Plan Review Details - Permit 20031180
Plan Review Stops For Permit 20031180
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-04-10 Cont ID  
Sent By rmcphers Date 2020-04-10 Time 16:33 Rev Time 0.00
Received By rmcphers Date 2020-04-10 Time 16:33 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-04-06 Cont ID  
Sent By rmcphers Date 2020-04-06 Time 14:38 Rev Time 0.00
Received By rmcphers Date 2020-04-06 Time 14:38 Sent To  
Notes
2020-04-06 14:45:00AWNINGS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) DRAWINGS (3 OF 4) AND (4 OF 4) NEED TO BE
 ELECTRONICALLY SIGNED AND SEALED BY THE ENGINEER.
 2) CANNOT HAVE THE HAND WRITING ON DRAWING (3 OF 4).
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-30 Cont ID  
Sent By rmcphers Date 2020-03-30 Time 09:54 Rev Time 0.00
Received By rmcphers Date 2020-03-30 Time 09:11 Sent To  
Notes
2020-03-30 09:53:51AWNING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) DRAWINGS DO NOT SHOW AS ELECTRONICALLY SIGNED IN
 "ADOBE" DRAWINGS USED FOR ELECTRONIC PLAN REVIEW NEED
 TO BE ELECTRONICALLY SIGNED.
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-04-13 Cont ID  
Sent By lmarchan Date 2020-04-13 Time 13:18 Rev Time 0.00
Received By lmarchan Date 2020-04-09 Time 10:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-04-08 Cont ID  
Sent By lmarchan Date 2020-04-08 Time 16:53 Rev Time 0.00
Received By lmarchan Date 2020-04-03 Time 09:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-02 Cont ID  
Sent By lmarchan Date 2020-04-02 Time 10:48 Rev Time 0.00
Received By lmarchan Date 2020-03-24 Time 14:33 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-04-10 Cont ID  
Sent By rmcphers Date 2020-04-10 Time 16:34 Rev Time 0.00
Received By rmcphers Date 2020-04-10 Time 16:34 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-04-06 Cont ID  
Sent By rmcphers Date 2020-04-06 Time 14:45 Rev Time 0.00
Received By rmcphers Date 2020-04-06 Time 14:45 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-03-30 Cont ID  
Sent By rmcphers Date 2020-03-30 Time 09:54 Rev Time 0.00
Received By rmcphers Date 2020-03-30 Time 09:54 Sent To  
Notes
2020-03-30 09:55:04DRAWINGS DO NOT SHOW AS ELECTRONICALLY SIGNED IN
 "ADOBE" DRAWINGS USED FOR ELECTRONIC PLAN REVIEW NEED
 TO BE ELECTRONICALLY SIGNED.

Review Stop Z ZONING
Rev No 3 Status P Date 2020-04-13 Cont ID  
Sent By eschneid Date 2020-04-13 Time 11:59 Rev Time 0.25
Received By eschneid Date 2020-04-13 Time 10:53 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-04-08 Cont ID  
Sent By eschneid Date 2020-04-08 Time 16:40 Rev Time 0.25
Received By eschneid Date 2020-04-08 Time 16:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-04-02 Cont ID  
Sent By eschneid Date 2020-04-02 Time 09:33 Rev Time 0.25
Received By eschneid Date 2020-04-02 Time 09:27 Sent To  
Notes
2020-04-02 09:35:31FAILED
  
 PROVIDE ELEVATION DRAWNINGS AND A SITE PLAN OF THE
 BUILDING TO SHOW WHERE THE AWINGS ARE GOING TO BE
 INSTALLED. THE ELEVATION PLAN MUST SHOW THE HEIGHT FROM
 THE BOTTOM OF THE AWNING TO GRADE. THE AWNINGS
 THEMSELVES APPEAR TO MEET ZONING REQUIREMENTS.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved