| Plan Review Stops For Permit 20061324 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-08-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-12 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-12 |
Time |
09:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-31 |
Time |
14:04 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-31 |
Time |
14:04 |
Sent To |
|
|
| Notes |
| 2020-07-31 14:08:12 | SHUTTERS - | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | 2ND REVIEW - CORRECTIONS NEEDED - FBC WPB AMENDMENTS | | | 107 | | | 1) WIND DESIGN PRESSURES ARE BASED ON BUILDING ROOF | | | HEIGHT. THIS BUILDING IS A 10 STORY BUILDING. | | | 2) PLEASE SHOW THE BUILDING ROOF HEIGHT. | | | 3) PLEASE SHOW THE LOCATION OF THE UNIT WITHIN THE | | | BUILDING FOOT PRINT (AN INTERIOR OR END OF BUILDING | | | UNIT).- NEEDED TO DETERMINE IF THE WINDOWS ARE IN WIND | | | ZONE 4 OR 5. | | | 4) IF AN END UNIT - PLEASE SHOW THE DISTANCE FROM THE | | | CORNER OF THE BUILDING TO THE EDGE OF THE WINDOWS - | | | NEEDED TO DETERMINE IF THE WINDOWS ARE IN WIND ZONE 4 | | | OR 5. | | | 5) PLEASE SHOW THE LENGTH AND WIDTH OF THE ENTIRE | | | BUILDING - NEEDED TO DETERMINE IF THE WINDOWS ARE IN | | | WIND ZONE 4 OR 5. | | | 5) PLEASE PROVIDE SIGNED AND SEALED WIND DESIGN | | | PRESSURES FOR THE OPENINGS FROM AN ARCHITECT OR | | | ENGINEER - SHOWING THE WIND DESIGN CRITERIA USED FOR | | | DESIGN - FBC 1609 | | | 6) PLEASE REVISE THE "SCHEDULE FOR INSTALLATION OF | | | OPENINGS" TO REFLECT THE UPDATED WIND DESIGN PRESSURES | | | TO BE PROVIDED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-07-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-24 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-24 |
Time |
13:11 |
Sent To |
|
|
| Notes |
| 2020-07-24 13:14:29 | SHUTTERS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) WIND DESIGN PRESSURES ARE BASED ON BUILDING ROOF | | | HEIGHT. THIS BUILDING IS A 10 STORY BUILDING. | | | 2) PLEASE SHOW THE BUILDING ROOF HEIGHT. | | | 3) PLEASE SHOW THE LOCATION OF THE UNIT WITHIN THE | | | BUILDING FOOT PRINT (AN INTERIOR OR END OF BUILDING | | | UNIT).- NEEDED TO DETERMINE IF THE WINDOWS ARE IN WIND | | | ZONE 4 OR 5. | | | 4) IF AN END UNIT - PLEASE SHOW THE DISTANCE FROM THE | | | CORNER OF THE BUILDING TO THE EDGE OF THE WINDOWS - | | | NEEDED TO DETERMINE IF THE WINDOWS ARE IN WIND ZONE 4 | | | OR 5. | | | 5) PLEASE SHOW THE LENGTH AND WIDTH OF THE ENTIRE | | | BUILDING - NEEDED TO DETERMINE IF THE WINDOWS ARE IN | | | WIND ZONE 4 OR 5. | | | 5) PLEASE PROVIDE SIGNED AND SEALED WIND DESIGN | | | PRESSURES FOR THE OPENINGS FROM AN ARCHITECT OR | | | ENGINEER - SHOW THE WIND DESIGN CRITERIA USED FOR | | | DESIGN - FBC 1609 | | | 6) PLEASE REVISE THE "SCHEDULE FOR INSTALLATION OF | | | OPENINGS" TO REFLECT THE UPDATED WIND DESIGN PRESSURES | | | TO BE PROVIDED. | | | 7) PLEASE SHOW ON THE "SCHEDULE FOR INSTALLATION OF | | | OPENINGS" THE ATTACHMENT ON CENTER SPACING. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2020-08-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-12 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-07 |
Time |
08:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-08-07 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-08-07 |
Time |
06:51 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-08-03 |
Time |
07:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-31 |
Time |
14:12 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-24 |
Time |
16:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-07-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-24 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-17 |
Time |
09:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-08-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-08-12 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-08-12 |
Time |
09:41 |
Sent To |
|
|
| Notes |
| 2020-08-12 09:43:42 | EMERGENCY RULE APPLIED 61G15ER20-4 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-31 |
Time |
14:10 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-31 |
Time |
14:10 |
Sent To |
|
|
| Notes |
| 2020-07-31 14:11:26 | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | | ENGINEER OR ARCHITECT DOES NOT HAVE AN ELECTRONIC OR | | | DIGITAL SIGNATURE - PLEASE DROP OFF (CITY HALL DROP | | | BOX) THE ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS | | | ALONG WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE | | | REASON FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN | | | REVIEW REQUEST FORM CAN BE OBTAINED BY E MAILING | | | [email protected] AND ASKING FOR THE FORM |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-07-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-07-24 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-07-24 |
Time |
13:34 |
Sent To |
|
|
| Notes |
| 2020-07-24 13:34:25 | SEE BUILDING PLAN REVIEW |
|
|