| Plan Review Stops For Permit 20080310 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2020-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-09-24 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-09-24 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2020-08-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-08-20 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-08-20 |
Time |
14:53 |
Sent To |
|
|
| Notes |
| 2020-08-20 14:54:02 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-09-24 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-09-24 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-08-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-08-20 |
Time |
14:56 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-08-20 |
Time |
14:56 |
Sent To |
|
|
| Notes |
| 2020-08-20 15:12:22 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC 107, I WAS UNABLE TO LOCATE INFORMATION | | | REGARDING THE ELEVATOR LOBBY; ARE THE ELEVATORS | | | PRESSURIZED? IS THIS A HIGH RISE BUILDING? YOU MAY | | | RESPOND VIA EMAIL. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-08-26 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2020-08-26 |
Time |
21:19 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2020-08-26 |
Time |
20:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-09-21 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-09-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-09-21 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2020-09-21 14:29:31 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) ANY REMOVAL AND/OR CONSTRUCTION OF WALLS AND /OR | | | CEILINGS REQUIRE AN EVALUATION OF THE FIRE ALARM AND/OR | | | FIRE SPRINKLER SYSTEMS BY APPLICABLE LICENSED | | | CONTRACTORS FOR CODE COVERAGE COMPLIANCE. | | | | | | | | | 2) ANY AND ALL WORK ON THE FIRE ALARM AND/OR FIRE | | | SPRINKLER SYSTEMS, INCLUDING DEMO, SHALL BE DONE UNDER | | | SEPARATE PERMITS AND SHOP DRAWINGS. | | | | | | | | | 3) THE EXISTING LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR | | | FIRE SPRINKLER SHALL BE MAINTAINED AND REMAIN ACTIVE | | | THROUGHOUT THE CONSTRUCTION PERIOD, INCLUDING DEMO. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2020-08-24 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-08-24 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-08-24 |
Time |
10:48 |
Sent To |
|
|
| Notes |
| 2020-08-24 12:13:25 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) SHEET A 1.01 - THE PROPOSED PROJECT AFFECTS THE MAIN | | | EGRESSES FOR THE BUILDING. | | | | | | THERE IS NO LIFE SAFETY PLAN THAT PROVIDES FOR | | | MAINTAINING SAFE EGRESS DURING THE DEMO AND OR | | | THROUGHOUT THE CONSTRUCTION PERIOD. | | | | | | PLEASE PROVIDE A LIFE SAFETY SHEET WITH THE DETAILS. | | | | | | | | | 2) SHEET A 1.01 - AS PART OF THE BUILDING LIFE SAFETY | | | SYSTEM, ARE THE ELEVATORS/CORRIDOR PRESSURIZED? | | | | | | IF SO, HOW WILL THE SYSTEM BE MAINTAINED? | | | | | | PLEASE PROVIDE A REIEW OF HOW THE PROPOSED AFFECTS ANY | | | LIFE SAFETY FEATURES. | | | | | | | | | 3) SHEET A 1.01 - THERE ARE NO INDICATIONS OF EXISTING | | | FIRE SPRINKLER AND FIRE ALARM SYSTEMS AND EQUIPMENT. | | | | | | THE EXISTING FIRE ALARM SYSTEM DEVICES SHALL BE | | | MAINTAINED AND REMAIN ACTIVE THROUGHOUT THE | | | CONSTRUCTION PERIOD. | | | | | | ANY AND ALL WORK ON THE FIRE ALARM SYSTEM OR DEVICES | | | SHALL BE DONE UNDER SEPARATE PERMITS AND SHOP DRAWINGS. | | | | | | | | | PLEASE ENSURE COMPLIANCE AND PROVIDE AN APPLICABLE NOTE | | | ON THE LIFE SAFETY PLAN. | | | | | | | | | 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-09-24 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-09-17 |
Time |
13:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-09-17 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-09-17 |
Time |
13:08 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-08-19 |
Time |
15:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-09-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-09-24 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-09-24 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-08-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-08-20 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-08-20 |
Time |
14:54 |
Sent To |
|
|
| Notes |
|
|