SPECS FOR THE METER DOES NOT SHOW THIS. THESE | | | METERS ARE COMPOSED OF A POLYMER MATERIAL. RAPPING THE | | | SUBMETERS WITH A FIRE WRAP IS NOT AN OPTION. NOTE HAS | | | BEEN ADDED BY ENGINEER TO REQUIRE UNIT TO BE NON | | | COMBUSTIBLE; HOWEVER PER WPB FBC 107.2.1, A SCHEDULE | | | AND MANUFACTURER'S SPECIFICATION FOR A NON COMBUSTIBLE | | | UNIT SHALL BE PROVIDED. | | | 39) SECOND REQUEST: ALSO SEE NEW COMMENT ADDED AT | | | COMMENT 3 ABOVE. SUBMIT ADDITIONAL INFORMATION/DETAILS | | | ON THE BOOSTER PUMP. THE DETAIL ON SHT. P-4.01 IS VERY | | | MINIMAL. WPB AMEND. TO FBC SEC. 107.2.1. | | | TO BE CLEAR, P-3.07 WATER DISTRIBUTION SHOWS DOMESTIC | | | BOOSTER PUMP AND REFERS TO P-4.01 FOR PUMP SPECS. | | | P-4.01 SHOWS DETAIL WITH A FRONT AND SIDE VIEW OF | | | BOOSTER PUMP BUT NO SCHEDULE/MANUFACTURER'S | | | SPECIFICATIONS. PER WPB FBC 107.2.1, PROVIDE A | | | SCHEDULE/SPECIFICATION. SPECIFY MANUFACTURER, MODEL, | | | GPM, OPERATING PRESSURE, TDH, PUMP MOTOR ELECTRICAL | | | CHARACTERISTICS, MOTOR CONTROLLER AND ANY OTHER ITEMS | | | REQUIRED TO PROVIDE A FULLY OPERATIONAL PUMP SYSTEM. | | | 40) OK | | | | | | NEW COMMENT: | | | PER WPB FBC 107.2.1, PROVIDE ON P-1.00, P-1.02 AND | | | P-3.07, WATER CONNECTIONS TO IRRIGATION. COORDINATE | | | WITH IP-101 AND IP-102. INDICATE ON THE PLANS THE | | | REQUIRED BACKFLOW PREVENTION DEVICES OR PROVIDE | | | NOTATION WHERE BACKFLOW PREVENTION DEVICES ARE PROVIDED | | | BY THE LANDSCAPE/IRRIGATION DRAWINGS. ADDITIONALLY, | | | CIVIL DRAWING C-9 SHALL COORDINATE AS THERE APPEARS TO | | | BE A METER ON IP-101. | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | ALL PLANS TO BE DIGITALLY SIGNED AND SEALED BY THE | | | DESIGNER IN ACCORDANCE WITH FAC AND FS. | | | | | | | | | | | | JERALD SMITH | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | EMAIL [email protected] | | | PHONE 561-246-0882 MOBILE | | | | | | 20080364 991 BANYAN BLVD |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2020-10-24 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-10-24 |
Time |
07:30 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-10-15 |
Time |
05:26 |
Sent To |
|
|
| Notes |
| 2020-10-23 11:00:24 | 1) THE DESIGN PROFESSIONAL IS REQUIRED TO DESIGNATE TO | | | WHICH DESIGN SPECIFICATION ( A OR B) OF THE FAIR | | | HOUSING ACT THE UNIT BATHROOMS WERE DESIGNED. IF | | | SPECIFICATION A IS SELECTED AS THE BASIS FOR DESIGNING | | | A BATHROOM, ALL BATHROOMS IN THE DWELLING UNIT ALSO | | | MUST COMPLY WITH THE A SPECIFICATION. IF SPECIFICATION | | | B IS SELECTED, ONLY ONE BATHROOM IN THE DWELLING UNIT | | | MUST MEET THOSE REQUIREMENTS. I COULD NOT FIND THIS | | | INFORMATION ANYWHERE ON THE ARCHITECTURAL OR PLUMBING | | | SHEETS. 2ND REQUEST. | | | 2) INDICATE ON THE PLANS WHICH DESIGN STANDARD IS BEING | | | USED FOR FAIR HOUSING ACT DESIGN COMPLIANCE. SHT. | | | A-6.09 REFERS TO THE FAIR HOUSING ACT DESIGN MANUAL | | | 1998 BUT SHTS. A-6.10 AND A-8.00B REFER TO THE 1991 | | | FAIR HOUSING ACCESSIBILITY GUIDELINES. WHICH IS IT? | | | CLARIFY. | | | 3) THE MEP RESPONSE NARRATIVE REFERS TO SHT. P-4.00. | | | THERE IS NO SUCH DRAWING IN THE PLANS. IT APPEARS TO | | | HAVE BEEN CHANGED TO P4.01. CLARIIFY. | | | 4) THE RESPONSE NARRATIVE PLAN REVIEW COMMENT #11 | | | REFERS TO DETAIL #3 FOR SINK/COUNTER ELEVATION FOR SINK | | | AT THE POOL DECK. THERE IS NO DETAIL #3 ON SHT. A-5.07. | | | CLARIFY. | | | 5) THE RESPONSE NARRATIVE FOR PLAN REVIEW COMMENT #13 | | | REFERS TO ELEVATIONS #13 & #14 ON SHT. A-5.05. THERE | | | ARE NO SUCH ELEVVATIONS ON THIS SHEET. CLARIFY. | | | 6) SHT. A-2.00 - CLARIFY HOW PEOPLE IN THE GYM WILL | | | HAVE UNRESTRICTED ACESS TO DRINKING FOUNTAINS IN THE | | | YOGA AREA IN THE EVENT OF YOGA CLASSES. | | | 7)SHT.A-5.03 - DETAIL #4 - THERE SHALL BE A MINIMUM | | | REQUIRED DEPTH OF 8 INCHES FOR KNEE CLEARANCE UNDER THE | | | SINK AT 27 INCHES ABOVE THE FINISH FLOOR. ANSI | | | A117.1-1986. | | | 8) SHT. A-5.04 - DETAILS #1 & #3 - LAVATORIES SHALL BE | | | MOUNTED WITH A CLEARANCE OF AT LEAST 29 INCHES FROM THE | | | FLOOR TO THE BOTTOM OF OF THE APRON PER ANSI | | | A117.1-1986 . KNEE AND TOE CLEARANCES SHALL COMPLY WITH | | | FIGURE 31 OF THE STANDARD. | | | 9) SHT. A-5.04 - DETAILS #2 & #3 - THE GRAB BARS ARE | | | STILLL SHOWING THE MEASUREMENT TO THE CENTERLINE OF THE | | | BAR AND NOT TO THE TOP OF THE GRIPPING SURFACE. | | | CLARIFY.. | | | 10) SHT. A-5.05 - DETAILS #1, 2,3,4,5,8,9,10,11, &12 - | | | THE GRAB BARS ARE ALL SHOWN MESURED TO THE CENTERLINE | | | OF THE BAR AND NOT TO THE TOP OF THE GRIPPING SURFACE. | | | CLARIFY. | | | 11) SHT. A-5.06 - DETAIL #8 - THERE SHALL BE A MINIMUM | | | REQUIRED DEPTH OF 8 INCHES FOR KNEE CLEARANCE UNDER THE | | | SINK AT 27 INCHES ABOVE THE FINISH FLOOR. ANSI | | | A117.1-1986. | | | 12) SHT. A-6.04 - DETAIL C - SHOW THE REQUIRED 30 | | | INCHES WIDE BY 48 INCHES DEEP CLEAR FLOOR SPACE OUTSIDE | | | THE SWING OF THE DOOR PERR THE FAIR HOUSING ACT | | | GUIDELINES/ DESIGN MANUAL. | | | 13) SHT. A-8.00A - COMMON AREAS FINISH SCHEDULE - SHOWS | | | THE WALLS IN THE 3RD FLOOR RESTROOMS TO BE GYPSUM BOARD | | | WITH WALL PAPER FINISH.WALLS AND PARTITIONS WITHIN TWO | | | FEET OF WATER CLOSETS SHALL HAVE A SMOOTH, HARD, | | | NONABSORBENT SURFACE, TO A HEIGHT OF NOT LES THAN 4 | | | FEET ABOVE THE FLOOR AND THE MATERIALS USED IN SUCH | | | WALLS SHALLL BE OF A TYPE THAT IS NOT ADVERSELY | | | AFFECTED BY MOISTURE. EPOXY PAINT DOES NOT MEET THIS | | | REQUIREMENT.FBC-BUILDING SEC. 1210.2.2. | | | 14) - SHT. A-9.02 - DETAIL #9 REFERS TO DETAIL | | | #12/A-9.02 - THERE IS NO DETAIL #12 ON THIS SHEET. | | | CLARIFY. | | | 15) PLACE A NOTE ON THE PLANS THAT THE WASHING MACHINE | | | SHUTOFF VALVES ARE ACCESSIBLE THROUGH A REMOVABLE PANEL | | | ON THE WASHER/DRYER APPLIANCE . FBC-PLUMBING SEC. | | | P606.3. | | | 16) SHT. P-1.00 - SHOW THE CONTINUATION POINT/ | | | ORIGINATION POINT OF THE FUTURE 1 1/4 INCH CONDENSATE | | | DRAIN STUB OUT AT THE FUTURE RETAIL SPACE. THERE IS | | | ANOTHER LINE NEXT TO THIS CONDENSATE LIINE THAT IS NOT | | | IDENTIFIED OR SHOWS A PIPE SIZE. REFER TO COLUMN LINES | | | A-B/3-4. | | | 17) SHT. P-1.00 - SHOW THE ONTINUATION POINT/ | | | ORIGINATION POINT OF THE 3 INCH CONDENSATE LINE | | | DISCHARGING TO THE MANHOLE LOCATED AT COLUMN G//2-3.. | | | 18) SHT. P-1.00 - SHOW THE CONTINUATION POINT OF THE 10 | | | INCH STORM DRAIN AND THE 1 1/4 INCH CONDENSATE LINE AT | | | GRID LINE D-E/15. | | | 19) SHT.P-1.00- SIZE THE STORM, SANITARY, WATER LINES | | | ON THE PLANS. PIPE SIZES ARE MISSING IN QUITE A FEW | | | AREAS. WPB AMEND. TO FBC SEC. 107.2.1. | | | 20) SHT. P-1.01 - THERE ARE SANITARY RISER TAGS LOCATED | | | AT COLUMNS D/2 WITH NO RISERS IDENTIED OR LOCATION | | | ARROWS. REFER TO RISERS S/2, S/4, &S/6. CLARIFY. | | | 21) SHT. P-1.01 - THERE ARE RAINWATER AND OVERFLOW | | | DRAIN RISER TAGS AT COLUMN LINES D/3-4 WITH NO RISERS | | | SHOWN AND NO LOCATION ARROWS.ALSO, REFER TO COLUMN LINE | | | C-D/5-6, C-D/9-10, C-D/7-8 FOR THE SAME ISSUE. CLARIFY. | | | 22) SHT. P-1.04 - THERE IS A RISER TAG OF RWL/5 LOCATED | | | IN THE CORRIDOR AT COLUMNS D/7-8 BUT NO RISER IS SHOWN. | | | THIS ALSO OCCURS IN UNIT C-2 IN THE HALL FOR RISER | | | ODL/2. THE RWL/5 ISSUE ALSO OCCURS ON SHT.P-1.06. | | | CLARIFY. | | | 23) P2.00 - UNIT B-1A - THERE IS A RISER TAG S/1C SHOWN | | | AT THE STOVE AND THERE IS NO RISER. CLARIFY. | | | 24) SHT.P-1.03 - RISER TAGS ODL/3, RWL/3, S/2, ARE | | | SHOWN IN THE CORRIDOR BUT THERE ARE NO CORRELATING | | | RISERS SHOWN. CLARIFY. | | | 25) SHT. P-1.04 - RISER TAG RWL/5 IS SHOWN IN THE | | | CORRIDOR BUT THERE IS NO CORRELATING RISER SHOWN. | | | CLARIFY. | | | 26) SHT. P-1.05 - UNIT C-1A ACC. - RISER TAG RWL/1 IS | | | SHOWN IN CORRIDOR BUT THERE IS NO CORRELATING RISER. | | | CLARIFY. | | | 27) SHT.P-1.07 - THERE IS A RISER TAG OF RWL/5 LOCATED | | | IN THE CORRIDOR AT COLUMNS D/7-8 BUT NO RISER IS SHOWN. | | | CLARIFY. | | | 28) SHT.P-3.01 - UNIT B-1 - A SHUTOFF VALVE IS REQUIRED | | | ON THE WATEER SUPPLY TO THE UNIT PER FBC-PLUMBING | | | SEC.606.1.6. | | | 29) SHT. P-3.01- UNIT B-1A - A SHUTOFF VALVE IS | | | REQUIRED ON THE WATEER SUPPLY TO THE UNIT PER | | | FBC-PLUMBING SEC.606.1.6. | | | 30) SHT.P-3.02 - IDENTIFY THE PARTIAL GROUND FLOOR | | | SANITARY PLAN AS THE OFFICE/ LOBBY AREA TO CORRELATE | | | WITH SHT. P-2.02. WPB AMEND. O FBC SEC. 107.2.1. | | | 31) SHT. P-3.02 - THE BACKFLOW PREVENTION DEVICE AT THE | | | POOL COLLECTOR TANK SHALL BE A REDUCED PRESSURE ZONE | | | VALVE AND BE LEAD FREE. THE UNIT YOU HAVE SPECIFIED ON | | | THE DRAWING IS A DOUBLE CHECK ASSEMBLY AND IS | | | UNACCEPTABLE.FBC-PLUMBING TABLE 608.1.THE DEVICE SHALL | | | COMPLY WITH ASSE 1013. | | | 32) SHT.P-3.04 - PLACE THE SLOPE OF THE HORIZONTAL | | | STORM DRAIN PIPING ON THE PLAN. COMPLY WITH | | | FBC-PLUMBING ABLE 1106.2. | | | 33) SHT. P-3.06 - SIZE ALL SECTIONS OF THE SANITARY | | | COLLECTION SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1. | | | 34) SHT. P-4.01 - FIXTURE CONNECTION SCHEDULE NOTE #1 | | | REFERS TO MIAMI-DADE CODE SECTION 8-31. DELETE THIS | | | REFERENCE FROM THE NOTE. | | | 35) SHT. P-4.01- WATER HEATER DETAIL - SHOW THE SIZE OF | | | THE EXPANSION TANK ON THE PLAN. | | | 36) SHT. P-4.01- TRASH CHUTE DETAIL- THE BACKFLOW | | | DEVICE MUST BE LEAD FREE AND SHALL BE RELOCATED | | | UPSTREAM OF THE SANITATION UNIT. AS PRESENTLY LOCATED, | | | IT DOES NOT PROTECT THE BUILDING'S WATER SYSTEM. | | | 37) SUBMIT A COMPLETE WATER RISER FOR THE BUILDING. WPB | | | AMEND. TO FBC SEC. 107.3.5.1.3. | | | 38) THE SUBMETERS SHALL BE NON COMBUSTIBLE IF LOCATED | | | IN A RETURN AIR CLOSET AS IT APPEARS THEY ARE. THE | | | SUBMITTED SPECS FOR THE METER DOES NOT SHOW THIS. HESE | | | METERS ARE COMPOSED OF A POLYMER MATERIAL. RAPPING THE | | | SUBMETERS WITH A FIRE WRAP IS NOT AN OPTION. | | | 39) SUBMIT ADDITIONAL INFORMATION/DETAILS ON THE | | | BOOSTER PUMP. THE DETAIL ON SHT. P-4.01 IS VERY | | | MINIMAL. WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST. | | | 40) THE BACKFLOW PREVENTER FOR THE REFRIGERATOR DOES | | | NOT COMPLY WITH THE ASSE 1022 STANDARD. ALL BACKFLOWS | | | SHALL BE LEAD FREE. FBC-PLUMBING SEC.605.21. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-08-25 |
|
|
Cont ID |
|
| Sent By |
abelisle |
Date |
2020-08-25 |
Time |
17:38 |
Rev Time |
0.00 |
| Received By |
abelisle |
Date |
2020-08-18 |
Time |
18:06 |
Sent To |
I |
|
| Notes |
| 2020-08-25 17:38:42 | 1ST REVIEW FBC-2017 PLUMBING | | | PERMIT-20080364 | | | 8/25/2020 | | | | | | CODES IN EFFECT: | | | | | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1. SEPERATE SUB PERMIT REQUIRED FOR PLUMBING, | | | IRRIGATION, BACKFLOWS, | | | | | | 2. PROVIDE MORE DETAILED INFORMATION ON THE BOOSTER | | | PUMP SYSTEM THAT WILL BE INSTALLED ON PAGE P-4.00. | | | | | | 3. RPZ BACKFLOW REQUIRED FOR 1" POOL COLLECTOR WATER | | | SUPPLY LINE ON PAGE P-3.02. | | | | | | 4. ASSE 1022 BACKFLOW PREVENTER REQUIRED FOR WATER LINE | | | AT REFRIDGERATOR LOCATED IN THE BREAK ROOM | | | | | | 5. PROVIDE DETAIL ON THE PLANTER DRAINS | | | | | | 6. CLEARLY INDICATE THE DESIGN SPEC FOR EACH BATHROOM | | | PER FAIR HOUSING GUIDLINES. | | | | | | 7. PROVIDE A DETAIL FOR THE ADA SHOWER PANS THAT WILL | | | BE INSTALLED IN THE ADA UNITS | | | | | | 8. THE WASHING MACHINE VALVES SHALL BE ACCESSIBLE | | | WITHOUT MOVING THE UNIT PER THE 2017 FBC SEC. P 606.3. | | | ACCESSIBLE SIGNIFIES ACCESS THAT REQUIRES THE REMOVAL | | | OF AN ACCESS PANEL OR SIMILAR REMOVABLE OBSTRUCTION. | | | | | | 9. THE GRAB BARS SHOWN ON PAGE A-5.04 SHALL BE 33"-36" | | | MEASURED TO THE TOP OF THE GRIPPING SURFACE FOR THE | | | FINISHED FLOOR. | | | | | | 10. SUBMIT MANUFACTURE INFORMATION ON THE POOL DECK | | | SHOWER. | | | | | | 11. PROVIDE MORE DETAILS AND ELEVATIONS FOR THE SINK | | | AND COUNTER LOCATED ON THE POOL DECK 3RD FLOOR AREA. | | | | | | 12. PROVIDE MORE DETAILS AND ELEVATIONS FOR THE SINK | | | AND COUNTER LOCATED ON THE 3RD FLOOR IN THE COMMUNITY | | | ROOM. | | | | | | 13. PROVIDE MORE DETAILS AND ELEVATIONS FOR THE MENS | | | AND WOMENS RESTROOM ON THE 3RD FLOOR LOCATED IN THE | | | COMMUNITY ROOM. | | | | | | 14. PROVIDE MANUFACTURE INFORMATION ON THE TYPE OF | | | BACKFLOW PRENTOR THAT WILL BE USED FOR THE TRASH CHUTE | | | ON PAGE P-4.01. | | | | | | 15. PROVIDE MANUFACTURE SPECIFICATIONS ON THE TYPE OF | | | SUB WATER METERS THAT WILL BE INSTALLED. | | | | | | 16. ON PLAN PAGE P-4.01 NOTE #3 SHALL READ LAVATORIES | | | AND SINKS HOT WATER SUPPLY SHALL BE PROTECTED BY MEANS | | | OF A ASSE 1070 CERTIFIED TEMPERING VALVE. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | ATELYO BELISLE | | | PLUMBING INSPECTOR / | | | PLUMBING PLAN REVIEW | | | AVAILABLE FROM 1:00 PM TO 4:00 PM | | | [email protected] | | | 561-805-6695 | | | |
|
|
| Review Stop |
P-IRRIGATE |
IRRIGATION REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
jesmith |
Date |
2020-11-24 |
Time |
18:37 |
Rev Time |
0.00 |
| Received By |
jesmith |
Date |
2020-11-24 |
Time |
18:31 |
Sent To |
|
|
| Notes |
| 2020-11-24 18:37:00 | IRRIGATION COMMENTS: APPROVED | | | | | | ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD | | | INSPECTOR'S APPROVAL | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | A SEPARATE PERMIT IS REQUIRED FOR THE IRRIGATION | | | | | | 20080364 991 BANYAN BLVD | | | |
|
|
| Review Stop |
P-IRRIGATE |
IRRIGATION REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2020-11-09 |
|
|
Cont ID |
|
| Sent By |
jesmith |
Date |
2020-11-09 |
Time |
16:39 |
Rev Time |
0.00 |
| Received By |
jesmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-09 16:38:53 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL | | | MANUAL REVISED 2017 | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION | | | FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION | | | FAC= FLORIDA ADMINISTRATIVE CODE | | | FS = FLORIDA STATUTES | | | | | | 20080364 991 BANYAN BLVD | | | | | | A SEPARATE PERMIT IS REQUIRED FOR THE BACKFLOW | | | PREVENTOR. CALL 561-805-6692 FOR CLARIFICATION | | | A SEPARATE PERMIT IS REQUIRED FOR THE IRRIGATION | | | | | | 1ST REVIEW | | | IRRIGATION COMMENTS: DENIED | | | | | | 1.IS SYMBOL M A METER? PER WPB FBC 107.2.1, CLARIFY. | | | PROVIDE DESCRIPTION FOR SYMBOL M ON IP-101. | | | 2.PER WPB FBC 107.2.1, PROVIDE DETAIL FOR SYMBOL BF | | | REDUCED PRESSURE BACKFLOW PREVENTER | | | 3. PER WPB FBC 107.2.1, PROVIDE NOTE "HEADS SHALL BE NO | | | CLOSER THAN 1 FOOT TO BUILDING EXTERIOR WALL" | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | ALL PLANS TO BE DIGITALLY SIGNED AND SEALED BY THE | | | DESIGNER IN ACCORDANCE WITH FAC AND FS. | | | | | | | | | | | | JERALD SMITH | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | EMAIL [email protected] | | | PHONE 561-246-0882 MOBILE | | | | | | 20080364 991 BANYAN BLVD | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
3 |
Status |
P |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
rgathrig |
Date |
2020-11-24 |
Time |
14:19 |
Rev Time |
0.00 |
| Received By |
rgathrig |
Date |
2020-11-24 |
Time |
14:16 |
Sent To |
|
|
| Notes |
| 2020-11-24 14:18:58 | PACIFICA ENGINEERING PRIVATE PROVIDER FIRM, WESLEY | | | FOSTER PRIVATE PROVIDER, OK FOR INSPECTIONS ONLY | | | | | | RICHARD GATHRIGHT | | | ASSISTANT BUILDING OFFICIAL |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
2 |
Status |
F |
Date |
2020-11-23 |
|
|
Cont ID |
|
| Sent By |
rgathrig |
Date |
2020-11-23 |
Time |
17:35 |
Rev Time |
0.00 |
| Received By |
rgathrig |
Date |
2020-11-23 |
Time |
17:35 |
Sent To |
|
|
| Notes |
| 2020-11-23 17:38:17 | PRIVATE PROVIDER REVIEW FOR INSPECTIONS IS FAILED | | | | | | | | | NOTICE TO BUILDING OFFICIAL NAMES PACIFICA ENGINEERING | | | SERVICES AND WESLEY FOSTER P.E. AS THE PRIVATE | | | PROVIDER. | | | | | | THE CERTIFICATE OF INSURANCE DOES NOT STATE THAT | | | PROFESSIONAL LIABILITY INSURANCE COVERAGE IS IN PLACE | | | FOR THE PRIVATE PROVIDER?S FIRM, THE PRIVATE PROVIDER, | | | AND ANY DULY AUTHORIZED REPRESENTATIVE IN THE AMOUNTS | | | REQUIRED BY 553.791. ( FOUND IN 553.791 (4) ) | | | | | | RICHARD GATHRIGHT | | | ASSISTANT BUILDING OFFICIAL | | | 561-805-6679 | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
F |
Date |
2020-10-29 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-10-29 |
Time |
17:16 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-10-29 |
Time |
17:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2020-10-15 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-10-15 |
Time |
07:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-10-15 |
Time |
07:48 |
Sent To |
|
|
| Notes |
| 2020-10-15 07:49:42 | DEFERRED SUBMITTAL |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2020-09-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-09-03 |
Time |
11:20 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-09-03 |
Time |
11:20 |
Sent To |
|
|
| Notes |
| 2020-09-03 11:22:04 | NO PRODUCT APPROVALS WERE SUBMITTED FOR ROOFING | | | MATERIALS. THE PLANS SPECIFY TPO OVER LIGHTWEIGHT | | | CONCRETE INSULATION. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2020-11-24 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-11-24 |
Time |
15:39 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-11-24 |
Time |
15:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2020-11-13 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-11-13 |
Time |
09:06 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-11-13 |
Time |
09:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2020-11-05 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-11-05 |
Time |
10:46 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-11-05 |
Time |
10:46 |
Sent To |
|
|
| Notes |
| 2020-11-05 10:56:00 | THE DESIGNER OF THE FINAL GEO REPORT MUST DIGITALLY | | | SIGN AND SEAL THE REPORT. | | | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-10-09 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-10-09 |
Time |
10:02 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-10-09 |
Time |
10:02 |
Sent To |
|
|
| Notes |
| 2020-10-09 10:03:48 | THE ENTIRE PACKAGE OF C SHEETS MUST BE DIGITALLY SIGNED | | | AND SEALED. | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-08-25 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-08-25 |
Time |
11:08 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-08-25 |
Time |
11:08 |
Sent To |
|
|
| Notes |
| 2020-08-25 11:09:41 | SHEET A0.00- PER THE WPB AMENDMENTS TO THE FBC, EACH | | | SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED BY | | | THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL PLAN | | | REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD | | | PARTY VERIFICATION. PROVIDE CORRECTION. ALTERNATIVELY, | | | A SIGNED/SEALED PAPER SET MAY BE SUPPLIED TO THE | | | BUILDING DEPARTMENT WHEN ALL TRADES ARE APPROVED. WPB | | | FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2020-11-13 |
|
|
Cont ID |
|
| Sent By |
elevesqu |
Date |
2020-11-13 |
Time |
17:03 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2020-11-13 |
Time |
17:03 |
Sent To |
|
|
| Notes |
| 2020-11-13 17:03:42 | PROVISOS: | | | | | | 1. ALL ROOF MOUNTED EQUIPMENT SHALL BE SCREENED TO THE | | | HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT | | | SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH | | | BUILDING FA?ADE. SUBJECT TO ZONING INSPECTION AT TIME | | | OF TCO AND CO | | | 2. SEPARATE PERMIT REQUIRED FOR ALL SIGNAGE, FOR | | | PHOTOMETRICS, LANDSCAPE, IRRIGATION, AND BUS SHELTER | | | (IF EXACT DETAILS NOT INCLUDED ON THIS PERMIT). | | | 3. MAINTENANCE AGREEMENT SHALL BE RECORDED BETWEEN THE | | | DEVELOPER AND CITY FOR MAINTENANCE OF LANDSCAPE AND | | | HARDSCAPE WITHIN CITY ROW. THIS SHALL INCLUDE THE | | | LANDSCAPE AND IRRIGATION IN THE MEDIAN IN BANYAN | | | BOULEVARD | | | 4. THE PROPERTY SHALL BE REPLATTED PRIOR TO CO. A | | | PERPETUAL ACCESS AGREEMENT SHALL BE RECORDED AS PART OF | | | THE REPLAT OR THROUGH A SEPARATE INSTRUMENT FOR THE | | | PEDESTRIAN PASSAGEWAY ON THE EASTERN SIDE OF THE | | | STRUCTURE | | | 5. PERMIT REVISION SHALL BE REQUIRED PRIOR TO TCO TO | | | ILLUSTRATE PROPOSED TAMARIND AVENUE PLANS ONCE | | | COORDINATION EFFORTS WITH CITY, WHITING TURNER AND | | | APPLICANT HAVE BEEN COMPLETED. | | | 6. PERMIT REVISION SHALL BE REQUIRED IF RAILING DESIGN | | | OR OTHER ARCHITECTURAL FEATURES ARE MODIFIED | | | 7. APPROVED MINOR SITE PLAN SUBMITTAL FOR AS-BUILTS | | | REQUIRED PRIOR TO CO | | | 8. BUS SHELTER DETAILS TO BE REVIEWED THROUGH SEPARATE | | | PERMIT AND APPROVED PRIOR TO TCO. COLUMNS CANNOT BE | | | LOCATED IN MINIMUM FIVE FOOT SIDEWALK ON ROW | | | 9. ANY PORTION OF IMPROVEMENTS ALONG BANYAN BOULEVARD | | | THAT ARE OUTSIDE THE ROW OR OUTSIDE THE SCOPE OF THE | | | BANYAN BOULEVARD STREETSCAPE SHALL BE COMPLETED BY THE | | | DEVELOPER AND AT THE EXPENSE OF THE DEVELOPER | | | 10. THE PUBLIC SHALL HAVE ACCESS TO THE RETAIL PARKING | | | SPACES THROUGH THE PARKING GARAGE GATE. IF SPACE IS | | | UTILIZED FOR OFFICE SPACE, TENANTS SHALL HAVE ACCESS TO | | | THE 6 PARKING SPACES | | | 11. ALL ABOVE GROUND UTILITIES SHALL BE SCREENED WITH | | | LANDSCAPE TO BEST EXTENT POSSIBLE | | | 12. ANY MODIFICATIONS TO PLACEMENT OF ABOVE GROUND | | | UTILITIES SHALL BE COORDINATED WITH ZONING AS WELL AS | | | OTHER APPLICABLE DEPARTMENTS PRIOR TO INSTALLATION | | | 13. RECOMMENDING TO INCLUDE SKATEBOARD DETERRENT ON | | | BENCHES | | | 14. GROUND FLOOR WINDOWS SHALL BE LIGHT TINTED TO | | | PERMIT INTERACTION WITH THE EXTERIOR TO MEET | | | TRANSPARENCY REQUIREMENTS | | | 15. PARKING SPACES FOR GUESTS, THE COMMERCIAL SPACE AND | | | THE CAR SHARE SPACES SHALL BE CLEARLY INDICATED WITHIN | | | THE PARKING GARAGE THROUGH SIGNAGE OR OTHER MEANS | | | 16. THE SIDEWALK CONNECTIONS FROM THE TWO NORTH DOORS | | | (FOR FIRE EGRESS) ARE SHOWN FOR THE PURPOSE OF MEETING | | | FIRE EGRESS REQUIREMENTS. THESE SHOULD NOT BE REQUIRED | | | IF THE LINEAR PARK IS CONSTRUCTED AT THE SAME TIME AS | | | FLAGLER STATION. THIS SHALL BE CONFIRMED BY THE FIRE | | | CHIEF THROUGH THE APPROVAL FOR THE LINEAR PARK AND | | | PRIOR TO CO | | | 17. PER DAC CONDITION OF APPROVAL, A WARNING SIGN SHALL | | | BE INCLUDED AT THE PARKING GARAGE ENTRANCE INDICATING | | | TO PEDESTRIANS THAT A CAR IS APPROACHING | | | 18. ANY HISTORICAL RAILROAD OR OTHER ARTIFACT FOUND | | | WHILE SITE IS UNDER CONSTRUCTION SHALL BE PRESERVED AND | | | HISTORICAL PRESERVATION PLANNER SHALL COORDINATE ITS | | | REMOVAL OR RELOCATION | | | | | | | | | LIZ LEVESQUE, URBAN DESIGN PLANNER | | | 561 822 1426 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2020-10-16 |
|
|
Cont ID |
|
| Sent By |
elevesqu |
Date |
2020-10-16 |
Time |
10:02 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2020-10-16 |
Time |
10:01 |
Sent To |
|
|
| Notes |
| 2020-10-16 10:02:39 | GENERAL COMMENTS: | | | 1. SATISFIED. | | | 2. SATISFIED. | | | 3. SATISFIED. | | | 4. CONDITION OF APPROVAL: REMOVE ALL NON-APPLICABLE | | | LINEAR PARK PLANS AND ONLY SHOW WHAT WILL BE | | | CONSTRUCTED AS PART OF THIS PARENT SITE. PLEASE | | | ILLUSTRATED PROPOSED EDGE OF CONCRETE SIDEWALK AND | | | PAVERS ALONG TAMARIND (REMOVE PORTION THAT WOULD BE | | | BUILT WITH LINEAR PARK FOR THIS PERMIT SET) ? IN THE | | | CASE THE LINEAR PARK IS NOT BUILT, NEED TO SEE HOW THIS | | | WILL TRANSITION FROM PROPOSED SIDEWALK TO EXISTING | | | SIDEWALK ON TAMARIND AVENUE. ONLY SHOW PROPOSED | | | HARDSCAPE THAT WILL BE BUILT AS PART OF THIS PARENT | | | SITE (ADJUST ON CIVIL PLANS, SITE PLAN, HARDSCAPE PLAN, | | | ARCHITECTURAL, ETC.). ONLY INCLUDE INGROUND LIGHT | | | ADJACENT TO PARK IF IT WILL BE CONSTRUCTED AS PART OF | | | THIS PARENT SITE ? WILL NEED TO CONFIRM WITH | | | ENGINEERING ABOUT WHAT IS REQUIRED FOR THIS WITHIN THE | | | ROW | | | CONTINUE TO WORK WITH WHITING TURNER AND CRA ON | | | TAMARIND AVENUE PLANS AND SUBMIT A PERMIT REVISION WHEN | | | THE PLANS FOR THE LANDSCAPE/HARDSCAPE/CURBING ARE | | | FINALIZED FOR THIS SECTION OF TAMARIND AVENUE. | | | 5. CONIDTION OF APPROVAL: WHERE IS BUS SHELTER BEING | | | RELOCATED TO? PLEASE INDICATE ON ALL APPLICABLE PLANS. | | | LOCATION NEEDS TO BE SHOWN. EXACT DETAILS CAN BE SHOWN | | | THROUGH EXHIBIT OR THROUGH SEPARATE PERMIT | | | BUS SHELTER DETAILS TO BE REVIEWED THROUGH SEPARATE | | | PERMIT PRIOR TO TCO. COLUMNS FOR SHELTER CANNOT BE | | | PLACED IN FIVE-FOOT-WIDE SIDEWALK IN ROW | | | 6. CONDITION OF APPROVAL: INDICATE WHICH HARDSCAPE AND | | | LANDSCAPE PORTIONS ARE PART OF THE BANYAN BLVD | | | STREETSCAPE PROJECT ON ALL APPLICABLE PLANS (HARDSCAPE, | | | LANDSCAPE, SITE, ETC.) | | | ANY PORTION OF IMPROVEMENTS ALONG BANYAN BOULEVARD THAT | | | ARE OUTSIDE THE ROW OR OUTSIDE THE SCOPE OF THE BANYAN | | | BOULEVARD STREETSCAPE SHALL BE DONE BY THE DEVELOPER | | | AND AT THE EXPENSE OF THE DEVELOPER | | | 7. SATISFIED. | | | 8. SATISFIED | | | 9. SATISFIED | | | 10. CONDITION OF APPROVAL: WHERE ARE THE STREET LIGHTS | | | PROPOSED ALONG TAMARIND AVENUE? PLEASE INDICATE IN | | | LANDSCAPE PLANS FOR THIS PERMIT AND LANDSCAPE PERMIT. | | | WILL BE NEEDED FOR FUTURE REFERENCE FOR PHOTOMETRIC | | | PLAN FOR LIGHT POLES ALONG THIS STREET | | | PHOTOMETRICS AND SPECS TO BE REVIEWED THROUGH SEPARATE | | | PHOTOMETRIC PERMIT AND/OR AS PART OF TAMARIND AVENUE | | | STREETSCAPE PLANS. PLEASE COORDINATE WITH TAMARIND AVE | | | CONTRACTOR | | | 11. SATISFIED. | | | 12. CONDITION OF APPROVAL: PUBLIC ACCESS FOR RETAIL | | | PARKING SPACES REQUIRED. HOW IS THIS BEING | | | ACCOMPLISHED? PLEASE ADDRESS SOMEWHERE ON SITE PLAN | | | ACCESS NEEDS TO BE AVAILABLE FOR PUBLIC THROUGH PARKING | | | GARAGE GATE. THESE SPACES WILL NEED TO BE RESERVED FOR | | | THE COMMERCIAL USE WITHIN THE PARKING GARAGE | | | 13. CONDITION OF APPROVAL: A PEDESTRIAN WARNING SIGNAL | | | AT PARKING GARAGE ENTRANCE/EXIT IS REQUIRED AS PART OF | | | THE DAC FINAL APPROVAL. PLEASE INDICATE PROPOSED | | | LOCATION ON SITE PLAN | | | STAFF UNDERSTANDS THE MISCOMMUNICATION WITH THIS | | | COMMENT THAT THE APPLICANT PLACED TRUNCATED DOMES NEAR | | | THE ENTRANCE. STAFF CLARIFIED COMMENT TO WGI AND TO | | | DEVELOPER ? REQUESTING INCLUSION OF WARNING SIGN ON | | | BUILDING THAT ALERTS PEDESTRIANS THAT CAR IS COMING. | | | CAN BE SUBMITTED THROUGH SEPARATE PERMIT. SEE NEW | | | COMMENT #47 REGARDING TRUNCATED DOME | | | 14. NOT SATISFIED: CONSTRUCTION SITE MAINTENANCE PLAN | | | IS REQUIRED FOR APPROVAL BY CITY OF WP PD CPTED | | | OFFICIAL. PLEASE EMAIL OFFICER SETH BUXTON | | | ([email protected]) AND CC LIZ ([email protected]) | | | NEEDS TO BE DONE PRIOR TO CONSTRUCTION START | | | LANDSCAPE: | | | 15. SATISFIED. | | | 16. SATISFIED. | | | 17. SATISFIED. | | | 18. CONIDTION OF APPROVAL: PLANTER BED COULD BE | | | PROVIDED IN CENTER OF SIDEWALK BETWEEN FOUNDATION | | | LANDSCAPE AND CURB AT PROJECT?S SOUTHWEST CORNER. A | | | FOUR-FOOT-WIDE PLANTER BOX WOULD STILL PERMIT A 9-FOOT | | | SIDEWALK BETWEEN THE BED AND CURB AND PROVIDE FOR | | | ENHANCE SHADE BY SHIFTING ONE OF THE FOUNDATION TREES | | | OVER - BETTER MEETING THE INTENDED REQUIREMENTS OF THE | | | DMP STREETSCAPE REQUIREMENTS ? CONTACT LIZ FOR MORE | | | INFORMATION AND DISCUSSION | | | TAMARIND AVENUE PLANS DISCUSSION ONGOING BETWEEN | | | ZONING, CRA, DEVELOPER AND TAMARIND AVE CONTRACTOR | | | 19. CONDITION OF APPROVAL: STAFF RECOMMENDS INCLUDING | | | SKATEBOARDING DETERRENT ON BENCHES | | | RECOMMENDATION IN COA | | | ARCHITECTURAL PLANS: | | | 20. NOT SATISFIED. PLEASE INCLUDE GROUND FLOOR DETAIL | | | NOT ROOF DETAIL ON SITE PLAN SHEET A-1.00 | | | 21. SATISFIED. | | | 22. SATISFIED. | | | 23. NOT SATISFIED. TURN AROUND SPACE REQUIRED AT END OF | | | DEAD END DRIVE AISLE ON GROUND FLOOR AND 2ND FLOOR | | | (ENTIRE PARKING SPACE TO BE STRIPED THROUGH AND | | | DEDICATED FOR TURNAROUND) | | | 2ND FLOOR SHEET A-2.01 DOES NOT INDICATE TURN AROUND | | | SPACE ALTHOUGH COMMENT RESPOND MEMO INDICATES THAT THIS | | | WAS DONE. IF ALL OF THE SPACES ON THE 2ND FLOOR ARE | | | RESERVED FOR INDIVIDUAL UNITS, A TURNAROUND SPACE NOT | | | REQUIRED, BUT OTHERWISE IT WILL BE | | | 24. NOT SATISFIED. THREE ROWS OF TANDEM PARKING ON | | | SECOND FLOOR NEEDS TO BE REDUCED TO COMPACT SIZE SPACES | | | (16? LONG, NOT 18?) PER CONDITION OF SITE PLAN | | | APPROVAL. PLEASE LABEL THESE AS COMPACT. | | | COMMENT RESPONSE MEMO INDICATES THAT THESE WERE | | | LABELED, BUT THEY ARE NOT ON THE 2ND FLOOR PLAN | | | 25. NOT SATISFIED. PLEASE INCLUDE NUMBER OF COMPACT | | | SPACES IN PARKING DATA AND PERCENTAGE OF TOTAL SPACES | | | THERE ARE SIX COMPACT TANDEM SPACES, NOT 3 (COUNTED AS | | | INDIVIDUAL SPACES TOWARDS PROVIDED PARKING). PLEASE | | | UPDATE. | | | 26. NOT SATISFIED. BUILDING ADDRESS IDENTIFICATION | | | SIGNAGE DOES NOT NEED A SEPARATE PERMIT (ALL OTHER | | | SIGNS DO) ? CAN REMOVE SECOND SENTENCE FROM NOTE 54 ON | | | SHEET A-3.00 | | | SECOND SENTENCE STILL REMAINS | | | 27. CONDITION OF APPROVAL. PLEASE INCLUDE GLAZING | | | DETAIL AND SAMPLE IMAGES FOR ALL GROUND FLOOR AND | | | SECOND FLOOR WINDOW TYPES | | | STAFF UNDERSTANDS THAT THE WINDOWS MAY NOT YET HAVE | | | BEEN CHOSEN. PLEASE NOTE THAT GROUND FLOOR WINDOWS | | | SHALL BE LIGHT TINTED TO PERMIT INTERACTION WITH THE | | | EXTERIOR TO MEET TRANSPARENCY REQUIREMENTS | | | 28. SATISFIED. | | | 29. SATISFIED. | | | 30. NOT SATISFIED. PLEASE PROVIDE SAMPLE IMAGE OF | | | ALUMINUM MESH PRIVACY PARTITION DIVIDER (NOTE 24 ON | | | SHEET A-3.01) | | | REQUESTING ADDITIONAL MATERIAL INFORMATION. SEE NEW | | | COMMENT #51 | | | 31. SATISFIED | | | 32. SATISFIED | | | 33. PARTIALLY SATISFIED. PARKING QUANTITY PER FLOOR | | | TABLE ON SHEET A-0.02 LISTS REQUIRED PARKING FOR TYPE A | | | UNITS AS 1/13 UNIT. REQUIRED PARKING FOR MICROUNITS IS | | | 0.5/UNIT. PLEASE ADJUST ACCORDINGLY, KEEPING COMMENT #3 | | | IN MIND AS THE CALCULATIONS ARE REDONE. PARKING | | | QUANTITY PER FLOOR TABLE DOES NOT ACCOUNT FOR CAR SHARE | | | SPACES ? PLEASE INCLUDE. | | | SEE NEW COMMENT #52 | | | CIVIL: | | | 34. SATISFIED. | | | 35. NOT SATISFIED. CIVIL PLANS INDICATE TWO EXISTING | | | SEWER MANHOLES AND ONE TM MANHOLE AT PROJECT?S | | | NORTHWEST CORNER, BUT ONLY SEE TWO MANHOLES ON SITE. | | | PLEASE CLARIFY | | | TWO MANHOLES STILL REMAIN ON CIVIL PLANS | | | 36. SATISFIED. | | | 37. SATISFIED. | | | 38. NOT SATISFIED. SWMH 5359 DOES NOT APPEAR ON SITE OR | | | ON SURVEY ? PLEASE CLARIFY ON CIVIL PLANS. | | | LABEL STILL REMAINS ON CIVIL PLANS | | | 39. SATISFIED. | | | 40. SATISFIED. | | | 41. SATISFIED. | | | 42. SATISFIED. | | | 43. SATISFIED. | | | 44. SATISFIED. | | | 45. CONDITION OF APPROVAL. PLEASE INCLUDE CROSS SECTION | | | THAT RUNS PARALLEL TO BANYAN BOULEVARD AT THE PARKING | | | GARAGE ENTRANCE ? CLEARLY SHOWING THE SIDEWALK | | | ELEVATION FROM THE EAST TO WEST SIDE OF THE PARKING | | | GARAGE WALLS (SECTION SHOULD EXTEND BEYOND WALLS TO | | | SHOW CLEAR PICTURE) | | | SEE NEW COMMENT #47 | | | 46. CONDITION OF APPROVAL. PLEASE NOTE ? APPLICANT IS | | | RESPONSIBLE FOR ALL STREETSCAPE IMPROVEMENTS ALONG | | | TAMARIND AVENUE THAT IS NOT INCLUDED IN THE SCOPE OF | | | THE BANYAN STREETSCAPE PROJECT. THIS INCLUDES | | | CONTINUATION OF THE CURB LINE ALONG TAMARIND. THIS WILL | | | NEED TO BE REFLECTED ON ALL PLANS INCLUDING ENGINEERING | | | PERMIT PLANS. APPEARS THAT NO NEW CURB HAS BEEN | | | PROPOSED BEYOND WHAT IS BEING INCLUDED WITH BANYAN | | | STREETSCAPE DESIGN | | | COORDINATION FOR TAMARIND STREETSCAPE PLANS ONGOING | | | NEW COMMENTS OCTOBER 14, 2020: | | | 47. PLEASE CLARIFY WITH CITY TRAFFIC ENGINEERING IF | | | TRUNCATED DOME AT ENTRANCE OF PARKING GARAGE IS NEEDED | | | OR ACCEPTABLE. SUBMIT PERMIT REVISION TO ENGINEERING | | | AND BUILDING PERMIT PLANS PRIOR TO TCO SHOWING THIS | | | 48. PARKING CALCULATIONS ON SHEET A-2.00 INCORRECT. | | | LISTS 25 TANDEM SPACES (24 IS CORRECT) AND 3 TANDEM | | | COMPACT (SHOULD BE 6). SHEET A-1.00 SITE PLAN IS ALSO | | | INCORRECT FOR TANDEM SPACES. SHOULD BE 45 STANDARD | | | (INCLUDING 7 ADA), 6 COMPACT TANDEM, 24 STANDARD | | | TANDEM. THE PERCENTAGE FOR COMPACT SPACES WOULD BE 8%. | | | PLEASE MAKE SURE ALL SITE DATA TABLES ARE MATCHING AND | | | CONSISTENT INCLUDING FOR BIKE PARKING, PARKING, GBA, | | | AND OTHER ZONING REQUIREMENTS. PLEASE NOTE THAT THE | | | BIKE RACKS REQUIRED ALONG THE PUBLIC ROW SHOULD BE | | | INCLUDED AS REQUIRED BIKE PARKING. | | | 49. PLEASE LABEL PARKING SPACES RESERVED FOR RETAIL, | | | GUEST, AND CAR SHARE. THESE WERE LABELED ON THE WGI | | | SITE PLAN DURING SITE PLAN REVIEW BUT ARE NOT ON THE | | | NEW SITE PLAN OR ARCHITECTURAL PLANS | | | 50. DEVELOPER HAS INDICATED THAT RAILING DESIGN MIGHT | | | CHANGE. IF THIS IS CORRECT, PLEASE UPDATE DETAIL AND | | | ENSURE THAT BALCONY DIVIDER IS ARCHITECTURALLY | | | CONSISTENT | | | 51. BICYCLE RACKS ON CIVIL PLANS ARE INCORRECT, PLEASE | | | COORDINATE WITH HARDSCAPE AND LANDSCAPE PLANS | | | PROPOSED PROVISOS: | | | 1. ALL ROOF MOUNTED EQUIPMENT SHALL BE SCREENED TO THE | | | HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT | | | SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH | | | BUILDING FA?ADE. SUBJECT TO ZONING INSPECTION AT TIME | | | OF TCO AND CO | | | 2. SEPARATE PERMIT REQUIRED FOR ALL SIGNAGE, FOR | | | PHOTOMETRICS, LANDSCAPE, IRRIGATION, AND BUS SHELTER | | | (IF EXACT DETAILS NOT INCLUDED ON THIS PERMIT). | | | 3. MAINTENANCE AGREEMENT SHALL BE RECORDED BETWEEN THE | | | DEVELOPER AND CITY FOR MAINTENANCE OF LANDSCAPE AND | | | HARDSCAPE WITHIN CITY ROW. THIS SHALL INCLUDE THE | | | LANDSCAPE AND IRRIGATION IN THE MEDIAN IN BANYAN | | | BOULEVARD | | | 4. THE PROPERTY SHALL BE REPLATTED PRIOR TO CO. A | | | PERPETUAL ACCESS AGREEMENT SHALL BE RECORDED AS PART OF | | | THE REPLAT OR THROUGH A SEPARATE INSTRUMENT | | | 5. PERMIT REVISION SHALL BE REQUIRED PRIOR TO TCO TO | | | ILLUSTRATE PROPOSED TAMARIND AVENUE PLANS ONCE | | | COORDINATION EFFORTS WITH CITY, WHITING TURNER AND | | | APPLICANT HAVE BEEN COMPLETED. | | | 6. PERMIT REVISION SHALL BE REQUIRED IF RAILING DESIGN | | | OR OTHER ARCHITECTURAL FEATURES ARE MODIFIED | | | 7. APPROVED MINOR SITE PLAN SUBMITTAL FOR AS-BUILTS | | | REQUIRED PRIOR TO CO | | | 8. BUS SHELTER DETAILS TO BE REVIEWED THROUGH SEPARATE | | | PERMIT AND APPROVED PRIOR TO TCO. COLUMNS CANNOT BE | | | LOCATED IN MINIMUM FIVE FOOT SIDEWALK ON ROW | | | 9. ANY PORTION OF IMPROVEMENTS ALONG BANYAN BOULEVARD | | | THAT ARE OUTSIDE THE ROW OR OUTSIDE THE SCOPE OF THE | | | BANYAN BOULEVARD STREETSCAPE SHALL BE COMPLETED BY THE | | | DEVELOPER AND AT THE EXPENSE OF THE DEVELOPER | | | 10. THE PUBLIC SHALL HAVE ACCESS TO THE RETAIL PARKING | | | SPACES THROUGH THE PARKING GARAGE GATE. IF SPACE IS | | | UTILIZED FOR OFFICE SPACE, TENANTS SHALL HAVE ACCESS TO | | | THE 6 PARKING SPACES | | | 11. ALL ABOVE GROUND UTILITIES SHALL BE SCREENED WITH | | | LANDSCAPE TO BEST EXTENT POSSIBLE | | | 12. ANY MODIFICATIONS TO PLACEMENT OF ABOVE GROUND | | | UTILITIES SHALL BE COORDINATED WITH ZONING AS WELL AS | | | OTHER APPLICABLE DEPARTMENTS PRIOR TO INSTALLATION | | | 13. RECOMMENDING TO INCLUDE SKATEBOARD DETERRENT ON | | | BENCHES | | | 14. GROUND FLOOR WINDOWS SHALL BE LIGHT TINTED TO | | | PERMIT INTERACTION WITH THE EXTERIOR TO MEET | | | TRANSPARENCY REQUIREMENTS | | | 15. PARKING SPACES FOR GUESTS, THE COMMERCIAL SPACE AND | | | THE CAR SHARE SPACES SHALL BE CLEARLY INDICATED WITHIN | | | THE PARKING GARAGE THROUGH SIGNAGE OR OTHER MEANS | | | 16. THE SIDEWALK CONNECTIONS FROM THE TWO NORTH DOORS | | | (FOR FIRE EGRESS) ARE SHOWN FOR THE PURPOSE OF MEETING | | | FIRE EGRESS REQUIREMENTS. THESE SHOULD NOT BE REQUIRED | | | IF THE LINEAR PARK IS CONSTRUCTED AT THE SAME TIME AS | | | FLAGLER STATION. THIS SHALL BE CONFIRMED BY THE FIRE | | | CHIEF THROUGH THE APPROVAL FOR THE LINEAR PARK AND | | | PRIOR TO CO | | | 17. PER DAC CONDITION OF APPROVAL, A WARNING SIGN SHALL | | | BE INCLUDED AT THE PARKING GARAGE ENTRANCE INDICATING | | | TO PEDESTRIANS THAT A CAR IS APPROACHING | | | | | | | | | LIZ LEVESQUE, URBAN DESIGN PLANNER | | | 561 822 1426 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2020-08-31 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2020-08-31 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2020-08-31 |
Time |
14:30 |
Sent To |
|
|
| Notes |
| 2020-08-31 14:31:19 | GENERAL COMMENTS: | | | 1. CONTACT CAROLINE PUELL FOR AN ADDRESS CHANGE AND | | | SUBMIT THE PERMIT UNDER THE NEW ADDRESS FOR THE | | | COMBINED LOTS. PLEASE TEMPORARILY UPDATE ADDRESS ON | | | SHEET LC-1.01 TO 951 BANYAN BLVD. AS IT DOES NOT | | | REFLECT THE CURRENT ADDRESS AND UPDATE WITH NEW ADDRESS | | | ONCE NEW ADDRESS HAS BEEN ASSIGNED. | | | 2. RESTRICTIVE COVENANT NEEDS TO BE APPROVED AND | | | RECORDED FOR LINEAR PROPERTIES TO NOT PERMIT OCCUPIED | | | STRUCTURES IN ORDER TO PERMIT FA?ADE OPENINGS ALONG | | | NORTH PROPERTY LINE. CURRENTLY SCHEDULED TO GO TO CRA | | | BOARD IN OCTOBER FOR REVIEW AND APPROVAL | | | 3. RESTRICTIVE COVENANT FOR THE TRANSFER OF CITY-OWNED | | | TDRS NEEDS TO BE APPROVED PRIOR TO CO. SCHEDULED FOR | | | SEPTEMBER 8TH CC HEARING | | | 4. REMOVE ALL NON-APPLICABLE LINEAR PARK PLANS AND ONLY | | | SHOW WHAT WILL BE CONSTRUCTED AS PART OF THIS PARENT | | | SITE. PLEASE ILLUSTRATED PROPOSED EDGE OF CONCRETE | | | SIDEWALK AND PAVERS ALONG TAMARIND (REMOVE PORTION THAT | | | WOULD BE BUILT WITH LINEAR PARK FOR THIS PERMIT SET) ? | | | IN THE CASE THE LINEAR PARK IS NOT BUILT, NEED TO SEE | | | HOW THIS WILL TRANSITION FROM PROPOSED SIDEWALK TO | | | EXISTING SIDEWALK ON TAMARIND AVENUE. ONLY SHOW | | | PROPOSED HARDSCAPE THAT WILL BE BUILT AS PART OF THIS | | | PARENT SITE (ADJUST ON CIVIL PLANS, SITE PLAN, | | | HARDSCAPE PLAN, ARCHITECTURAL, ETC). ONLY INCLUDE | | | INGROUND LIGHT ADJACENT TO PARK IF IT WILL BE | | | CONSTRUCTED AS PART OF THIS PARENT SITE ? WILL NEED TO | | | CONFIRM WITH ENGINEERING ABOUT WHAT IS REQUIRED FOR | | | THIS WITHIN THE ROW | | | 5. WHERE IS BUS SHELTER BEING RELOCATED TO? PLEASE | | | INDICATE ON ALL APPLICABLE PLANS. LOCATION NEEDS TO BE | | | SHOWN. EXACT DETAILS CAN BE SHOWN THROUGH EXHIBIT OR | | | THROUGH SEPARATE PERMIT | | | 6. INDICATE WHICH HARDSCAPE AND LANDSCAPE PORTIONS ARE | | | PART OF THE BANYAN BLVD STREETSCAPE PROJECT ON ALL | | | APPLICABLE PLANS (HARDSCAPE, LANDSCAPE, SITE, ETC) | | | 7. PLEASE INDICATE LOCATION OF COMPACTOR/RECYCLING BIN | | | STAGING AREA ON BANYAN AS CONDITIONED BY SITE PLAN | | | APPROVAL ON ALL APPLICABLE PLANS (CIVIL, LANDSCAPE, | | | HARDSCAPE, ETC) | | | 8. PROPOSED ROW OF BIKE RACKS AT THE PROJECTS NORTHWEST | | | CORNER LOOKS TO CONFLICT WITH EXISTING POWER POLE AND | | | GUY WIRE. PLEASE ADJUST AS NECESSARY TO ENSURE AT LEAST | | | 3 FEET OF CLEARANCE FROM BIKE RACK POLE TO POWER POLE, | | | AND TO NOT CONFLICT WITH GUY WIRE LOCATION. MAY NEED TO | | | REMOVE NORTH RACK AND PLACE ELSEWHERE ON SITE | | | 9. BICYCLE RACK LOCATION ALONG BANYAN BOULEVARD FA?ADE | | | ? DIMENSIONS DON?T MATCH BIKE DETAIL ON SHEET LH-304. | | | NEED 36? BETWEEN BIKE RACKS. SEEMS TO BE MISSING ON | | | BIKE RACK OR SPACED INCORRECTLY ? PLEASE ADJUST. | | | 10. WHERE ARE THE STREET LIGHTS PROPOSED ALONG TAMARIND | | | AVENUE? PLEASE INDICATE IN LANDSCAPE PLANS FOR THIS | | | PERMIT AND LANDSCAPE PERMIT. WILL BE NEEDED FOR FUTURE | | | REFERENCE FOR PHOTOMETRIC PLAN FOR LIGHT POLES ALONG | | | THIS STREET | | | 11. PLEASE SUBMIT SEPARATE AUTOTURN EXHIBITS FOR THE | | | FOLLOWING, PER SITE PLAN CONDITION OF APPROVAL (TO BE | | | REVIEWED BY TRAFFIC ENGINEERING): | | | A. ENTERING THE LOADING SPACE FROM BANYAN | | | B. EXITING THE LOADING SPACE FROM BANYAN | | | C. TANDEM COMPACT SPACES ON 2ND FLOOR | | | D. TURN AROUND SPACE AT DEAD-END OF FIRST AND SECOND | | | FLOOR (SEE ARCHITECTURAL COMMENTS FOR NECESSARY TURN | | | AROUND SPACE) | | | 12. PUBLIC ACCESS FOR RETAIL PARKING SPACES REQUIRED. | | | HOW IS THIS BEING ACCOMPLISHED? PLEASE ADDRESS | | | SOMEWHERE ON SITE PLAN | | | 13. A PEDESTRIAN WARNING SIGNAL AT PARKING GARAGE | | | ENTRANCE/EXIST IS REQUIRED AS PART OF THE DAC FINAL | | | APPROVAL. PLEASE INDICATE PROPOSED LOCATION ON SITE | | | PLAN | | | 14. CONSTRUCTION SITE MAINTENANCE PLAN IS REQUIRED FOR | | | APPROVAL BY CITY OF WP PD CPTED OFFICIAL. PLEASE EMAIL | | | OFFICER SETH BUXTON ([email protected]) AND CC LIZ | | | ([email protected]) | | | | | | LANDSCAPE: | | | 15. PLEASE INCLUDE SAMPLE IMAGES ON SHEET LH-501 FOR | | | HARDSCAPE MATERIAL SAMPLES | | | 16. PLEASE NOTE, LANDSCAPE WILL BE REVIEWED THROUGH A | | | SEPARATE PERMIT. LANDSCAPE AND IRRIGATION PLANS WILL | | | HAVE A VOID STAMP THROUGH THEM IN THIS PERMIT SET AS | | | THEY WILL NOT BE INCLUDED IN ANY APPROVALS. PLEASE KEEP | | | IN THIS SET FOR STAFF REFERENCE | | | 17. WATER METER, FDC AND BACKFLOW SHOULD BE SCREENED ON | | | ALL POSSIBLE SIDES WITH LANDSCAPE. PLEASE INDICATE ON | | | PLANS. IF THERE ARE QUESTIONS REGARDING PERMITTED | | | SCREENING PLEASE CONTACT MARK HURLEY FOR WATER METER | | | AND BACKFLOW, AND CHIEF PETER LEDUC FOR FDC AND CC | | | ZONING STAFF | | | 18. PLANTER BED COULD BE PROVIDED IN CENTER OF SIDEWALK | | | BETWEEN FOUNDATION LANDSCAPE AND CURB AT PROJECT?S | | | SOUTHWEST CORNER. A FOUR FOOT WIDE PLANTER BOX WOULD | | | STILL PERMIT A 9 FOOT SIDEWALK BETWEEN THE BED AND CURB | | | AND PROVIDE FOR ENHANCE SHADE BY SHIFTING ONE OF THE | | | FOUNDATION TREES OVER - BETTER MEETING THE INTENDED | | | REQUIREMENTS OF THE DMP STREETSCAPE REQUIREMENTS ? | | | CONTACT LIZ FOR MORE INFORMATION AND DISCUSSION | | | 19. STAFF RECOMMENDS INCLUDING SKATEBOARDING DETERRENT | | | ON BENCHES | | | | | | ARCHITECTURAL PLANS: | | | 20. PLEASE INCLUDE GROUND FLOOR DETAIL NOT ROOF DETAIL | | | ON SITE PLAN SHEET A-1.00 | | | 21. INCLUDE APPROVED VARIANCE TABLE FROM DAC APPROVALS | | | ON SITE PLAN | | | 22. PARKING SPACES SHALL BE DOUBLE STRIPED | | | 23. TURN AROUND SPACE REQUIRED AT END OF DEAD END DRIVE | | | AISLE ON GROUND FLOOR AND 2ND FLOOR (ENTIRE PARKING | | | SPACE TO BE STRIPED THROUGH AND DEDICATED FOR TURN | | | AROUND) | | | 24. THREE ROWS OF TANDEM PARKING ON SECOND FLOOR NEEDS | | | TO BE REDUCED TO COMPACT SIZE SPACES (16? LONG, NOT | | | 18?) PER CONDITION OF SITE PLAN APPROVAL. PLEASE LABEL | | | THESE AS COMPACT. | | | 25. PLEASE INCLUDE NUMBER OF COMPACT SPACES IN PARKING | | | DATA AND PERCENTAGE OF TOTAL SPACES | | | 26. BUILDING ADDRESS IDENTIFICATION SIGNAGE DOES NOT | | | NEED A SEPARATE PERMIT (ALL OTHER SIGNS DO) ? CAN | | | REMOVE SECOND SENTENCE FROM NOTE 54 ON SHEET A-3.00 | | | 27. PLEASE INCLUDE GLAZING DETAIL AND SAMPLE IMAGES FOR | | | ALL GROUND FLOOR AND SECOND FLOOR WINDOW TYPES | | | 28. EXAMINE THE INCLUSION OF MESH OR OTHER PERVIOUS | | | BARRIER BEHIND THE GARAGE SCREEN TO HELP BLOCK VIEWS | | | INTO THE MECHANICAL EQUIPMENT ROOM AND PARKING GARAGE. | | | IS THIS A POSSIBILITY? | | | 29. LOUVRES FOR ELEVATOR SHAFT (NOTE 48 ON SHEET | | | A-4.00) ? PLEASE USE LOUVRES THAT MATCH THE FA?ADE | | | BUILDING COLOR. PLEASE ADD NOTE THAT THEY WILL MATCH | | | 30. PLEASE PROVIDE SAMPLE IMAGE OF ALUMINUM MESH | | | PRIVACY PARTITION DIVIDER (NOTE 24 ON SHEET A-3.01) | | | 31. SUBMIT FAR, ACTIVE USE, TRANSPARENCY, PLANAR BREAK, | | | BUILDING FOOTPRINT, AND GBA EXHIBITS. PLEASE UPDATE | | | WITH NEW FLOOR LAYOUT AS NECESSARY | | | 32. PLEASE SUBMIT COLOR RENDERINGS AND COLORED | | | ELEVATIONS | | | 33. PARKING QUANTITY PER FLOOR TABLE ON SHEET A-0.02 | | | LISTS REQUIRED PARKING FOR TYPE A UNITS AS 1/13 UNIT. | | | REQUIRED PARKING FOR MICROUNITS IS 0.5/UNIT. PLEASE | | | ADJUST ACCORDINGLY, KEEPING COMMENT #3 IN MIND AS THE | | | CALCULATIONS ARE REDONE. PARKING QUANTITY PER FLOOR | | | TABLE DOES NOT ACCOUNT FOR CAR SHARE SPACES ? PLEASE | | | INCLUDE. | | | | | | CIVIL: | | | 34. PLEASE CLEARLY LABEL TRAFFIC POLE BOX ON CIVIL | | | PLANS ? LOOKS LIKE THIS COULD BE SCREENED BY LANDSCAPE | | | ON AT LEAST THREE SIDES. PLEASE EXTEND LANDSCAPE BED TO | | | INCLUDE POLE, PULL-BOX, AND STREET LIGHT BOX | | | 35. CIVIL PLANS INDICATE TWO EXISTING SEWER MANHOLES | | | AND ONE TM MANHOLE AT PROJECT?S NORTHWEST CORNER, BUT | | | ONLY SEE TWO MANHOLES ON SITE. PLEASE CLARIFY | | | 36. CHECK WITH PUBLIC WORKS ? IS THREE SANITARY | | | MANHOLES NECESSARY AT PROJECT?S NORTHEAST CORNER? THIS | | | WILL ALSO GROUP THREE MANHOLES TOGETHER AT THE NORTH | | | END OF THE PEDESTRIAN PASSAGEWAY ? EXPLORE ALTERNATIVE | | | OPTIONS FOR THE SAKE OF THE PEDESTRIAN PASSAGEWAY AND | | | FUTURE PROPOSED LINEAR PARK | | | 37. THERE IS AN EXISTING SEWER MANHOLE AT THE NORTHERN | | | PORTION OF THE PROJECT ALONG TAMARIND THAT IS EXISTING | | | WHERE NEW PAVERS ARE PROPOSED. WILL THIS MANHOLE | | | REMAIN? IF SO, PAVERS MAY NEED TO BE MODIFIED. PLEASE | | | EXAMINE AND ADJUST AS NECESSARY. | | | 38. SWMH 5359 DOES NOT APPEAR ON SITE OR ON SURVEY ? | | | PLEASE CLARIFY ON CIVIL PLANS. | | | 39. WHAT IS MAXIMUM SLOPE OF PEDESTRIAN SIDEWALK ALONG | | | TAMARIND (SECTION C-C)? | | | 40. PLEASE INDICATE LOCATION OF COMPACTOR/RECYCLING BIN | | | STAGING AREA ON BANYAN AS CONDITIONED BY SITE PLAN | | | APPROVAL ON ALL APPLICABLE PLANS (CIVIL, LANDSCAPE, | | | HARDSCAPE, ETC) | | | 41. PLEASE INDICATE PROPOSED LOCATION OF BUS SHELTER ON | | | CIVIL PLANS | | | 42. PLEASE REMOVE REFERENCE TO LINEAR PARK FROM ALL | | | PLANS AS THEY WILL BE REVIEWED THROUGH SEPARATE PERMITS | | | AT A LATER DATE | | | 43. PLEASE REMOVE PROPOSED MEDIAN AND ALL OTHER BANYAN | | | BOULEVARD STREETSCAPE ELEMENTS OF PROJECT 2172398 | | | (SIDEWALK, BICYCLE LANE, NEW CURB, ETC) FROM DEMOLITION | | | PLAN SHEET C-2 AS THESE ARE NOT THE CURRENT CONDITIONS | | | ON SITE AND REMOVE REFERENCE FOR NEW ELEMENTS TO BE | | | INSTALLED AS PART OF THE STREETSCAPE IMPROVEMENTS ? | | | KEEP THESE ON PROPOSED PLANS, REMOVE FROM DEMOLITION | | | PLANS | | | 44. ONLY SHOW PROPOSED PAVING, UTILITIES, ETC. THAT | | | WILL BE BUILT OR PLACED AS PART OF THIS PARENT SITE | | | (ADJUST ON CIVIL PLANS, SITE PLAN, HARDSCAPE PLAN, | | | ARCHITECTURAL, ETC). | | | 45. PLEASE INCLUDE CROSS SECTION THAT RUNS PARALLEL TO | | | BANYAN BOULEVARD AT THE PARKING GARAGE ENTRANCE ? | | | CLEARLY SHOWING THE SIDEWALK ELEVATION FROM THE EAST TO | | | WEST SIDE OF THE PARKING GARAGE WALLS (SECTION SHOULD | | | EXTEND BEYOND WALLS TO SHOW CLEAR PICTURE) | | | 46. PLEASE NOTE ? APPLICANT IS RESPONSIBLE FOR ALL | | | STREETSCAPE IMPROVEMENTS ALONG TAMARIND AVENUE THAT IS | | | NOT INCLUDED IN THE SCOPE OF THE BANYAN STREETSCAPE | | | PROJECT. THIS INCLUDES CONTINUATION OF THE CURB LINE | | | ALONG TAMARIND. THIS WILL NEED TO BE REFLECTED ON ALL | | | PLANS INCLUDING ENGINEERING PERMIT PLANS. APPEARS THAT | | | NO NEW CURB HAS BEEN PROPOSED BEYOND WHAT IS BEING | | | INCLUDED WITH BANYAN STREETSCAPE DESIGN | | | | | | PROPOSED PROVISOS: | | | 1. ALL ROOF MOUNTED EQUIPMENT SHALL BE SCREENED TO THE | | | HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT | | | SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH | | | BUILDING FA?ADE. SUBJECT TO ZONING INSPECTION AT TIME | | | OF TCO AND CO | | | 2. SEPARATE PERMIT REQUIRED FOR ALL SIGNAGE, FOR | | | PHOTOMETRICS, LANDSCAPE, IRRIGATION, AND BUS SHELTER | | | (IF EXACT DETAILS NOT INCLUDED ON THIS PERMIT). | | | 3. MAINTENANCE AGREEMENT SHALL BE RECORDED BETWEEN THE | | | DEVELOPER AND CITY FOR MAINTENANCE OF LANDSCAPE AND | | | HARDSCAPE WITHIN CITY ROW. THIS SHALL INCLUDE THE | | | LANDSCAPE AND IRRIGATION IN THE MEDIAN IN BANYAN | | | BOULEVARD | | | 4. THE PROPERTY SHALL BE REPLATTED PRIOR TO CO. A | | | PERPETUAL ACCESS AGREEMENT SHALL BE RECORDED AS PART OF | | | THE REPLAT OR THROUGH A SEPARATE INSTRUMENT | | | 5. NO ARTIFICIAL GREEN WALL IS PERMITTED ALONG EXTERIOR | | | FACADES | | | | | | | | | LIZ LEVESQUE, URBAN DESIGN PLANNER | | | 561 822 1426 | | | [email protected] |
|
|
|