| Plan Review Stops For Permit 20071376 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-11-04 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-04 |
Time |
15:01 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-04 |
Time |
11:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2020-11-04 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-04 |
Time |
14:57 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-04 |
Time |
14:55 |
Sent To |
|
|
| Notes |
| 2020-11-04 15:01:36 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | MECHANICAL REVIEW APPROVED WITH PROVISOS: | | | | | | 1) AT TIME OF INSPECTION PROVIDE ENGINEER SIGNED/SEALED | | | TIE DOWN DETAILS ON-SITE FOR THE ROOF TOP UNITS | | | INCLUDING WINDLOADS. | | | 2) AT TIME OF INSPECTION MANUFACTURER'S SPECIFICATIONS | | | MUST BE ON-SITE. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
|
Date |
2020-11-05 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-11-04 |
Time |
14:56 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-11-04 |
Time |
14:56 |
Sent To |
|
|
| Notes |
|
|
|