| 2020-07-27 13:57:47 | 07/27/20 2ND GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THE GAS TO THE GENERATOR IS 1/2 LBS BUT THE METER |
| | DOES NOT SPECIFY IF IT IS 2 PSI OR 1/2 LBS, PLEASE |
| | LABEL PER THE 2017 FBC RES. SEC. G2413.2. |
| | |
| | 2. THE GENERATOR IS 16 KW AT FULL LOAD BTU 309 ON SPECS |
| | AND YOU HAVE 240 BTU'S ON ISOMETRIC PLEASE CHANGE TO |
| | REFLECT TOTAL BTU'S AND RECALCULATE PER THE 2017 FBC |
| | RES. SEC. G2413. |
| | |
| | 3. PLEASE SHOW AND LABEL DRIP LEG, SHUT OFF VALVE, |
| | UNION AND REGULATOR PER THE 2017 FBC RES. SEC. |
| | G2401.1.3. |
| | |
| | 4. THE GENRAC REQUIRES 5" TO 7" WATER COLUMN THIS NEED |
| | TO BE REGULATED, PLEASE SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS |
| | INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE |
| | APPROVED FOR OUTDOOR INSTALLATION PER THE 2017 FBC RES. |
| | SEC. G2421.1. |
| | |
| | 5. PEASE DELETE THE COMMENT OF THE TANK AT BOTTOM OF |
| | PAGE PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |