| Plan Review Stops For Permit 20061444 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2020-10-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-21 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-21 |
Time |
09:08 |
Sent To |
|
|
| Notes |
| 2020-10-21 09:17:15 | APPROVED WITH EXCEPTIONS. BUILDING PROVISO. | | | | | | 1) A SEPARATE PERMIT APPLICATION, PLANS AND REVIEW IS | | | REQUIRED FOR THE FABRIC AND ITS ATTACHMENT TO THE THE | | | METAL FRAMES. THE FABRIC SCEEN MEMBRANE SHALL BE | | | DESIGNED FOR QUICK REMOVAL OR BREAKAWAY AT WIND | | | VELOCITIES OF 75 MPH. FBC 107 & 3105.4 | | | | | | 2) WORKING CLEARANCES SHALL BE MAINTAINED AROUND THE | | | EQUIPMENT THAT IS BEING SCREENED. FBCM 303.12 & FBC 107 | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2020-08-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-08-20 |
Time |
15:18 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-20 |
Time |
15:18 |
Sent To |
|
|
| Notes |
| 2020-08-20 15:22:29 | PLAN | | | REVIEW COMMENTS | | | | | | 3RD REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | PREVIOUS COMMENT WAS NOT ADDRESSED. THE DRAWINGS NEED | | | TO BE SIGNED AND SEALED BY THE DELEGATED ENGINEER AND | | | THE DESIGNER OF RECORD FOR THE PROJECT IS REQUIRED TO | | | REVIEW AND APPROVE THE DESIGN AND PLACE THEIR SHOP | | | DRAWING REVIEW STAMP ON THE DRAWINGS. SHEETS S-1, S-2, | | | S-3 & S-4 ARE NOT SIGNED BY THE ENGINEER WHOSE NAME, | | | MILTON CUBAS P.E., APPEARS ON THE DRAWINGS. | | | | | | 1) THE WIND SCREEN DRAWINGS ARE REQUIRED TO BE REVIEWED | | | AND APPROVED BY THE DESIGNER OF RECORD FOR THE PROJECT | | | (SHOP DRAWING REVIEW). FBC CITY AMENDMENTS 107.3.4 | | | | | | 2) THIS PERMIT IS FOR THE INSTALLATION OF THE METAL | | | FARMES ONLY. NO INFORMATION HAS BEEN PROVIDED FOR THE | | | FABRIC COVERING AND IT'S ATTACHMENT OR REMOVAL. A | | | SEPARATE PERMIT APPLICATION, PLANS AND REVIEW IS | | | REQUIRED FOR THE FABRIC AND ITS ATTACHMENT TO THE THE | | | METAL FRAMES. FBC 107 | | | | | | 3) IT WILL BE HELPFUL TO PROVIDE A RESPONSE LETTER | | | ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL | | | FORM. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-07-31 |
Time |
16:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-31 |
Time |
15:35 |
Sent To |
|
|
| Notes |
| 2020-07-31 16:04:44 | PLAN | | | REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | PREVIOUS COMMENT WAS NOT ADDRESSED. THE DRAWINGS NEED | | | TO BE SIGNED AND SEALED BY THE DELEGATED ENGINEER AND | | | THE DESIGNER OF RECORD FOR THE PROJECT IS REQUIRED TO | | | REVIEW AND APPROVE THE DESIGN AND PLACE THEIR SHOP | | | DRAWING REVIEW STAMP ON THE DRAWINGS. | | | | | | 1) THE WIND SCREEN DRAWINGS ARE REQUIRED TO BE REVIEWED | | | AND APPROVED BY THE DESIGNER OF RECORD FOR THE PROJECT. | | | FBC CITY AMENDMENTS 107.3.4 | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-07-17 |
Time |
13:12 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-17 |
Time |
13:12 |
Sent To |
|
|
| Notes |
| 2020-07-17 13:13:14 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE WIND SCREEN DRAWINGS ARE REQUIRED TO BE REVIEWED | | | AND APPROVED BY THE DESIGNER OF RECORD FOR THE PROJECT. | | | FBC CITY AMENDMENTS 107.3.4 | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2020-07-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-07-07 |
Time |
09:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-07 |
Time |
08:02 |
Sent To |
|
|
| Notes |
| 2020-07-07 08:18:57 | APPROVED WITH EXCEPTIONS. BUILDING PROVISO. | | | | | | 1) A SEPARATE PERMIT APPLICATION, PLANS AND REVIEW IS | | | REQUIRED FOR THE FABRIC AND ITS ATTACHMENT TO THE THE | | | METAL FRAMES. FBC 107 | | | | | | 2) WORKING CLEARANCES SHALL BE MAINTAINED AROUND THE | | | EQUIPMENT THAT IS BEING SCREENED. FBCM 303.12 & FBC 107 | | | | | | WELDING COMMENTS | | | | | | AWS D1.1 CLAUSE 3.1: AT TIME OF INSPECTION PLEASE | | | PROVIDE A WELD PROCEDURE SPECIFICATION; THE W.P.S. | | | SPECIFIES THE REQUIRED ESSENTIAL VARIABLES INCLUDING: | | | BASE MATERIALS, JOINTS, PROCESS, AND FILLER METALS TO | | | BE USED. | | | | | | AWS D1.1 CLAUSE 4.15: AT TIME OF INSPECTION PLEASE | | | PROVIDE A WELDER PERFORMANCE QUALIFICATION RECORD; THE | | | W.P.Q.R. PROVIDES INFORMATION WHICH CAN BE USED TO | | | VERIFY THE WELDER?S QUALIFICATION AND CERTIFICATION AS | | | IT RELATES TO THE WELDING REQUIREMENTS OF THE PROJECT. | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2020-10-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-21 |
