Plan Review Details - Permit 20040504
Plan Review Stops For Permit 20040504
Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-06-16 Cont ID  
Sent By pleduc Date 2020-06-16 Time   Rev Time 0.00
Received By pleduc Date 2020-06-16 Time 13:08 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-04-22 Cont ID  
Sent By pleduc Date 2020-04-22 Time   Rev Time 0.00
Received By pleduc Date 2020-04-22 Time 10:21 Sent To  
Notes
2020-04-22 10:28:35THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THERE IS A SHEET CONTAINED IN THE BACKUP INFORMATION
 FROM TLC; SUB # 263213, NAME: FUEL TANK SUBSTITUTION
 REQUEST, THAT INDICATES "ODES NOT CONFORM TO DESIGN
 CONCEPT....."
  
 THERE ARE THREE (3) POINTS SUBMITTED TO ADDRESS.
  
 PLEASE PROVIDE A DETAILED RESPONSE TO THE THREE (3)
 POINTS ADDRESSED TO TLC'S AND TLC'S CHANGING THE STATUS
 TO "CONFORMS TO DESIGN CONCEPT"
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status F Date 2020-08-28 Cont ID  
Sent By shill Date 2020-08-28 Time 16:03 Rev Time 0.00
Received By shill Date 2020-08-28 Time 16:03 Sent To  
Notes
2020-08-28 16:04:21COMMENTS FROM DERM:
  
 1) THE TANK SCHEMATIC "ENGINE OR DAY TANK SUPPLY"
 (ATTACHMENT 1086 GEN. FUEL TANK (R4)_TLC ?); THE SUPPLY
 LINE REQUIRES AN ANTISIPHON DEVICE IF THE END DIPS
 BELOW THE TOP OF TANK. THE ORDER OF COMPONENTS COMING
 FROM TOP OF TANK ARE 1ST THE BLOCK VALVE THEN
 ANTISIPHON DEVICE.
 2) THE RETURN LINE; IF IT IS CAPABLE OF SIPHONING THE
 TANK; IT COULD HAVE A BLEEDER HOLE AS THE PLANS STATE
 THE TANK FILL LINE WILL HAVE. (I DON'T REGULARLY SEE
 RETURN LINES THAT RUN TO BOTTOM OF SUPPLY TANK WITH
 DIFFUSERS).
 3) I COULD NOT TELL, BUT TANKS MAIN PRIMARY VENT MUST
 BE VENTED OUTSIDE
 4) OFTEN MISSED: TANK ROOMS REQUIRE A 4? CURB AT DOOR
 OPENINGS (PREVENTS A FUEL RELEASE FLOWING DOWN
 HALLWAYS)
  
  TANK SECONDARY MUST BE TESTED AFTER INSTALLATION;
 ALONG WITH OVERFILL PROTECTION DEVICE AND LEAK
 DETECTION DEVICES.
  WERE GIVEN 30 DAY NOTICE OF INSTALLATIONS, THE 48-72
 HRS PRIOR TO WORK SO WE CAN SCHEDULE AN INSPECTION.
  
 PBCDERM TANK INSPECTOR: JONATHAN ARLINE
 SENIOR ENVIRONMENTAL ANALYST
 PALM BEACH COUNTY DEPT. ENVIRONMENTAL RESOURCES
 MANAGEMENT / STORAGE TANK REGULATION
 2300 NORTH JOG RD., 4TH FLOOR, WEST PALM BCH., FL
 33411-2743
 TEL. (561)-233-2535. FAX: (561) 233 2414 / E-MAIL:
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-06-16 Cont ID  
Sent By lmarchan Date 2020-06-16 Time 15:44 Rev Time 0.00
Received By lmarchan Date 2020-06-15 Time 15:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-22 Cont ID  
Sent By lmarchan Date 2020-04-22 Time 10:34 Rev Time 0.00
Received By lmarchan Date 2020-04-21 Time 16:25 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-04-22 Cont ID  
Sent By medwards Date 2020-04-22 Time 08:41 Rev Time 0.00
Received By medwards Date 2020-04-22 Time 08:41 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-06-16 Cont ID  
Sent By pleduc Date 2020-06-16 Time   Rev Time 0.00
Received By pleduc Date 2020-06-16 Time 13:57 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-04-22 Cont ID  
Sent By medwards Date 2020-04-22 Time 08:41 Rev Time 0.00
Received By medwards Date 2020-04-22 Time 08:40 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved