Plan Review Details - Permit 20070715
Plan Review Stops For Permit 20070715
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-09-02 Cont ID  
Sent By ppetty Date 2020-09-02 Time 09:41 Rev Time 0.00
Received By ppetty Date 2020-09-02 Time 09:22 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-08-10 Cont ID  
Sent By ppetty Date 2020-08-10 Time 14:31 Rev Time 0.00
Received By ppetty Date 2020-08-10 Time 13:41 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-08-24 Cont ID  
Sent By pleduc Date 2020-08-24 Time   Rev Time 0.00
Received By pleduc Date 2020-08-24 Time 10:17 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-07-23 Cont ID  
Sent By pleduc Date 2020-07-23 Time   Rev Time 0.00
Received By pleduc Date 2020-07-23 Time 14:08 Sent To  
Notes
2020-07-23 14:24:26THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) AS THIS APPEARS TO BE A MINIMALL SYSTEM, PLEASE
 PROVIDE A SCOPE OF WORK AND INTENT OF THIS SYSTEM.
  
 WHAT IS IT PROTECTING?
  
 IS IT A FIRE SPRINKLER ALARM?
  
  
 2) THERE APPEARS TO BE A 2ND DOOR.
  
 DOES THIS DOOR REPRESENT AN EXIT AND REQUIRES A PULL
 STATION?
  
  
 3) IS THE SITE PALN ACCURATE IN THAT THERE ARE NO
 WALLS, COLUMNS, RACKS, SMALL OFFICES, RESTROOMS, ETC.
 OR OTHER OBSTRUCTIONS?
  
 PLEAS PROVIDE APPLICABLE DETAILS.
  
  
 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-02 Cont ID  
Sent By ppetty Date 2020-09-02 Time 10:23 Rev Time 0.00
Received By ppetty Date 2020-08-20 Time 16:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-10 Cont ID  
Sent By ppetty Date 2020-08-10 Time 14:31 Rev Time 0.00
Received By ppetty Date 2020-07-22 Time 09:39 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-09-02 Cont ID  
Sent By ppetty Date 2020-09-02 Time 10:23 Rev Time 0.00
Received By ppetty Date 2020-09-02 Time 10:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-08-13 Cont ID  
Sent By medwards Date 2020-08-13 Time 14:52 Rev Time 0.00
Received By medwards Date 2020-08-13 Time 13:59 Sent To  
Notes
2020-08-13 15:03:50DESIGNER OF SYSTEM MUST DIGITALLY SIGN AND SEAL
 DRAWINGS.
 PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN
 IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON
 RESPONSIBLE FOR THE DESIGN. A DIGITAL PLAN REQUIRES A
 DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY
 VERIFICATION. PROVIDE CORRECTION. ALTERNATIVELY, A
 SIGNED/SEALED PAPER SET MAY BE SUPPLIED TO THE BUILDING
 DEPARTMENT WHEN ALL TRADES ARE APPROVED. WPB FBC 107.1;
 FS 471/481
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved