Plan Review Details - Permit 20061164
Plan Review Stops For Permit 20061164
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-09-22 Cont ID  
Sent By rmcdouga Date 2020-09-22 Time 08:06 Rev Time 0.00
Received By rmcdouga Date 2020-09-21 Time 17:06 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-07-07 Cont ID  
Sent By rmcdouga Date 2020-07-07 Time 15:41 Rev Time 0.00
Received By rmcdouga Date 2020-07-06 Time 10:11 Sent To  
Notes
2020-07-07 11:36:582014 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: REVISION # 20061164 (TO PERMIT
 #17101193)
 ADD: 325 S. LAKESIDE CT. / 3 FLOORS OF RENOVATION
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION.
 2014 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING.
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THIS PROJECT WAS APPLIED FOR UNDER THE 2014 FLORIDA
 BUILDING CODE. THEREFORE, ALL REVISIONS AND SUBMITTALS
 SHALL SPECIFY THE 2014 FBC. SHEET T-1 SPECIFIES THE
 2017 FLORIDA BUILDING CODES. PLEASE CHANGE TO THE 2014
 FBC.
  
 2) SHEET T-1 INDICATES THAT THIS BUILDING IS
 UNPROTECTED AND UNSPRINKLERED. THIS BUILDING IS WOOD
 FRAME AND IS THREE (3) STORIES. THIS MAKES IT TYPE V-B
 CONSTRUCTION. FBC TABLE 503, REQUIRES A THREE STORY
 WOOD FRAME BUILDING WITH AN R-2 OCCUPANCY TYPE TO BE
 TYPE V-A CONSTRUCTION. THIS MEANS THAT THE BUILDING
 WILL HAVE TO BE PROTECTED IN ACCORDANCE WITH FBC 601 OR
 BE SPRINKLERED. SHOW HOW THIS ISSUE WILL BE RESOLVED.
  
 3) ON SHEET A-5 THE NEW GUARDS ARE SPECIED AS 14" HIGH,
 INSTEAD OF THE REQUIRED THE 42" THAT IS REQUIRED. FBC
 1013
  
 4) THE PLANS DO NOT APPEAR TO SHOW THE THERMAL
 INSULATION UNDER THE FIRST FLOOR, IN THE EXTERIOR
 WALLS, IN THE FLOOR CEILING ASSEMBLIES BETWEEN THE
 UNITS AND IN THE CEILING OF THE THIRD FLOOR UNITS. FBC
 -ENERGY CONSERVATION
  
 5) SPECIFY THE NUMBER AND TYPE OF ANCHORS THAT ARE
 REQUIRED TO ATTACH THE THE ROOF LADDER TO THE
 STRUCTURE. SPECIFY THE BACKING TO BE USED IF REQUIRED
 TO PROVIDE A SUBSTRATE FOR ANCHORS. FBC 107 & 1601
  
 6) PROVIDE THE LISTING INFORMATION FOR THE
 FLOOR/CEILING FIRE RATED ASSEMBLY L508 THAT IS
 SPECIFIED ON THE DRAWINGS. FBC 107 & 703
  
 7) PROVIDE FIRE STOPPING DETAILS FOR PENETRATIONS OF
 FIRE RATED ASSEMBLIES. FBC 107 & 701
  
 8) FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY FAC 61G20-3.001 PER
 FLORIDA STATUTE 553.842 (5) THAT HAVE BEEN REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD. PROVIDE
 COMPLETE PRODUCT APPROVALS WITH FL OR NOA NUMBERS
 INCLUDING INSTALLATION INSTRUCTIONS AND MAXIMUM DESIGN
 PRESSURES FOR EACH OF THE DIFFERENT ROOFING MATERIALS,
 WINDOW (GLASS TYPES), STRUCTURAL MULLIONS AND EXTERIOR
 DOOR TYPES. THESE ITEMS CAN BE DEFERRED IF REQUESTED,
 HOWEVER, THE DOCUMENTS MUST BE SUBMITTED AND APPROVED
 BY THE BUILDING DEPARTMENT BEFORE THEY CAN BE
 INSTALLED.
  
 9) SUBMIT THE SPECIFICATIONS AND INSTALLATION
 REQUIREMENTS FOR THE EPICORE FLOOR/CEILING SYSTEM. FBC
 107
  
 10) SUBMIT THE SPECIFICATIONS AND INSTALLATION
 REQUIREMENTS FOR THE WATER PROOFING MEMBRANE AT THE
 BALCONIES. FBC 107
  
 11) SUBMIT SHOP DRAWING FOR THE BALCONY AND STAIR
 GUARDS AND HANDRAILS. FBC 107 & 1013
  
 12) FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES
 OF THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS
 THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT
 THE TIME OF THE APPLICATION AND THAT ARE TO BE
 SUBMITTED TO THE BUILDING OFFICIAL WITHIN A SPECIFIED
 PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE
 PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR
 DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING
 OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE
 IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING.
 THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED
 UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN
 APPROVED BY THE BUILDING OFFICIAL.
  
 13) SHOW COMPLIANCE WITH FBC 1203.3 FOR UNDER-FLOOR
 VENTILATION.
  
 14) ELEVATION 1 ON SHEET A-6 HAS A NOTE FOR A
 PRE-ENGINEERED ALUMINIUM WALKWAY COVER. SECTION 3 ON
 SHEET S-5 HAS SLOPED PLYWOOD ON 2X6 WOOD RAFTERS ROOF
 OVER THE BALCONIES. PLEASE CLARIFY. FBC 107
  
 15) AWS D1.1 CLAUSE 3.1: AT TIME OF INSPECTION PLEASE
 PROVIDE A WELD PROCEDURE SPECIFICATION; THE W.P.S.
 SPECIFIES THE REQUIRED ESSENTIAL VARIABLES INCLUDING:
 BASE MATERIALS, JOINTS, PROCESS, AND FILLER METALS TO
 BE USED.
 AWS D1.1 CLAUSE 4.15: AT TIME OF INSPECTION PLEASE
 PROVIDE A WELDER PERFORMANCE QUALIFICATION RECORD; THE
 W.P.Q.R. PROVIDES INFORMATION WHICH CAN BE USED TO
 VERIFY THE WELDER?S QUALIFICATION AND CERTIFICATION AS
 IT RELATES TO THE WELDING REQUIREMENTS OF THE PROJECT.
  
 16) SUBMIT THE COVERSHEET WITH THE FL# (FL24546.1) FOR
 THE ROOF STAND DOCUMENTS THAT WERE SUBMITTED.
 FL24546.1.
  
 17) WHEN RESUBMITTING PLANS PLEASE INDICATE THE
 REVISION. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-09-15 Cont ID  
Sent By pleduc Date 2020-09-15 Time   Rev Time 0.00
Received By pleduc Date 2020-09-14 Time 12:28 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-06-30 Cont ID  
Sent By pleduc Date 2020-06-30 Time   Rev Time 0.00
Received By pleduc Date 2020-06-25 Time 15:33 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-22 Cont ID  
Sent By rmcdouga Date 2020-09-22 Time 09:09 Rev Time 0.00
Received By rmcdouga Date 2020-09-11 Time 10:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-15 Cont ID  
Sent By rmcdouga Date 2020-07-15 Time 07:52 Rev Time 0.00
Received By rmcdouga Date 2020-06-24 Time 16:22 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-09-22 Cont ID  
Sent By rmcdouga Date 2020-09-22 Time 08:11 Rev Time 0.00
Received By rmcdouga Date 2020-09-22 Time 08:11 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-07-07 Cont ID  
Sent By rmcdouga Date 2020-07-07 Time 12:26 Rev Time 0.00
Received By rmcdouga Date 2020-07-07 Time 12:26 Sent To  
Notes
2020-07-07 12:36:201) THE PLANS HAVE NOT BEEN DIGITALLY SIGNED BY THE
 ARCHITECT. ELECTRONICALLY SUBMITTED PLANS ARE REQUIRED
 TO BE DIGITALLY SIGNED BY THE ARCHITECT. FS 481 & FAC
 61G1
  
 2) THE ENGINEER'S DIGITAL SIGNATURE IS SELF-CERTIFIED.
 THE FLORIDA BOARD OF PROFESSIONAL ENGINEER'S REQUIRES
 THIRD PARTY CERTIFICATE OF AN ENGINEER'S SIGNATURE. FS
 471 & FAC 61G15

Review Stop Z ZONING
Rev No 1 Status P Date 2020-07-08 Cont ID  
Sent By ajones Date 2020-07-08 Time 10:49 Rev Time 0.00
Received By ajones Date 2020-07-08 Time 10:49 Sent To  
Notes
***NONE***