Plan Review Details - Permit 20060320
Plan Review Stops For Permit 20060320
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-07-14 Cont ID  
Sent By jgomez Date 2020-07-14 Time 17:19 Rev Time 0.00
Received By jgomez Date 2020-07-14 Time 16:12 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-06-22 Cont ID  
Sent By jgomez Date 2020-06-22 Time 09:35 Rev Time 0.00
Received By jgomez Date 2020-06-22 Time 08:59 Sent To  
Notes
2020-06-22 09:41:02RESIDENTIAL (R2) BUILDING REVIEW COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 NOTE: SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK
 SHALL COMPLY WITH THE MATERIALS AND METHODS
 REQUIREMENTS IN THE FLORIDA BUILDING CODE.
  
 1-FLOORING UNDERLAYMENT:
 A) PROVIDE 2 COPIES OF THE FLAME SPREAD INDEX AND SMOKE
 DEVELOPED INDEX TEST DONE IN ACCORDANCE WITH ASTM E 84
 OR UL 723 AS REQUIRED BY SEC. 720.1 OF FBC 6TH EDITION
 (2017).
  
 B) PROVIDE 2 COPIES OF THE SOUND TRANSMISSION CLASS
 (STC) TEST DONE IN ACCORDANCE WITH ASTM E 90 AS
 REQUIRED BY SEC. 1207.2 OF FBC 6TH EDITION (2017).
  
 C) PROVIDE 2 COPIES OF THE IMPACT INSULATION CLASS
 (IIC) TEST DONE IN ACCORDANCE WITH ASTM E 492 AS
 REQUIRED BY SEC. 1207.3 OF FBC 6TH EDITION (2017).
  
 NOTE: TEST SAMPLES TO MATCH BUILDING FLOOR/CEILING
 CONSTRUCTION AND PROPOSED FLOOR FINISH. ALSO, THERE ARE
 TESTS FOR 6" OR 8" CONCRETE SLABS WITH OR WITHOUT
 ACOUSTICAL CEILING. TYPICALLY THERE ARE NOT SUSPENDED
 ACOUSTICAL CEILINGS IN THESE BUILDINGS.
  
 2- DRAWINGS SUBMITTED NEED TO HAVE THE NAME AND
 SIGNATURE OF THE PERSON RESPONSIBLE FOR THE PLAN AS
 REQUIRED BY SEC. 107.2.1 CITY AMENDMENTS.
  
  
 NOTE:
 FOR FASTER REVIEW ON ALL APPLICATIONS, YOU MAY SUBMIT
 VIA PROJECTDOX. PLEASE EMAIL [email protected]
 FOR INSTRUCTIONS.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-07-14 Cont ID  
Sent By jgomez Date 2020-07-14 Time 17:20 Rev Time 0.00
Received By jgomez Date 2020-06-25 Time 16:05 Sent To I
Notes
2020-06-25 16:06:10ROUTED TO BLDG. MISC 1

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-06-22 Cont ID  
Sent By jgomez Date 2020-06-22 Time 09:41 Rev Time 0.00
Received By jgomez Date 2020-06-09 Time 11:18 Sent To I
Notes
2020-06-09 11:19:11ROUTED TO BLDG MISC 1


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved