| 2020-08-11 12:49:58 | 08/11/20 1ST PLUMBING/POOL REVIEW**DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 2. PLANS ARE REQUIRED TO BE DESIGNED AND SIGNED AND |
| | SEALED BY A LICENSED ENGINEER OR ARCHITECT PER THE |
| | 61G15-23.005. |
| | |
| | 3. SIGNED AND SEALED DRAWINGS NEED TO BE |
| | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR |
| | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR - |
| | IF YOUR ENGINEER DOES NOT HAVE A ELECTRONIC OR DIGITAL |
| | SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE |
| | ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN |
| | REVIEW REQUEST FORM" EXPLAINING THE REASON FOR |
| | SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW |
| | REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected] |
| | AND ASKING FOR THE FORM. |
| | |
| | 4. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER |
| | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 |
| | EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE |
| | (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE |
| | DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE |
| | SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS |
| | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS |
| | EXCEPT THE PUMP. |
| | |
| | 5. SUBMIT SPECIFICATIONS FOR THE POOL PUMP AND |
| | CARTRIDGE FILTER PER THE WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | |
| | 6. ALL HOSE BIBBS EXPOSED TO THE POOL AREA SHALL BE |
| | EQUIPPED WITH A VACUUM BREAKER PER THE 2017 FBC |
| | R4501.9. |
| | |
| | 7. SUBMIT COPY OF THE POOL PUMP CURVE. IDENTIFY ON THE |
| | PUMP CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP |
| | BEING INSTALLED ON THIS POOL. THIS IS NEEDED TO CONFIRM |
| | THE MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS PER |
| | THE ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. |
| | |
| | 8. SUBMIT CLEAR AND LEGIBLE SPECIFICATIONS FOR THE |
| | CARTRIDGE FILTER PER THE WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | |
| | 9. BACKFLOW PREVENTER REQUIRED PER THE CITY OF WEST |
| | PALM BEACH ORD #2853-95. A PERMIT REQUIRED BY A |
| | LICENSED CONTRACTOR AND MUST BE CERTIFIED BY UTILITIES |
| | PRIOR TO FINAL INSPECTION. A DUAL CHECK VALVE MAY BE |
| | USED IF NO POOL FILL IS INSTALLED AT THE METER AND |
| | INSTALLED BY UTILITIES WHICH DO NOT REQUIRE A PERMIT SO |
| | PLEASE CONTACT THE CITY OF WPB UTILITIES AT |
| | 561-822-2240 FOR FURTHER DIRECTIONS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |