| 2020-08-14 06:01:18 | 1) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC. |
| | G2413.4.1, G2413.4.2. |
| | 2) TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 3) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| | OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| | G2413.4 (1 ) THROUGH G2413.4 (21). |
| | 4) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| | FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. |
| | SEC. G 2413.4.1, G2413.4.2. |
| | 5) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3 |
| | THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3. |
| | 6) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | 7) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER APPROVED STANDARD THAT WERE USED |
| | IN THE DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 |
| | FBC-FUEL GAS SECS. 401.4, 401.8, 402.3, AND TABLES |
| | 402.4 (1) THRU 402.4 (37) OR 2017 FBC-RES. SEC. |
| | G2413.3, G2412.8, G2413.1, G2413.2, & G2413.3. |
| | 8) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| | LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| | TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| | SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| | SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| | SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| | THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| | APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| | APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| | PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| | FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| | SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |