Plan Review Details - Permit 20031069
Plan Review Stops For Permit 20031069
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2020-03-23 Cont ID  
Sent By cpuell Date 2020-03-23 Time 13:31 Rev Time 0.00
Received By cpuell Date 2020-03-23 Time 13:31 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-03-23 Cont ID  
Sent By pvalenti Date 2020-03-23 Time 10:12 Rev Time 0.00
Received By pvalenti Date 2020-03-23 Time 07:29 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-03-24 Cont ID  
Sent By jpearson Date 2020-03-24 Time 09:40 Rev Time 0.00
Received By jpearson Date 2020-03-24 Time 09:40 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-03-23 Cont ID  
Sent By jpearson Date 2020-03-23 Time 07:32 Rev Time 0.00
Received By jpearson Date 2020-03-23 Time 07:32 Sent To  
Notes
2020-03-23 07:32:43CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. PROVIDE ELECTRICAL PLAN FOR REVIEW TO INCLUDE RISER
 DIAGRAM, GROUNDING DETAILS, AND ANY CONDUIT RUNS
 ASSOCIATED WITH FOUNDATION, SIGNED AND SEALED BY THE
 PERSON RESPONSIBLE FOR THE DESIGN. WPB FBC 107.2.1,
 107.3.5; FS 471, 481
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, PROVIDE A RESPONSE LETTER ADDRESSING EACH
 ITEM ALONG WITH THE CITY RESUBMITTAL FORM.
 ADDITIONALLY, INSERT CORRECTED PAGES INTO THE ORIGINAL
 SUBMITTAL AND REMOVE THE PREVIOUSLY REVIEWED SHEETS.
 ONE COPY OF THE PREVIOUSLY REVIEWED SHEETS SHOULD
 REMAIN IN PACKAGE AND BE MARKED OLD SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2020-03-23 Cont ID  
Sent By rrossano Date 2020-03-23 Time   Rev Time  
Received By rrossano Date 2020-03-23 Time   Sent To I
Notes
2020-03-24 11:12:14PASSED WITH PROVISOS:
  
 1) MAINTAIN STORM WATER POLLUTION PREVENTION PLAN
 ONSITE SHOWING:
  
 A) WHERE SILT SCREENS WILL BE INSTALLED,
 B) SHOW THE PROTECTION OF ALL ON-SITE CATCH BASINS
 C) SHOW PROTECTION OF ALL OFF-SITE CATCH BASINS
 D) INCLUDE DETAILS AS TO THE TYPE OF PROTECTION USED ON
 THE CATCH BASINS
 E) SHOW HOW SITE DIRT WILL NOT BE TRACKED INTO THE
 ROADS
  
 GUIDELINES: HTTPS://WWW.EPA.GOV/SITES/PRODUCTION/FILES/
 2015-10/DOCUMENTS/SW_SWPPP_GUIDE.PDF
 TEMPLATE: HTTPS://FLORIDADEP.GOV/SITES/DEFAULT/FILES/CO
 NSTRUCTIONSWPPP_0.PDF
  
 2) THERE ARE WATER AND SEWER LINES IN THE VICINITY OF
 THIS PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE
 STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT
 LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. MORE INFORMATION CAN
 BE FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING
 ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 FAX: (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
2020-03-23 08:31:01PLEASE SUBMIT POLLUTION PREVENTION PLAN.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX
 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 FAX:
 (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ, SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX
 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1085
 FAX: (561) 494-1116 MOBILE: (561) 644-7301 EMAIL:
 [email protected] WWW.WPB.ORG/ENGINEERING
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-03-23 Cont ID  
Sent By pleduc Date 2020-03-23 Time   Rev Time 0.00
Received By pleduc Date 2020-03-23 Time 12:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-03-23 Cont ID  
Sent By cpuell Date 2020-03-23 Time 13:31 Rev Time 0.00
Received By cpuell Date 2020-03-20 Time 15:37 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2020-03-23 Cont ID  
Sent By pvalenti Date 2020-03-23 Time 07:14 Rev Time 0.00
Received By pvalenti Date 2020-03-23 Time 07:14 Sent To  
Notes
2020-03-23 07:17:59PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 IMPACT FEES NOT REQUIRED, CONSTRUCTION APPEARS TO BE
 ALL INTERIOR WORK WITH NO EXTERIOR ADDITIONS.

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-03-23 Cont ID  
Sent By pvalenti Date 2020-03-23 Time 07:27 Rev Time 0.00
Received By pvalenti Date 2020-03-23 Time 07:25 Sent To  
Notes
2020-03-23 07:28:53PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 PLUMBING NOT REQUIRED ON THIS PERMIT. SEE PERMIT #
 19120803.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-03-23 Cont ID  
Sent By pvalenti Date 2020-03-23 Time 10:20 Rev Time 0.00
Received By pvalenti Date 2020-03-23 Time 10:20 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status N Date 2020-03-23 Cont ID  
Sent By shill Date 2020-03-23 Time 11:49 Rev Time 0.00
Received By shill Date 2020-03-23 Time 11:49 Sent To  
Notes
2020-03-23 11:49:43WORK IS STRUCTURAL INTERIOR
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved