Plan Review Details - Permit 20070444
Plan Review Stops For Permit 20070444
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-08-19 Cont ID  
Sent By jwitmer Date 2020-08-19 Time 15:47 Rev Time 0.00
Received By jwitmer Date 2020-08-19 Time 15:16 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-07-14 Cont ID  
Sent By jwitmer Date 2020-07-14 Time 10:32 Rev Time 0.00
Received By jwitmer Date 2020-07-14 Time 08:30 Sent To  
Notes
2020-07-14 10:32:20WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION
 SERVICES/ BUILDING DIVISION
 2017 FBC- BUILDING PLAN REVIEW
 W. P. B. REVISION: 20070444
 W. P. B. PERMIT: 19021186
 ADD: 3200 N. MILITARY TRL.
 CONT: KAST
 TEL: 561-568-8045 / CONTACT: MIKE SANCHEZ
 E-MAIL: [email protected]
  
 2017 FLORIDA BUILDING CODE W 2017 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2017 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: TUES. JULY 14TH/ 2020
 ACTION: DENIED
  
 1) SHEET A0.1 CODE REVIEW INDICATES THIS BUILDING IS A
 TYPE 2A CONSTRUCTION. THE STRUCTURAL ELEMENTS STATE
 THAT ALL COLUMNS, BEAMS AND ROOF TRUSSES/ BAR JOIST ARE
 TO BE 1 HOUR PROTECTED. SHEET A6.0 SHOWS THE USE OF
 METAL TRUSSES BUT NO MENTION OF A FIRE RATING. 2017
 FBC-B TABLE 601 ROOF CONSTRUCTION AND ASSOCIATED
 SECONDARY MEMBERS. THERE ARE OTHER SIMILAR DETAILS ON
 OTHER SHEETS WITH THE SAME CODE ISSUE.
  
 2) SHEET A6.0 DETAIL 16 ALSO SHOWS PLYWOOD SHEATHING
 SANDWICHED BETWEEN THE METAL B DECKING. AND THE SPANISH
 STYLE CERAMIC ROOF TILES. IN THE S SHEETS THERE IS
 SIMILAR DETAILS SHEET S6,2 DETAIL 22 THAT SHOWS THE USE
 OF 5/8 INCH PLYWOOD SHEATHING. IN THE 2017 FBC-B
 SECTION 603.1.1.1.3 DOES ALLOW THE USE OF FIRE
 RETARDANT TREATED PLYWOOD FOR ROOF DECKING. SECTION
 718.5 ALSO CONFIRMS WHAT COMBUSTIBLE MATERIALS CAN BE
 USED IN CONCEALED SPACES. SEE EXCEPTION 1 ALLOWING
 COMBUSTIBLE MATERIALS IN CONCEALED SPACES IN ACCORDANCE
 WITH SECTION 603 OF THE 2017 FBC-B. THERE ARE OTHER
 SIMILAR DETAILS ON OTHER SHEETS WITH THE SAME CODE
 ISSUE.
  
  
  
 3) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 PLEASE NOTE WE ARE WORKING FROM HOME BECAUSE OF COVID
 19 IF YOU
 WOULD LIKE TO CONTACT ME, MY CELL NUMBER IS
 561-718-9724.
  
 JAMES A. WITMER BN, PX, SFP, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 BUILDING DIVISION / DEVELOPMENT SERVICES DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-07-22 Cont ID  
Sent By jleahy Date 2020-07-22 Time 12:29 Rev Time 0.00
Received By jleahy Date 2020-07-22 Time 12:21 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-08-13 Cont ID  
Sent By pleduc Date 2020-08-13 Time   Rev Time 0.00
Received By pleduc Date 2020-08-13 Time 13:27 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-07-14 Cont ID  
Sent By pleduc Date 2020-07-14 Time   Rev Time 0.00
Received By pleduc Date 2020-07-13 Time 14:19 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2020-09-23 Cont ID  
Sent By lcrespo Date 2020-09-23 Time 15:27 Rev Time 0.00
Received By lcrespo Date 2020-09-23 Time 15:27 Sent To  
Notes
2020-09-23 15:28:0409/23/20 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2020-08-21 Cont ID  
Sent By tklarge Date 2020-08-21 Time 13:00 Rev Time 0.00
Received By tklarge Date 2020-08-21 Time 06:52 Sent To  
Notes
2020-08-21 13:00:321) IF COMBUSTION AIR IS BEING PROVIDED BY THE
 BUILDING'S MECHANICAL VENTILATION SYSTEM,THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR. FBC-FUEL GAS
 SEC. 304.9.3. PROVIDE THIS INFORMATION FOR REVIEW. THE
 PLAN NOTES THAT AHU -5 & AHU-1 IS SUPPLYING COMBUSTION
 AIR FOR THE DRYERS. IS THIS UNIT DEDICATED TO SUPPLY
 JUST THE COMBUSTION AIR FOR THE DRYERS? SHOW COMPLIANCE
 WITH FBC-FUEL GAS SEC. 304.9.2.
 2) EACH OF THE APPLIANCES SERVED SHALL BE INTERLOCKED
 WITH THE MECHANICAL AIR SUPPLY SYSTEM TO PREVENT MAIN
 BURNER OPERATION OPERATION WHEN THE MECHANICAL AIR
 SUPPLY SYSTEM IS NOT IN OPERATION. FBC-FUEL GAS
 SEC.304.9.2.
 3) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN ONE FOOT OF EITHER SIDE OF THE
 PRESSURE REGULATOR. FBC-FUEL GAS SEC.410.2 (7). A UNION
 WAS PLACED ON THE UTILITY SIDE OF THE GAS METER WHICH
 FALLS UNDER THE GAS UTILITY WHICH WAS NOT IN MY REVIEW
 COMMENT AND NO UNIONS ARE SHOWN AT THE REGULATORS AS
 PREVIOUSLY REQUESTED. 2ND REQUEST.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-08-04 Cont ID  
Sent By tklarge Date 2020-08-04 Time 08:41 Rev Time 0.00
Received By tklarge Date 2020-08-04 Time 08:41 Sent To  
Notes
2020-08-04 08:49:361) ACCORDING TO MY CALCULATIONS, THE BTU LOAD FOR THE
 GAS SYSTEM IS 2,775,000 BTU'S. REVISE THE BTU LOAD ON
 SHT. P4.7.
 2) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN ONE FOOT OF EITHER SIDE OF THE
 PRESSURE REGULATOR. FBC-FUEL GAS SEC.410.2 (7).
 3) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED
 DRYER.FBC-FUEL GAS SEC.304.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-09-23 Cont ID  
Sent By lcrespo Date 2020-09-23 Time 15:28 Rev Time 0.00
Received By lcrespo Date 2020-09-21 Time 07:31 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-08-25 Cont ID  
Sent By lmarchan Date 2020-08-25 Time 06:55 Rev Time 0.00
Received By lmarchan Date 2020-08-12 Time 07:11 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-04 Cont ID  
Sent By lmarchan Date 2020-08-04 Time 10:15 Rev Time 0.00
Received By lmarchan Date 2020-07-10 Time 15:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2020-09-22 Cont ID  
Sent By medwards Date 2020-09-22 Time 13:07 Rev Time 0.00
Received By medwards Date 2020-09-22 Time 12:35 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-07-17 Cont ID  
Sent By pvalenti Date 2020-07-17 Time 13:46 Rev Time 0.00
Received By medwards Date 2020-07-17 Time 13:36 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2020-09-23 Cont ID  
Sent By lcrespo Date 2020-09-23 Time 15:28 Rev Time 0.00
Received By lcrespo Date 2020-09-23 Time 15:28 Sent To  
Notes
2020-09-23 15:28:5709/23/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-08-21 Cont ID  
Sent By tklarge Date 2020-08-21 Time 06:51 Rev Time 0.00
Received By tklarge Date 2020-08-21 Time 06:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-08-04 Cont ID  
Sent By tklarge Date 2020-08-04 Time 08:41 Rev Time 0.00
Received By tklarge Date 2020-07-30 Time 09:36 Sent To  
Notes
2020-07-31 06:56:591) SHT. A7.4 - DETAILS #23 & #19 - THE KNEE CLEARANCE
 SHALL BE 8 INCHES DEEP MINIMUM AT 27 INCHES ABOVE THE
 FINISH FLOOR OR GROUND PER FBC-ACCESS. SEC.306.3.3 AND
 FIGURE 306.3. THE PLAN SHOWS 6 INCHES.
 2) SHT. A7.4 - DETAILS #10, #14, & #21 - THE MINIMUM
 HEIGHT OF THE GRAB BAR IS SHOWN AS 2 FEET 8 INCHES. THE
 MINIMUM HEIGHT IS 33 INCHES ( 2 FEET 9 INCHES) PER
 FBC-ACCESS. SEC. 609.4.
 3) MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS
 SHALL BE INSTALLED WITH THE BOTTOM EDGE OF THE
 REFLECTING SURFACE 40 INCHES MAXIMUM ABOVE THE FINISH
 FLOOR OR GROUND. FBC-ACCESS. SEC.603.3.
 4) SHT. P3.1 - SHOW THE CONTINUATION POINT OF THE 3/4
 INCH GAS LINE. WPB AMEND. TO FBC SEC. 107.2.1.
 5) SUBMIT A REVISED WATER AND SANITARY RISER SHOWING
 THE ADDED TUB IN THE GROOMING ROOM.WPB AMEND. TO FBC
 SEC. 107.3.5.1.3.
 6) THE HOT WATER SUPPLIED TO BATHTUBS SHALL BE LIMITED
 TO A MAXIMUM TEMPERATURE OF 120 DEGREES BY A WATER
 -TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE 1070
 OR CSA B125.3 PER FBC-PLUMBING SEC.424.5.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-09-23 Cont ID  
Sent By lcrespo Date 2020-09-23 Time 15:28 Rev Time 0.00
Received By lcrespo Date 2020-09-23 Time 15:28 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-08-25 Cont ID  
Sent By tklarge Date 2020-08-25 Time 04:18 Rev Time 0.00
Received By tklarge Date 2020-08-25 Time 04:16 Sent To  
Notes
2020-08-25 04:16:57SIGNATURE AND SEAL REQUIRED ON SHT. SP-1.
 COULD NOT VERIFY SIGNATURE ON SHEETS A1.2 & A9.0.
 T.LARGE 8/25/2020.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-07-20 Cont ID  
Sent By medwards Date 2020-07-17 Time 14:34 Rev Time 0.00
Received By medwards Date 2020-07-20 Time 10:34 Sent To  
Notes
2020-07-20 10:36:35SIGNATURE AND SEAL NOT REQUIRED ON SP-1
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  
2020-07-17 14:34:04DESIGNER MUST SIGN AND SEAL SHEET SP-1. FBC FS 471
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-03 Cont ID  
Sent By eschneid Date 2020-08-03 Time 12:03 Rev Time 0.50
Received By eschneid Date 2020-08-03 Time 12:03 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved