| 2020-08-05 18:07:46 | 8/5/2020 1ST GAS REVIEW **DENIED** WITH COMMENTS NOTE - |
| | A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME |
| | AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED |
| | UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1-SUBMIT MANUFACTURER?S SPECIFICATION |
| | SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH 2017 FBC FUEL GAS SEC.305.1 OR |
| | 2017 FBC FUEL GAS RES. SEC. G2408.1. |
| | |
| | 2-GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION 2017 FBC FUEL |
| | GAS SEC. 402.2 AND 301.3 OR 2017 FBC FUEL GAS RES. SEC. |
| | G2413.2 AND G2404.3. |
| | |
| | 3-SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE PRESSURE |
| | REGULATORS. REGULATORS INSTALLED ON THE EXTERIOR OF THE |
| | BUILDING SHALL BE APPROVED FOR OUTDOOR INSTALLATION. |
| | 2017 FBC FUEL GAS SEC.410.1 OR 2017 FBC FUEL GAS RES. |
| | SEC. G2421.1. |
| | |
| | 4-GAS RISER DIAGRAM REQUIRED WPB AMENDMENTS TO THE FBC |
| | SEC. 107.3.5.3 (12) RESIDENTIAL GAS |
| | |
| | 5-SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| | APPLIANCES. WHERE IS COMBUSTION AIR PROVIDED BY THE |
| | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR? 2017 FGC |
| | SEC.304.9.3 OR 2017 FBC R G2407.9.3. COMBINED |
| | COMBUSTION AIR AND VENTILATION AIR SYSTEM. |
| | |
| | 6-TYPE OF GAS (LP OR NATURAL). WPB AMENDMENTS TO THE |
| | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 7-SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 8-SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. A |
| | LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. 2017 FBC FUEL GAS SEC. |
| | 409.4, FBC FUEL GAS RES. SEC. G2420.4. |
| | |
| | 9-I HAVE RESEARCHED CITY RECORDS BACK TO 0000 AND THERE |
| | IS NO RECORD OF A PERMIT FOR THE INSTALLATION OF ANY |
| | GAS AT THIS ADDRESS.SINCE THERE IS NO RECORD OF A |
| | PERMIT FOR THE GAS, THE EXISTING GAS LINES SHALL |
| | CONSIDERED AS NEW. WPB AMENDMENTS TO THE FBC SEC. |
| | 105.1. |
| | |
| | 10-WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION |
| | & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |
| 2020-08-03 14:15:25 | GAS PERMIT APPLICATION SUBMITTED. JG. |