Time |
09:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-14 |
Time |
16:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2020-08-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-08-20 |
Time |
15:48 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-10 |
Time |
14:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-07-31 |
Time |
16:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-29 |
Time |
09:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-07-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-07-20 |
Time |
09:25 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-07-13 |
Time |
09:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-07-07 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-07-07 |
Time |
10:20 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-06-30 |
Time |
12:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2020-10-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-10-21 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-10-21 |
Time |
09:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2020-08-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-08-20 |
Time |
15:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-20 |
Time |
15:18 |
Sent To |
|
|
| Notes |
| 2020-08-20 15:21:14 | THE 4 PAGES OF STRUCTURAL DRAWINGS FROM MILTON CUBAS | | | P.E. ARE NOT SIGNED AS REQUIRED BY FS 471 & FAC 61G-15. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-07-31 |
Time |
16:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-31 |
Time |
16:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-07-17 |
Time |
13:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-17 |
Time |
13:05 |
Sent To |
|
|
| Notes |
| 2020-07-17 13:06:29 | THE ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO | | | BE DIGITALLY SIGNED BY THE ENGINEER. FS 471 AND FAC | | | 61G15 | | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | | 61G15 | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-07-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-07-07 |
Time |
08:02 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-07 |
Time |
08:02 |
Sent To |
|
|
| Notes |
| 2020-07-07 08:05:18 | THE ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO | | | BE DIGITALLY SIGNED BY THE ENGINEER. FS 471 AND FAC | | | 61G15 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2020-08-19 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2020-08-19 |
Time |
09:29 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2020-08-19 |
Time |
09:29 |
Sent To |
|
|
| Notes |
| 2020-08-19 09:29:43 | PROVISO: SCREEN SHALL FULLY OBSCURE ANY MECHANICAL | | | EQUIPMENT LOCATED ON THE ROOF FROM ANY SURROUNDING | | | VIEW. | | | SCREEN SHALL BE AS TALL AS THE EQUIPMENT. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2020-08-13 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2020-08-13 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2020-08-13 |
Time |
15:57 |
Sent To |
|
|
| Notes |
| 2020-08-13 15:58:00 | PROVISO: SCREEN SHALL FULLY OBSCURE ANY MECHANICAL | | | EQUIPMENT LOCATED ON THE ROOF FROM ANY SURROUNDING | | | VIEW. | | | SCREEN SHALL BE AS TALL AS THE EQUIPMENT. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2020-07-17 |
Time |
14:49 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2020-07-17 |
Time |
14:49 |
Sent To |
|
|
| Notes |
| 2020-07-17 14:54:27 | PROVISO: 1. ALL MECHANICAL EQUIPMENT SHALL BE SCREENED | | | FROM VIEW FROM SURROUNDING BUILDINGS WITH A SCREEN AS | | | TALL AS THE EQUIPMENT. | | | 2. SCREEN SHALL BE SUFFICIENTTLY OPAQUE NOT TO ALLOW | | | THE VIEW OF THE EQUIPMENT BEHIND. IF PROPOSED SCREEN | | | STILL ALLOWS THE VIEW OF THE EQUIPMENT, SCREEN SHALL BE | | | REPLACED FOR A MORE SOLID MATERIAL. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2020-07-01 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2020-07-01 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2020-07-01 |
Time |
15:21 |
Sent To |
|
|
| Notes |
| 2020-07-01 15:25:24 | 1.PLEASE SUBMIT BUILDING ELEVATIONS THAT INCLUDE THE | | | EXISTING MECHANICAL EQUIPMENT TO BE SCREENED. INDICATE | | | THE HEIGHT OF THE MECHANICAL EQUIPMENT AND THE LOCATION | | | OF THE SCREEN. | | | 2. PLEASE PROVIDE PICTURES AND A SAMPLE OF PROPOSED | | | SCREEN. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|