| Plan Review Stops For Permit 20070049 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
P |
Date |
2020-08-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-27 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-27 |
Time |
13:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2020-08-19 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-19 |
Time |
14:33 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-19 |
Time |
14:33 |
Sent To |
|
|
| Notes |
| 2020-08-19 14:34:41 | WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | 5TH REVIEW - PLEASE READ THE CORRECTION COMMENTS | | | CAREFULLY | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN | | | PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED | | | POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR | | | THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM | | | PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS | | | THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES | | | SHOWN ON THE "ENGINEERING EXPRESS" DOCUMENT PROVIDED. | | | 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING | | | EXPRESS" = | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG | | | WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON | | | FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected] | | | AND ASKING FOR THE FORM. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2020-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-03 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-03 |
Time |
14:09 |
Sent To |
|
|
| Notes |
| 2020-08-03 14:13:27 | WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | 4TH REVIEW - PLEASE READ THE CORRECTION COMMENTS | | | CAREFULLY | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN | | | PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED | | | POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR | | | THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM | | | PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS | | | THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES | | | SHOWN ON THE "ENGINEERING EXPRESS" DOCUMENT PROVIDED. | | | 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING | | | EXPRESS" = | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG | | | WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON | | | FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected] | | | AND ASKING FOR THE FORM. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2020-07-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-24 |
Time |
11:29 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-24 |
Time |
11:28 |
Sent To |
|
|
| Notes |
| 2020-07-24 11:29:10 | WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN | | | PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED | | | POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR | | | THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM | | | PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS | | | THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES. | | | 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING | | | EXPRESS" = | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG | | | WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON | | | FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected] | | | AND ASKING FOR THE FORM. (AT THIS TIME DROP BOX ITEMS | | | MAY TAKE 2 TO 3 WEEKS TO PROCESS, TO SEND TO PLAN | | | REVIEW - DUE TO LIMITED STAFF INSIDE THE BUILDING | | | DEPT.) |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-07-15 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-15 |
Time |
14:44 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-15 |
Time |
14:44 |
Sent To |
|
|
| Notes |
| 2020-07-15 14:51:11 | WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN | | | PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED | | | POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR | | | THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM | | | PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS | | | THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES. | | | 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING | | | EXPRESS" = | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG | | | WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON | | | FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected] | | | AND ASKING FOR THE FORM. (AT THIS TIME DROP BOX ITEMS | | | MAY TAKE 2 TO 3 WEEKS TO PROCESS, TO SEND TO PLAN | | | REVIEW - DUE TO LIMITED STAFF INSIDE THE BUILDING | | | DEPT.) | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2020-07-06 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-06 |
Time |
14:25 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-06 |
Time |
14:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2020-08-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-27 |
Time |
13:22 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-25 |
Time |
14:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2020-08-19 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-19 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-04 |
Time |
11:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2020-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-03 |
Time |
14:14 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-24 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-07-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-24 |
Time |
11:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-16 |
Time |
11:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-07-15 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-15 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-08 |
Time |
11:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-07-06 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-06 |
Time |
14:26 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-02 |
Time |
10:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
6 |
Status |
P |
Date |
2020-08-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-27 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-27 |
Time |
13:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
F |
Date |
2020-08-19 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-19 |
Time |
14:34 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-19 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2020-08-19 14:35:12 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2020-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-03 |
Time |
14:13 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-03 |
Time |
14:13 |
Sent To |
|
|
| Notes |
| 2020-08-03 14:14:11 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2020-07-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-24 |
Time |
11:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-24 |
Time |
11:29 |
Sent To |
|
|
| Notes |
| 2020-07-24 11:30:41 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-07-15 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-15 |
Time |
14:51 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-15 |
Time |
14:51 |
Sent To |
|
|
| Notes |
| 2020-07-15 14:51:46 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-07-06 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-06 |
Time |
14:25 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-06 |
Time |
14:25 |
Sent To |
|
|
| Notes |
| 2020-07-06 14:26:24 | WIND DESIGN PRESSURES PROVIDED = DRAWINGS/DOCUMENTS | | | NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED BY THE | | | ENGINEER OR ARCHITECT TO BE USED IN ELECTRONIC PLAN | | | REVIEW. DRAWINGS/DOCUMENTS DO NOT SHOW IN "ADOBE | | | READER" AS DIGITALLY/ELECTRONICALLY SIGNED. WHEN | | | PRINTED OUT THE DIGITAL/ELECTRONIC SIGNATURE IS LOST - | | | THEY MUST TRAVEL FROM COMPUTER TO COMPUTER | | | (PROJECTDOX). |
|
|