Plan Review Details - Permit 20060805
Plan Review Stops For Permit 20060805
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2020-07-24 Cont ID  
Sent By rmcdouga Date 2020-07-24 Time 08:15 Rev Time 0.00
Received By rmcdouga Date 2020-07-24 Time 08:15 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-10-15 Cont ID  
Sent By rmcdouga Date 2020-10-15 Time 15:48 Rev Time 0.00
Received By rmcdouga Date 2020-10-15 Time 15:37 Sent To  
Notes
2020-10-15 15:48:32THE FLOOR/CEILING AND WALL FIRE RESISTIVE RATINGS SHALL
 BE MAINTAINED AT KITCHEN SOFFITS. FBC 708

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-07-24 Cont ID  
Sent By rmcdouga Date 2020-07-24 Time 12:00 Rev Time 0.00
Received By rmcdouga Date 2020-07-24 Time 08:15 Sent To  
Notes
2020-07-24 12:00:45PLAN REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
 COMMERCIAL REMODEL (LEVEL II ALTERATION)
 TYPE II-A CONSTRUCTION
 R-2 OCCUPANCY
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) PROVIDE FRAMING DETAILS FOR THE NEW KITCHEN SOFFIT.
 SHOW THAT THE REQUIRED FIRE RATING OF THE WALLS AND
 FLOOR/CEILING ASSEMBLIES WILL BE MAINTAINED. FBC
 107.2.1 AND FBC 420.2, 420.3
  
 2) ALL WORK SHALL COMPLY WITH FAIR HOUSING GUIDELINES.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-07-29 Cont ID  
Sent By jleahy Date 2020-07-29 Time 09:28 Rev Time 0.00
Received By jleahy Date 2020-07-28 Time 17:18 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-09-23 Cont ID  
Sent By pleduc Date 2020-09-23 Time   Rev Time 0.00
Received By pleduc Date 2020-09-23 Time 15:35 Sent To  
Notes
2020-09-23 15:35:37THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) ANY REMOVAL AND/OR CONSTRUCTION OF WALLS AND /OR
 CEILINGS REQUIRE AN EVALUATION OF THE FIRE ALARM AND/OR
 FIRE SPRINKLER SYSTEMS BY APPLICABLE LICENSED
 CONTRACTORS FOR CODE COVERAGE COMPLIANCE.
  
 2) ANY AND ALL WORK ON THE FIRE ALARM AND/OR FIRE
 SPRINKLER SYSTEMS SHALL BE DONE UNDER SEPARATE PERMITS
 AND SHOP DRAWINGS.
  
 3) THE EXISTING LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR
 FIRE SPRINKLER SHALL BE MAINTAINED AND REMAIN ACTIVE
 THROUGHOUT THE CONSTRUCTION PERIOD.
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-06-22 Cont ID  
Sent By pleduc Date 2020-06-22 Time   Rev Time 0.00
Received By pleduc Date 2020-06-22 Time 12:05 Sent To  
Notes
2020-06-22 12:06:01THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) ANY REMOVAL AND/OR CONSTRUCTION OF WALLS AND /OR
 CEILINGS REQUIRE AN EVALUATION OF THE FIRE ALARM AND/OR
 FIRE SPRINKLER SYSTEMS BY APPLICABLE LICENSED
 CONTRACTORS FOR CODE COVERAGE COMPLIANCE.
  
 2) ANY AND ALL WORK ON THE FIRE ALARM AND/OR FIRE
 SPRINKLER SYSTEMS SHALL BE DONE UNDER SEPARATE PERMITS
 AND SHOP DRAWINGS.
  
 3) THE EXISTING LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR
 FIRE SPRINKLER SHALL BE MAINTAINED AND REMAIN ACTIVE
 THROUGHOUT THE CONSTRUCTION PERIOD.
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-15 Cont ID  
Sent By rmcdouga Date 2020-10-15 Time 15:48 Rev Time 0.00
Received By rmcdouga Date 2020-09-22 Time 11:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-29 Cont ID  
Sent By jleahy Date 2020-07-29 Time 09:29 Rev Time 0.00
Received By jleahy Date 2020-06-19 Time 09:07 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-07-24 Cont ID  
Sent By ccole Date 2020-07-24 Time 13:39 Rev Time 0.00
Received By ccole Date 2020-07-24 Time 13:16 Sent To  
Notes
2020-07-24 13:42:22PORTOFINO PLACE WAS DESIGNED AND BUILT UNDER THE FAIR
 HOUSING ACT AND ACCESSIBILITY GUIDELINES MANUAL. ALL
 KITCHEN AND BATH FIXTURES SHALL BE REPLACED AS
 ORIGINALLY DESIGNED WITH NO CHANGES MADE TO REQUIRED
 CLEAR FLOOR SPACES, AND FIXTURE CABINET HEIGHTS.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-10-15 Cont ID  
Sent By rmcdouga Date 2020-10-15 Time 15:58 Rev Time 0.00
Received By rmcdouga Date 2020-10-15 Time 15:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-07-24 Cont ID  
Sent By rmcdouga Date 2020-07-24 Time 12:00 Rev Time 0.00
Received By rmcdouga Date 2020-07-24 Time 12:00 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved