| Plan Review Stops For Permit 20031104 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2020-03-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2020-03-27 |
Time |
07:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2020-03-27 |
Time |
07:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-04-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-04-28 |
Time |
15:04 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-04-28 |
Time |
14:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2020-03-26 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2020-03-26 |
Time |
11:28 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2020-03-26 |
Time |
11:28 |
Sent To |
B |
|
| Notes |
| 2020-03-26 11:28:28 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | FAC = FLORIDA ADMINISTRATIVE CODE | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1.PROVIDE ACCURATE LOAD CALCULATION INCLUDING ALL | | | LOADS. NEC 220; FBC RE E3602.2 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | | SHEETS. | | | | | | SINCERELY, | | | | | | PHIL PETTY | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6742 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2020-03-31 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-03-27 |
Time |
|
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-03-27 |
Time |
18:55 |
Sent To |
|
|
| Notes |
| 2020-03-27 18:55:53 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | | THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN | | | PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS | | | WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-04-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-04-28 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2020-04-17 |
Time |
16:05 |
Sent To |
|
|
| Notes |
| 2020-04-22 16:05:36 | CONVERTED TO DIGITAL. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-03-27 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-03-27 |
Time |
18:54 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-03-23 |
Time |
15:56 |
Sent To |
|
|
| Notes |
| 2020-03-25 13:10:47 | TO ELECTRICAL | | 2020-03-23 15:56:39 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2020-03-27 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2020-03-27 |
Time |
18:54 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2020-03-27 |
Time |
18:54 |
Sent To |
|
|
| Notes |
| 2020-03-27 18:55:21 | 03/27/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEW | | | AVAILABLE FROM 6:30 AM TO 7:30 AM / 2:00 PM TO 5:00 PM | | | EMAIL: [email protected] CELL: 561-701-6437 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2020-04-22 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2020-04-22 |
Time |
10:40 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2020-04-22 |
Time |
10:40 |
Sent To |
|
|
| Notes |
| 2020-04-22 10:41:55 | CONVERTED TO DIGITAL. | | | DRAWINGS/CALCULATIONS WITH ENGINEER'S ORIGINAL | | | SEAL/SIGNATURE ON CITY'S FILE. JG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2020-03-25 |
|
|
Cont ID |
|
| Sent By |
rfalcone |
Date |
2020-03-25 |
Time |
09:17 |
Rev Time |
0.00 |
| Received By |
rfalcone |
Date |
2020-03-25 |
Time |
09:17 |
Sent To |
I |
|
| Notes |
|
|