| Plan Review Stops For Permit 20050999 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-08-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-08-21 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-08-21 |
Time |
15:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-08-03 |
Time |
14:18 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-03 |
Time |
14:17 |
Sent To |
|
|
| Notes |
| 2020-08-03 14:19:20 | NEEDS DIGITAL SIGNATURE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-06-09 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-06-09 |
Time |
15:56 |
Sent To |
|
|
| Notes |
| 2020-06-09 15:56:44 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) ONLY PART OF THE GENERATOR PAD DRAWING WAS UPLOADED. | | | THE ENTIRE DOCUMENT IS REQUIRED. FBC 107 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-06-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-06-19 |
Time |
12:51 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-06-19 |
Time |
08:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-07-31 |
Time |
14:41 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-07-31 |
Time |
14:41 |
Sent To |
|
|
| Notes |
| 2020-07-31 14:43:11 | 07/31/20 REVIEWED FOR CODE COMPLIANCE (GAS) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEW | | | AVAILABLE FROM 6:30 AM TO 7:30 AM / 2:00 PM TO 5:00 PM | | | EMAIL: [email protected] CELL: 561-701-6437 | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2020-06-17 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-06-17 |
Time |
14:17 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-06-17 |
Time |
13:18 |
Sent To |
|
|
| Notes |
| 2020-06-17 14:18:31 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT -20050999 | | | | | | CODES IN EFFECT: | | | | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | | EDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) PROVIDE SPEC SHEETS FOR THE REGULATORS. FBC FS | | | 107.2.1 | | | | | | 2) THE INTERIOR GAS SYSTEM IS A LOW PRESSURE SYSTEM, | | | THE NEW REGULATOR AT THE METER IS A 2PSI REGULATOR | | | MAKING THIS ENTIRE SYSTEM A 2PSI SYSTEM. WHERE IS THE | | | MP REGULATOR FOR THE INTERIOR GAS SYSTEM? AGAIN, THE | | | REGULATOR AT THE METER IS 2 PSI. WHY IS THERE ANOTHER | | | 2PSI REGULATOR AT THE NEW GENERATOR? SHOULDN?T THIS BE | | | AN MP REGULATOR? PLEASE PROVIDE THE GAS TABLES USED FOR | | | BOTH THE LOW PRESSURE AND 2PSI SYSTEMS. FBC FS 107.2.1 | | | | | | 3) HOW IS THE GENERATOR BEING CONNECTED TO THE ?? PE? | | | IF A FLEXIBLE HOSE IS TO BE USED PLEASE SUPPLY SPECS. | | | FOR THE HOSE AND LABEL THE HOSE TO BE USED ON THE SPEC | | | SHEET ALONG WITH THE PRESSURE DROP. FBC FS 107.2.1 | | | | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | | UPDATED. | | | | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2020-08-24 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-08-24 |
Time |
07:13 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-08-22 |
Time |
10:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-08-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-08-21 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-08-17 |
Time |
07:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-08-03 |
Time |
14:20 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-07-23 |
Time |
10:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-06-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-06-19 |
Time |
12:51 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-06-01 |
Time |
15:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
N |
Date |
2020-07-31 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-07-31 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-07-31 |
Time |
14:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2020-06-17 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-06-17 |
Time |
14:18 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-06-17 |
Time |
14:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2020-08-31 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-08-31 |
Time |
16:36 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-08-31 |
Time |
16:36 |
Sent To |
|
|
| Notes |
| 2020-08-31 16:40:01 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | SIGNATURE REVIEW APPROVED BY SUBMITTED ORIGINAL PAPER | | | SIGNED/SEALED CONCRETE PAD WINDLOAD DESIGN SHEET. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2020-08-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-08-22 |
Time |
09:03 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-08-22 |
Time |
09:03 |
Sent To |
|
|
| Notes |
| 2020-08-22 09:45:05 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | SIGNATURE REVIEW DENIED: | | | | | | THE SUBMITTED DIVERSITECH CONCRETE PAD ENGINEERING IS | | | SIGNED/SEALED BY RICHARD NEET OF ENGINEERING EXPRESS. | | | THIS CONCRETE PAD DETAIL DOES NOT GIVE THE SPECIFIC | | | WINDLOAD INFORMATION AND THE GENERATOR SIZE IS NOT | | | INCLUDED ON THIS SCHEDULE AS OTHER SUBMITTED PLAN PAGES | | | DESCRIBE THIS GENERATOR AS A GENERAC 32KW. | | | | | | THE EARLIER SUBMITTED GENERATOR PAD ENGINEERING DETAILS | | | ARE NOT FROM DIVERSITECH BUT FROM AMERITECH AND APPEAR | | | TO HAVE THE REQUIRED INFORMATION BUT HAVE A NON | | | VERIFIABLE SIGNATURE/SEAL BY FRANK BENNARDO OF | | | ENGINEERING EXPRESS. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2020-08-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2020-08-21 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2020-08-21 |
Time |
15:40 |
Sent To |
|
|
| Notes |
| 2020-08-21 15:41:12 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR | | | PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | | ORIGINALS. A SCAN OF A WET SIGNATURE IS NOT CONSIDERED | | | A DIGITAL SIGNATURE. | | | | | | EITHER UPLOAD A DIGITALLY SIGNED DOCUMENT OR DROP OFF | | | (OR MAIL) ONE PAPER ORIGINAL: | | | | | | BUILDING DIVISION, FIRST FLOOR | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS ST | | | WEST PALM BEACH, FL 33401 | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-08-03 |
Time |
14:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-08-03 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2020-08-03 14:20:11 | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE PAPER DRAWINGS. NO PHOTOCOPY OR | | | OTHER FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS | | | 471 & 61G15 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-06-09 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-06-09 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-06-09 |
Time |
15:56 |
Sent To |
|
|
| Notes |
| 2020-06-09 15:58:05 | THE ENGINEER'S DIGITAL SIGNATURE IS REQUIRED ON THE | | | GENERATOR PAD DRAWING. FS471 &FAC 61G15 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
kalexand |
Date |
2020-06-11 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
2020-06-11 |
Time |
|
Sent To |
I |
|
| Notes |
|
|