| Plan Review Stops For Permit 20031048 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2020-05-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-05-14 |
Time |
16:19 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-05-14 |
Time |
16:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2020-04-06 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2020-04-06 |
Time |
11:36 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-04-06 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2020-04-06 11:41:26 | REVISION | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) DRAWINGS NEED TO BE SIGNED AND SEALED. DRAWINGS NEED | | | TO BE ELECTRONICALLY SIGNED AND SEALED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2020-06-02 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2020-06-02 |
Time |
10:52 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2020-06-02 |
Time |
09:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2020-04-06 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2020-04-06 |
Time |
10:57 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2020-04-06 |
Time |
10:57 |
Sent To |
|
|
| Notes |
| 2020-04-06 10:57:29 | REVIEWED BY JAKE LEAHY, RESULTS ENTERED BY JOHN | | | PEARSON. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2020-05-08 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-05-08 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-05-08 |
Time |
10:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2020-04-06 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2020-04-06 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2020-04-06 |
Time |
10:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2020-06-02 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-05-21 |
Time |
13:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2020-05-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-05-07 |
Time |
15:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2020-04-09 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-04-09 |
Time |
10:29 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2020-04-03 |
Time |
13:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2020-05-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-05-13 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-05-13 |
Time |
07:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2020-04-06 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-04-06 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-04-06 |
Time |
13:01 |
Sent To |
|
|
| Notes |
| 2020-04-06 15:38:35 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT #20031048 | | | 4/6/20 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | PLEASE NOTE NO NARRATIVE WAS PROVIDED TO ITEMIZE AND | | | CLARIFY WHAT CHANGES WERE MADE TO THE APPROVED PLANS- | | | SECTION 107.2.1 WPB. | | | | | | 1) SHEET M1.0: IDENTIFY THE NEW ROOM BEING VENTILATED | | | BY EF-1 AND A) PROVIDE EXHAUST VENTILATION | | | CALCULATIONS. B) PROVIDE THE SEQUENCE OF OPERATION FOR | | | THE FAN. C) PROVIDE MAKEUP AIR- SECTION 107.2.1 WPB, | | | AND SECTION 501.4 FBC M. | | | | | | 2) M1.0: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR | | | VEF-1 IN THE FIRE PUMP ROOM AND A SEQUENCE OF OPERSTION | | | FOR THE FAN. CLARIFY IF THE PUMP IS ELECTRIC OR DIESEL | | | POWERED. PLEASE NOTE THAT DIESEL FIRE PUMPS REQUIRE | | | CONTINUOUS VENTILATION OPERATION; THE EXHAUST DUCT | | | SHALL BE ENCLOSED IN FIRE-RATED CONSTRUCTION FROM THE | | | POINT OF PENETRATION OF THE FIRE-RATED WALL TO THE | | | EXTERIOR OF THE BUILDING; AND THE FIRE DAMPERS ARE NOT | | | PERMITTED- REFER TO SECTIONS 510.7.1 & 510.7.3 FBC M. | | | | | | 3) M1.0: PLEASE SHOW THE RELOCATED CLOTHES DRYER | | | EXHAUST DUCT RUNS AND TERMINATION LOCATIONS. SHOW THE | | | TOTAL RUN LENGTHS OF THE EXHAUST DUCTS AND VERIFY THEY | | | DO NOT EXCEED THE MANUFACTUTRER'S INSTALLATION | | | INSTRUCTIONS OR 35'- SEE SECTIONS 504.8.4.1 AND | | | 504.8.4.2 FBC M. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2020-05-19 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2020-05-19 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2020-05-19 |
Time |
10:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2020-04-06 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2020-04-06 |
Time |
08:14 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2020-04-06 |
Time |
06:13 |
Sent To |
|
|
| Notes |
| 2020-04-06 08:14:45 | 1) SEVERAL PLUMBING SHEETS HAVE BEEN SUBMITTED FOR | | | REVIEW BUT THE REVISION SHEET THAT WAS SUBMITTAL DOES | | | NOT LIST ANY PLUMBING TO BE REVISED. CLARIFY. WPB | | | AMEND. TO FBC SEC. 107.2.1. | | | 2) SUBMIT DOCUMENTATION THAT CLEARLY DESCRIBES THE | | | SCOPE OF THE PLUMBING CHANGES TO BE MADE. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2020-06-02 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2020-06-02 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2020-06-02 |
Time |
09:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2020-05-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-05-14 |
Time |
16:20 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-05-14 |
Time |
16:20 |
Sent To |
|
|
| Notes |
| 2020-05-14 16:23:25 | ELECTRICAL DRAWINGS = ENGINEER CANNOT SELF-CERTIFY THE | | | DIGITAL SIGNATURE | | | 668.003(2) AND (3), F.S. | | | (2) A PROFESSIONAL ENGINEER UTILIZING A DIGITAL | | | SIGNATURE TO ELECTRONICALLY SIGN AND SEAL ENGINEERING | | | PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS SHALL HAVE | | | THEIR IDENTITY AUTHENTICATED BY A CERTIFICATION | | | AUTHORITY. | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2020-04-06 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2020-04-06 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2020-04-06 |
Time |
11:38 |
Sent To |
|
|
| Notes |
| 2020-04-06 11:39:56 | DRAWINGS NEED TO BE ELECTRONICALLY SIGNED AND SEALED TO | | | BE USED IN ELECTRONIC PLAN REVIEW. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2020-05-14 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2020-05-14 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2020-05-14 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-14 10:43:55 | ZONING APPROVED WITH THE FOLLOWING PROVISO: | | | | | | 1.) MINOR SITE PLAN AMENDMENT REQUIRED FOR THE AS-BUILT | | | PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY | | | (C.O.). |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2020-04-09 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2020-04-09 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
2020-04-09 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-09 10:22:06 | ZONING APPROVED WITH THE FOLLOWING PROVISO: | | | | | | 1.) MINOR SITE PLAN AMENDMENT REQUIRED FOR THE AS-BUILT | | | PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY | | | (C.O.). | | | | | | (REFERENCE: MASTER PERMIT #20031048) |
|
|