Plan Review Details - Permit 20070135
Plan Review Stops For Permit 20070135
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-08-04 Cont ID  
Sent By rmcphers Date 2020-08-04 Time 10:52 Rev Time 0.00
Received By rmcphers Date 2020-08-04 Time 10:52 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-07-27 Cont ID  
Sent By rmcphers Date 2020-07-27 Time 13:20 Rev Time 0.00
Received By rmcphers Date 2020-07-27 Time 13:20 Sent To  
Notes
2020-07-27 13:25:54POOL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT
 (GEOTECHNICAL REPORT) AS NOTED ON THE DRAWINGS.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-07-29 Cont ID  
Sent By jleahy Date 2020-07-29 Time 14:01 Rev Time 0.00
Received By jleahy Date 2020-07-29 Time 13:56 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-07-28 Cont ID  
Sent By lcrespo Date 2020-07-28 Time 12:03 Rev Time 0.00
Received By lcrespo Date 2020-07-28 Time 12:03 Sent To  
Notes
2020-07-28 12:03:49GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2020-07-15 Cont ID  
Sent By fmittner Date 2020-07-15 Time 13:54 Rev Time 0.00
Received By fmittner Date 2020-07-15 Time 13:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-08-04 Cont ID  
Sent By lcrespo Date 2020-08-04 Time 10:07 Rev Time 0.00
Received By lcrespo Date 2020-07-30 Time 11:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-29 Cont ID  
Sent By ccarvaja Date 2020-07-29 Time 18:35 Rev Time 0.00
Received By ccarvaja Date 2020-07-14 Time 08:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-08-04 Cont ID  
Sent By lcrespo Date 2020-08-04 Time 09:47 Rev Time 0.00
Received By lcrespo Date 2020-08-04 Time 09:47 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-07-28 Cont ID  
Sent By lcrespo Date 2020-07-28 Time 12:57 Rev Time 0.00
Received By lcrespo Date 2020-07-28 Time 12:03 Sent To  
Notes
2020-07-28 13:03:4707/28/2019 1ST PLUMBING/POOL REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS
 SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS
 IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE
 TDH CALCULATIONS PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 2. A BACKFLOW (PVB) IS REQUIRED ON THE AUTOFILL PER THE
 2017 FBC-PLUMBING SEC.608.1 AND A REDUCE PRESSURE ZONE
 VACUUM BREAKER ASSEMBLY IS REQUIRED AT METER PER THE
 CITY OF WEST PALM BEACH CROSS CONNECTION PROGRAM.
  
 3. PLANS SHOW A POOL HEATER PLEASE CLARIFY IS IT GAS OR
 IS IT ELECTRIC, AS A GAS AND SPA HEATERS SHALL HAVE A
 MINIMUM THERMAL EFFICIENCY OF 82 % AND AS A HEAT PUMP
 POOL HEATERS SHALL HAVE A MINIMUM COP OF 4.0 WHEN
 TESTED IN ACCORDANCE WITH AHRI 1160 PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 4. IF THERE IS A POOL HEATER, PLEASE PROVIDE
 SPECIFICATIONS PER THE WPB AMENDMENTS TO FBC SEC.
 107.2.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status P Date 2020-07-29 Cont ID  
Sent By rgathrig Date 2020-07-29 Time 18:19 Rev Time 0.00
Received By rgathrig Date 2020-07-29 Time 18:16 Sent To  
Notes
2020-07-29 18:18:36PRIVATE PROVIDER IS PLANNING AND BUILDING CONSULTANTS
 LLC (STEVE KENNEDY) BU587 PX808 BN1845

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-08-04 Cont ID  
Sent By lcrespo Date 2020-08-04 Time 10:06 Rev Time 0.00
Received By lcrespo Date 2020-08-04 Time 10:06 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-07-27 Cont ID  
Sent By rmcphers Date 2020-07-27 Time 13:27 Rev Time 0.00
Received By rmcphers Date 2020-07-27 Time 13:27 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-07-15 Cont ID  
Sent By fmittner Date 2020-07-15 Time 13:55 Rev Time 0.00
Received By fmittner Date 2020-07-15 Time 13:55 Sent To  
Notes
2020-07-15 13:55:42NOTE POOL EDGE MUST BE A MINIMUM OF 5' OFF ALL PORTION
 OF REAR PROPERTY LINE.