Plan Review Details - Permit 20070717
Plan Review Stops For Permit 20070717
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-08-07 Cont ID  
Sent By rmcdouga Date 2020-08-07 Time 13:47 Rev Time 0.00
Received By rmcdouga Date 2020-08-07 Time 13:47 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-08-11 Cont ID  
Sent By jleahy Date 2020-08-11 Time 11:09 Rev Time 0.00
Received By jleahy Date 2020-08-11 Time 11:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-09 Cont ID  
Sent By lmarchan Date 2020-09-09 Time 11:34 Rev Time 0.00
Received By lmarchan Date 2020-08-14 Time 10:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-13 Cont ID  
Sent By lmarchan Date 2020-08-13 Time 10:36 Rev Time 0.00
Received By lmarchan Date 2020-07-20 Time 10:25 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-08-05 Cont ID  
Sent By lcrespo Date 2020-08-05 Time 13:02 Rev Time 0.00
Received By lcrespo Date 2020-08-05 Time 12:33 Sent To  
Notes
2020-08-05 13:03:1008/05/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEW
 AVAILABLE FROM 6:30 AM TO 7:30 AM / 2:00 PM TO 5:00 PM
 EMAIL: [email protected] CELL: 561-701-6437
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-09-09 Cont ID  
Sent By medwards Date 2020-09-09 Time 11:10 Rev Time 0.00
Received By medwards Date 2020-09-09 Time 11:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-08-13 Cont ID  
Sent By medwards Date 2020-08-13 Time 10:30 Rev Time 0.00
Received By medwards Date 2020-08-13 Time 10:30 Sent To  
Notes
2020-08-13 10:33:15DIGITALLY SUBMITTED DRAWINGS MUST BE DIGITALLY SIGNED
 AND SEAL BY THE DESIGNER, THE SURVEY DRAWING DOES NOT
 HAVE A DIGITALLY SIGNED AND SEALED DRAWING.
 PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN
 IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON
 RESPONSIBLE FOR THE DESIGN. A DIGITAL PLAN REQUIRES A
 DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY
 VERIFICATION. PROVIDE CORRECTION. ALTERNATIVELY, A
 SIGNED/SEALED PAPER SET MAY BE SUPPLIED TO THE BUILDING
 DEPARTMENT WHEN ALL TRADES ARE APPROVED. WPB FBC 107.1;
 FS 471/481
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2020-09-04 Cont ID  
Sent By kalexand Date 2020-09-04 Time 19:15 Rev Time 0.00
Received By kalexand Date 2020-09-04 Time 19:14 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-13 Cont ID  
Sent By kalexand Date 2020-08-13 Time 08:23 Rev Time 0.00
Received By kalexand Date 2020-08-13 Time 08:23 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved