| Plan Review Stops For Permit 20050101 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
3 |
Status |
P |
Date |
2020-06-26 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-06-26 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-06-26 |
Time |
11:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
F |
Date |
2020-06-16 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-06-16 |
Time |
16:29 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-06-16 |
Time |
16:27 |
Sent To |
|
|
| Notes |
| 2020-06-16 16:32:04 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | ALL THAT IS NEEDED IS AN ACKNOWLEDGEMENT LETTER ON | | | CONTRACTOR LETTERHEAD SIGNED BY THE CONTRACTOR AS NOTED | | | BELOW. | | | | | | ASBESTOS REQUIREMENTS: | | | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2020-05-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-05-22 |
Time |
15:45 |
Sent To |
|
|
| Notes |
| 2020-05-23 15:57:20 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | ASBESTOS REQUIREMENTS DENIED: | | | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN PDF | | | FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE | | | THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2020-07-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-07-20 |
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-07-20 |
Time |
08:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-06-16 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-06-16 |
Time |
16:45 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-06-16 |
Time |
16:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2020-05-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-05-22 |
Time |
15:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2020-07-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-07-16 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-07-16 |
Time |
16:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-06-18 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-06-18 |
Time |
17:38 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-06-18 |
Time |
17:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-05-21 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-05-21 |
Time |
13:08 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-05-21 |
Time |
12:31 |
Sent To |
|
|
| Notes |
| 2020-05-21 13:10:20 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | | | | ELECTRICAL PLAN REVIEW NEEDS AN ELECTRICAL PERMIT | | | APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL | | | PERMIT APPLICATION TO [email protected] AND CC | | | [email protected] AND [email protected] SO WE RECEIVE IT | | | ALSO. WHEN THIS EMAIL IS RECEIVED ONE OF THE REVIEWERS | | | WILL APPROVE THE PLAN REVIEW. THE ORIGINAL PERMIT | | | APPLICATION MUST BE SUBMITTED WHEN THE PERMIT IS PICKED | | | UP. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-07-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-07-16 |
Time |
11:09 |
Sent To |
|
|
| Notes |
| 2020-07-16 11:12:39 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) THE EXISTING FIRE ALARM SYSTEM DEVICES SHALL BE | | | MAINTAINED AND REMAIN ACTIVE THROUGHOUT THE DEMO AND | | | CONSTRUCTION PERIOD. | | | | | | 2) ANY AND ALL WORK ON THE FIRE ALARM SYSTEM OR DEVICES | | | SHALL BE DONE UNDER SEPARATE PERMITS AND SHOP DRAWINGS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-06-16 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-06-16 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-06-16 |
Time |
13:02 |
Sent To |
|
|
| Notes |
| 2020-06-16 13:02:50 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) THE EXISTING FIRE ALARM SYSTEM DEVICES SHALL BE | | | MAINTAINED AND REMAIN ACTIVE THROUGHOUT THE DEMO AND | | | CONSTRUCTION PERIOD. | | | | | | 2) ANY AND ALL WORK ON THE FIRE ALARM SYSTEM OR DEVICES | | | SHALL BE DONE UNDER SEPARATE PERMITS AND SHOP DRAWINGS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-05-20 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-05-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-05-20 |
Time |
09:33 |
Sent To |
|
|
| Notes |
| 2020-05-20 09:53:10 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) THE EXISTING FIRE ALARM SYSTEM DEVICES SHALL BE | | | MAINTAINED AND REMAIN ACTIVE THROUGHOUT THE DEMO AND | | | CONSTRUCTION PERIOD. | | | | | | 2) ANY AND ALL WORK ON THE FIRE ALARM SYSTEM OR DEVICES | | | SHALL BE DONE UNDER SEPARATE PERMITS AND SHOP DRAWINGS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2020-07-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-07-20 |
Time |
08:30 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-07-15 |
Time |
09:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-06-18 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-06-18 |
Time |
17:39 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-06-15 |
Time |
10:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-05-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
15:58 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-05-18 |
Time |
13:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
N |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-07-17 |
Time |
08:33 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-07-17 |
Time |
08:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2020-06-16 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-06-16 |
Time |
11:11 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-06-16 |
Time |
10:55 |
Sent To |
|
|
| Notes |
| 2020-06-16 11:15:04 | THIS PROJECT IS FOR DEMO ONLY. THIS PROJECT WILL NEED | | | TO HAVE A MECHANICAL DEMO PERMIT. PLEASE REMOVE ALL NEW | | | WORK FROM DEMO SHEET, SHOW ONLY THE DEMO WORK BEING | | | DONE. THE NEW WORK WILL COME UNDER A NEW UPFIT PERMIT. | | | | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
N |
Date |
2020-05-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
15:14 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-05-23 |
Time |
15:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-07-17 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-07-17 |
Time |
07:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2020-06-16 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-06-16 |
Time |
12:05 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-06-16 |
Time |
11:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-07-17 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2020-07-17 |
Time |
08:35 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2020-07-17 |
Time |
08:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2020-06-16 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-06-16 |
Time |
16:46 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-06-16 |
Time |
16:27 |
Sent To |
|
|
| Notes |
| 2020-06-16 16:50:12 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | SIGNATURE REVIEW APPROVED WITH PROVISO: | | | | | | PROVIDE AND DROP OFF AN ORIGINAL (PAPER) SET OF SIGNED | | | AND SEALED PLANS TO THE CITY FOR SIGNATURE/SEAL | | | VERIFICATION. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-05-23 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
15:33 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2020-05-22 |
Time |
15:45 |
Sent To |
|
|
| Notes |
| 2020-05-23 15:52:18 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | FBC M = FBC MECHANICAL | | | | | | SIGNATURE REVIEW DENIEDL | | | | | | FBC B 107.2.1, FS 471 & FS 481, THE SUBMITTED PLANS | | | NEED TO BE DIGITALLY SIGNED. |
|
|