| Plan Review Stops For Permit 20061436 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-08-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-27 |
Time |
12:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-27 |
Time |
12:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-08-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-21 |
Time |
12:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-21 |
Time |
12:35 |
Sent To |
|
|
| Notes |
| 2020-08-21 12:40:49 | SIGN | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) SIGNED AND SEALED ENGINEERING PROVIDED IS FOR SIGN | | | LABELED "C" - THIS PERMIT APPLICATION IS FOR SIGN | | | LABELED "B" - NEED SIGNED AND SEALED SIGN AND | | | FOUNDATION DETAILS FOR SIGN "B" FROM AN ENGINEER OR | | | ARCHITECT. (PLEASE SHOW THE WIND DESIGN DATA USED ON | | | THE DETAIL DRAWING) | | | | | | FYI = SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO | | | BE DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. - OR - | | | IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL | | | SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE | | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG | | | WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON | | | FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW | | | REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected] | | | AND ASKING FOR THE FORM. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-17 |
Time |
08:58 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-17 |
Time |
08:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-08-20 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2020-08-20 |
Time |
22:26 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2020-08-20 |
Time |
21:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-07-21 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-07-21 |
Time |
17:04 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-07-21 |
Time |
17:04 |
Sent To |
|
|
| Notes |
| 2020-07-21 17:09:33 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) VALUE OF PERMIT IS THE SIGN AND LABOR TO INSTALL | | | SIGN. SIGN, FOUNDATION, LABOR (2050) PERMIT VALUE IS | | | LOW. | | | | | | 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF | | | THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF | | | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, | | | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE | | | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE | | | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, | | | QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS | | | (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE | | | BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION | | | OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT | | | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, | | | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, | | | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, | | | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | | | 2) DISCONNECT REQUIRED FOR SIGN 600.6(A)(1) | | | | | | 3) CIRCUIT TO SIGN COMES FROM??? SHOW SIGN BRANCH | | | CIRCUIT AND LOCATION OF PANEL. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-08-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-21 |
Time |
12:43 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-03 |
Time |
16:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-07-21 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-07-21 |
Time |
17:09 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-06-30 |
Time |
16:05 |
Sent To |
|
|
| Notes |
| 2020-06-30 16:05:40 | ROUTED TO ZONING BIN |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-08-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-27 |
Time |
12:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-27 |
Time |
12:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-08-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-21 |
Time |
12:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-21 |
Time |
12:40 |
Sent To |
|
|
| Notes |
| 2020-08-21 12:41:16 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-07-10 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-07-10 |
Time |
14:49 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-07-10 |
Time |
14:49 |
Sent To |
|
|
| Notes |
| 2020-07-10 14:51:00 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | SIGNATURE REVIEW APPROVED BY ORIGINAL PAPER SUBMITTALS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2020-08-05 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2020-08-05 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2020-08-05 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2020-07-15 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2020-07-15 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
2020-07-15 |
Time |
|
Sent To |
|
|
| Notes |
|
|