Plan Review Details - Permit 20031328
Plan Review Stops For Permit 20031328
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-04-22 Cont ID  
Sent By rmcdouga Date 2020-04-22 Time 09:46 Rev Time 0.00
Received By rmcdouga Date 2020-04-22 Time 09:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-04-21 Cont ID  
Sent By rmcdouga Date 2020-04-21 Time 09:42 Rev Time 0.00
Received By rmcdouga Date 2020-04-21 Time 09:42 Sent To  
Notes
2020-04-21 09:55:44PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) ON PRODUCT APPROVAL FL 477-R8 FOR THE FLAT ROOF,
 SPECIFY THE SYSTEM NUMBER AND MAXIMUM DESIGN PRESSURE
 ON THE APPROPRIATE ROOF CHART FOR A NON-INSULATED TORCH
 APPLIED ROOF COVERING. THE MAXIMUM DESIGN ROOF PRESSURE
 FOR THE SYSTEM WILL HAVE TO BE -90 PSF OR MORE. IF NOT
 ENGINEERED FASTENER SPACING CALCULATIONS WILL BE
 REQUIRED, IF ALLOWED BY THE PRODUCT APPROVAL. CLEARLY
 MARK THE ITEMS THAT APPLY TO YOUR PROJECT ON THE
 PRODUCT APPROVAL. FBC 107.2.1
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-04-15 Cont ID  
Sent By pvalenti Date 2020-04-15 Time 14:02 Rev Time 0.00
Received By pvalenti Date 2020-04-15 Time 12:38 Sent To  
Notes
2020-04-15 14:05:44PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING REVIEW DENIED:
  
 FBC B 107, PLEASE INDICATE ON THE PRODUCT APPROVAL/TEST
 REPORT WHICH SYSTEM YOU WILL BE USING AND WHAT THE
 FASTENER SPACING WILL BE FOR THE BASE SHEET.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-04-22 Cont ID  
Sent By rmcdouga Date 2020-04-22 Time 09:46 Rev Time 0.00
Received By rmcdouga Date 2020-04-21 Time 15:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-04-21 Cont ID  
Sent By rmcdouga Date 2020-04-21 Time 09:42 Rev Time 0.00
Received By rmcdouga Date 2020-04-15 Time 15:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-15 Cont ID  
Sent By pvalenti Date 2020-04-15 Time 14:05 Rev Time 0.00
Received By pvalenti Date 2020-04-15 Time 14:05 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2020-04-21 Cont ID  
Sent By rmcdouga Date 2020-04-21 Time 09:42 Rev Time 0.00
Received By rmcdouga Date 2020-04-21 Time   Sent To  
Notes
***NONE***