Plan Review Details - Permit 20080270
Plan Review Stops For Permit 20080270
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 08:10 Rev Time 0.00
Received By rmcphers Date 2020-12-11 Time 08:10 Sent To  
Notes
2020-12-11 08:13:57SFR ADDITION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 2ND REVIEW
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE SHOW THE USE OF THE ROOM ON THE FLOOR PLAN.
 2) PLEASE PROVIDE A COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVAL FOR THE ROOFING. (CIRCLE THE ROOFING
 TILE ATTACHMENT ON THE PRODUCT APPROVAL TO BE USED - IF
 USING ADHESIVE PLEASE PROVIDE THE MIAMI DADE OR FLORIDA
 STATE PRODUCT APPROVAL FOR THE ADHESIVE).
 3) PLEASE PROVIDE A COPY OF THE PRODUCT APPROVAL LISTED
 ON THE DRAWINGS FOR THE WINDOWS.
 4) PLEASE PROVIDE A ROOF FRAMING PLAN - SHOWING THE
 STRAPPING DETAILS AS STATED ON DRAWING (A1).
 5) PLEASE SHOW THE "R" VALUE FOR THE CEILING
 INSULATION.
 6) PLEASE SHOW THE ATTIC ACCESS LOCATION AND SIZE TO
 COMPLY WITH FBC R807.1
 7) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT - OR
 - PROVIDE A STATEMENT ON THE DRAWINGS FROM THE
 ARCHITECT STATING THE EXISTING SOIL BEARING CAPACITY
 MEETS THE DESIGN CAPACITY OF 2500PSF.
 8) PLEASE SHOW THE LOCATION OF THE ADDITION ON THE
 SURVEY - OR - SITE PLAN.
 9) PLEASE SHOW THE CEILING HEIGHT.
 10) THE ADDED TRUSS LAYOUT AND TRUSS ENGINEERING NEEDS
 TO BE SIGNED AND SEALED BY THE TRUSS ENGINEER AND
 REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER
 OF RECORD FBC WPB 107.3.4.1

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-09-17 Cont ID  
Sent By rmcphers Date 2020-09-17 Time 14:47 Rev Time 0.00
Received By rmcphers Date 2020-09-17 Time 12:51 Sent To  
Notes
2020-09-17 13:26:32SFR ADDITION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE SHOW THE USE OF THE ROOM ON THE FLOOR PLAN.
 2) PLEASE PROVIDE A COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVAL FOR THE ROOFING. (CIRCLE THE ROOFING
 TILE ATTACHMENT ON THE PRODUCT APPROVAL TO BE USED - IF
 USING ADHESIVE PLEASE PROVIDE THE MIAMI DADE OR FLORIDA
 STATE PRODUCT APPROVAL FOR THE ADHESIVE).
 3) PLEASE PROVIDE A COPY OF THE PRODUCT APPROVAL LISTED
 ON THE DRAWINGS FOR THE WINDOWS.
 4) PLEASE PROVIDE A ROOF FRAMING PLAN - SHOWING THE
 STRAPPING DETAILS AS STATED ON DRAWING (A1).
 5) PLEASE SHOW THE "R" VALUE FOR THE CEILING
 INSULATION.
 6) PLEASE SHOW THE ATTIC ACCESS LOCATION AND SIZE TO
 COMPLY WITH FBC R807.1
 7) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT - OR
 - PROVIDE A STATEMENT ON THE DRAWINGS FROM THE
 ARCHITECT STATING THE EXISTING SOIL BEARING CAPACITY
 MEETS THE DESIGN CAPACITY OF 2500PSF.
 8) PLEASE SHOW THE LOCATION OF THE ADDITION ON THE
 SURVEY - OR - SITE PLAN.
 9) PLEASE SHOW THE CEILING HEIGHT.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-08-24 Cont ID  
Sent By cthroop Date 2020-08-24 Time 10:38 Rev Time 0.00
Received By cthroop Date 2020-08-24 Time 10:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 08:18 Rev Time 0.00
Received By rmcphers Date 2020-12-01 Time 09:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-17 Cont ID  
Sent By rmcphers Date 2020-09-17 Time 14:47 Rev Time 0.00
Received By rmcphers Date 2020-08-06 Time 11:50 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2020-09-17 Cont ID  
Sent By rmcphers Date 2020-09-17 Time 14:37 Rev Time 0.00
Received By rmcphers Date 2020-09-17 Time 14:37 Sent To  
Notes
2020-09-17 14:38:48PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2020-12-02 Cont ID  
Sent By hmoser Date 2020-12-02 Time 11:05 Rev Time 0.00
Received By hmoser Date 2020-12-02 Time 11:00 Sent To  
Notes
2020-12-02 11:06:32NO AIR CONDITIONING PLAN SUBMITTED. HM.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-08-12 Cont ID  
Sent By hmoser Date 2020-08-12 Time 10:06 Rev Time 0.00
Received By hmoser Date 2020-08-12 Time 09:54 Sent To  
Notes
2020-08-12 10:06:27DENIED
 NO AIR CONDITIONING PLAN SUBMITTED.
 PLAN REVIEW BY HAROLD MOSER
 [email protected]
 OFFICE 561-805-6732
 FAX 561-805-6676

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 2 Status F Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 08:14 Rev Time 0.00
Received By rmcphers Date 2020-12-11 Time 08:14 Sent To  
Notes
2020-12-11 08:15:16AE 7
 ADDITION TO A DETACHED SFR - NEED TO KNOW THE USE OF
 THE BUILDING

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status F Date 2020-09-17 Cont ID  
Sent By rmcphers Date 2020-09-17 Time 14:44 Rev Time 0.00
Received By rmcphers Date 2020-09-17 Time 14:44 Sent To  
Notes
2020-09-17 14:46:26AE 7
 ADDITION TO A DETACHED SFR - NEED TO KNOW THE USE.

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-08-12 Cont ID  
Sent By abelisle Date 2020-08-12 Time 19:27 Rev Time 0.00
Received By abelisle Date 2020-08-12 Time 19:27 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 08:15 Rev Time 0.00
Received By rmcphers Date 2020-12-11 Time 08:15 Sent To  
Notes
2020-12-11 08:15:50SEE BUILDING PLAN REVIEW

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2020-09-17 Cont ID  
Sent By rmcphers Date 2020-09-17 Time 14:39 Rev Time 0.00
Received By rmcphers Date 2020-09-17 Time 14:39 Sent To  
Notes
2020-09-17 14:39:34SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 08:18 Rev Time 0.00
Received By rmcphers Date 2020-12-11 Time 08:16 Sent To  
Notes
2020-12-11 08:17:37SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-09-17 Cont ID  
Sent By rmcphers Date 2020-09-17 Time 14:41 Rev Time 0.00
Received By rmcphers Date 2020-09-17 Time 14:41 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-09-02 Cont ID  
Sent By kalexand Date 2020-09-02 Time 16:27 Rev Time 0.00
Received By kalexand Date 2020-09-02 Time 16:27 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved