Plan Review Details - Permit 20070812
Plan Review Stops For Permit 20070812
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-08-18 Cont ID  
Sent By rmcphers Date 2020-08-18 Time 10:04 Rev Time 0.00
Received By rmcphers Date 2020-08-18 Time 09:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-08-07 Cont ID  
Sent By jleahy Date 2020-08-07 Time 17:00 Rev Time 0.00
Received By jleahy Date 2020-08-07 Time 17:00 Sent To  
Notes
2020-08-07 17:01:07PLAN NOT SIGNED JLEAHY

Review Stop G GAS REVIEW
Rev No 2 Status N Date 2020-08-28 Cont ID  
Sent By dbattles Date 2020-08-28 Time 13:40 Rev Time 0.00
Received By dbattles Date 2020-08-28 Time 13:40 Sent To  
Notes
2020-08-28 13:43:14GAS PERMIT TO BE UNDER SEPARATE PERMIT.
 NO GAS DOCUMENTS WERE PROVIDED IN MASTER 20070812 SO
 DRAWINGS AND SPECIFICATIONS TO BE PROVIDED IN FUTURE
 GAS PERMIT.

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-08-05 Cont ID  
Sent By abelisle Date 2020-08-05 Time 17:38 Rev Time 0.00
Received By abelisle Date 2020-08-05 Time 17:25 Sent To  
Notes
2020-08-05 18:07:468/5/2020 1ST GAS REVIEW **DENIED** WITH COMMENTS NOTE -
 A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME
 AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED
 UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1-SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2017 FBC FUEL GAS SEC.305.1 OR
 2017 FBC FUEL GAS RES. SEC. G2408.1.
  
 2-GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION 2017 FBC FUEL
 GAS SEC. 402.2 AND 301.3 OR 2017 FBC FUEL GAS RES. SEC.
 G2413.2 AND G2404.3.
  
 3-SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE PRESSURE
 REGULATORS. REGULATORS INSTALLED ON THE EXTERIOR OF THE
 BUILDING SHALL BE APPROVED FOR OUTDOOR INSTALLATION.
 2017 FBC FUEL GAS SEC.410.1 OR 2017 FBC FUEL GAS RES.
 SEC. G2421.1.
  
 4-GAS RISER DIAGRAM REQUIRED WPB AMENDMENTS TO THE FBC
 SEC. 107.3.5.3 (12) RESIDENTIAL GAS
  
 5-SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS
 APPLIANCES. WHERE IS COMBUSTION AIR PROVIDED BY THE
 BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR? 2017 FGC
 SEC.304.9.3 OR 2017 FBC R G2407.9.3. COMBINED
 COMBUSTION AIR AND VENTILATION AIR SYSTEM.
  
 6-TYPE OF GAS (LP OR NATURAL). WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 7-SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR
 EACH PIPE SIZE. WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 8-SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. A
 LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC FUEL GAS SEC.
 409.4, FBC FUEL GAS RES. SEC. G2420.4.
  
 9-I HAVE RESEARCHED CITY RECORDS BACK TO 0000 AND THERE
 IS NO RECORD OF A PERMIT FOR THE INSTALLATION OF ANY
 GAS AT THIS ADDRESS.SINCE THERE IS NO RECORD OF A
 PERMIT FOR THE GAS, THE EXISTING GAS LINES SHALL
 CONSIDERED AS NEW. WPB AMENDMENTS TO THE FBC SEC.
 105.1.
  
 10-WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION
 & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
  
  
 ATELYO BELISLE
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6695
  
2020-08-03 14:15:25GAS PERMIT APPLICATION SUBMITTED. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-18 Cont ID  
Sent By shill Date 2020-08-18 Time 13:18 Rev Time 0.00
Received By shill Date 2020-07-18 Time 14:14 Sent To  
Notes
2020-07-31 15:48:44CONVERTED TO DIGITAL. JG.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2020-09-10 Cont ID  
Sent By lmarchan Date 2020-09-10 Time 09:27 Rev Time 0.00
Received By lmarchan Date 2020-09-03 Time 09:53 Sent To  
Notes
2020-09-09 08:46:12RECEIPT - MU-2020-034192 - $22.46 - PAID
2020-09-03 09:54:049/3/20 EMAILED IMPACT FEE OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2020-08-18 Cont ID  
Sent By rmcphers Date 2020-08-18 Time 10:04 Rev Time 0.00
Received By rmcphers Date 2020-08-18 Time 10:04 Sent To  
Notes
2020-08-18 10:06:22PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-08-04 Cont ID  
Sent By medwards Date 2020-08-04 Time 09:02 Rev Time 0.00
Received By medwards Date 2020-08-04 Time 08:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-08-05 Cont ID  
Sent By abelisle Date 2020-08-05 Time 17:36 Rev Time 0.00
Received By abelisle Date 2020-08-05 Time 17:25 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2020-08-18 Cont ID  
Sent By rmcphers Date 2020-08-18 Time 10:09 Rev Time 0.00
Received By rmcphers Date 2020-08-18 Time 10:09 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-08-18 Cont ID  
Sent By rmcphers Date 2020-08-18 Time 10:06 Rev Time 0.00
Received By rmcphers Date 2020-08-18 Time 10:06 Sent To  
Notes
2020-08-03 11:07:43NOTE:
 CONVERTED TO DIGITAL. ONLY DRAWINGS SP, S1, S2 AND S3
 HAVE ENGINEER'S ORIGINAL EMBOSSED SEAL AND SIGNATURE.
 JG.

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-18 Cont ID  
Sent By rthermid Date 2020-08-18 Time   Rev Time  
Received By rthermid Date 2020-08-18 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved